fema operations brief for nov 22, 2013

28
1 Daily Operations Briefing Friday, November 22, 2013 8:30 a.m. EST

Upload: homeland-security-jobs-hq

Post on 15-Jan-2015

174 views

Category:

News & Politics


2 download

DESCRIPTION

Federal Emergency Management Agency Operations Briefing for Friday, November 22, 2013 Presented by Homeland Security Jobs HQ at http://homelandsecurityjobshq.com

TRANSCRIPT

Page 1: FEMA Operations Brief for Nov 22, 2013

1

•Daily Operations Briefing Friday, November 22, 2013

8:30 a.m. EST

Page 2: FEMA Operations Brief for Nov 22, 2013

2

Significant Activity: Nov 21 – 22 Significant Events: Severe weather recovery (FINAL)

Tropical Activity:

• Atlantic – Tropical cyclone activity not expected next 48 hours

• Eastern Pacific – Tropical cyclone activity not expected next 48 hours

• Central Pacific – No tropical cyclones expected through Sat night

• Western Pacific – No activity threatening U.S. territories

Significant Weather:

• Heavy snow – Higher elevations of Great Basin and Central Rockies

• Heavy rain w/possible flash flooding – Desert Southwest

• Rain/snow mix – Great Lakes

• Rain and thunderstorms – Southern Plains to Mid-Atlantic

• Critical Fire Weather Areas/Red Flag Warnings: None

• Space Weather: No space weather storms observed/predicted

Earthquake Activity: None

Declaration Activity: None

Page 3: FEMA Operations Brief for Nov 22, 2013

3

Severe Weather Outbreak Nov 17-18 (Final) FEMA Region V

• RRCC activated to Level III; RWC remains at Watch/Steady State

• IMAT and LNO deployed to IL

▲Joint PDAs for 15 (+2) counties in IL (IA began Nov 21 and PA to begin Dec 2)

• Region-wide data:

• Fatalities: 8 (confirmed); Injured: 150-200 unconfirmed (media sources)

• Power outages: 23,581 (peak 753,352)

• Illinois

• SEOC at Level III (Limited Staffing)

▲Governor declared state of disaster for 15 (+2) counties

• 6 confirmed fatalities

▲Sporadic power outages remain

▲Total number of homes damaged/destroyed could exceed 1,500

• 3 shelters open with 14 occupants

• Michigan

• SEOC at Normal Operations

• 2 confirmed fatalities

▲21,051 customers remain without power; full restoration by Sat

• 2 shelters open with 7 occupants

Source: Region V

Brookport, IL

Page 4: FEMA Operations Brief for Nov 22, 2013

4

Severe Weather Outbreak – Nov 17-18

Source: Region V

Page 5: FEMA Operations Brief for Nov 22, 2013

5

Severe Weather Outbreak – Nov 17-18

Before After

Page 6: FEMA Operations Brief for Nov 22, 2013

9

http://www.hpc.ncep.noaa.gov/noaa/noaad1.pdf

National Weather Forecast

Page 7: FEMA Operations Brief for Nov 22, 2013

10

Active Watches/Warnings

http://www.nws.noaa.gov/largemap.php

Page 8: FEMA Operations Brief for Nov 22, 2013

11

Cold Weather Outlook

Friday Low Friday High

Sunday High Sunday Low

Page 9: FEMA Operations Brief for Nov 22, 2013

12

Total Snow Forecast

Page 10: FEMA Operations Brief for Nov 22, 2013

13

http://www.hpc.ncep.noaa.gov/qpf/day1-3.shtml

Precipitation Forecast – 3 Day

Day 1

Day 2

Day 3

Page 11: FEMA Operations Brief for Nov 22, 2013

14

Precipitation Forecast – 4 and 5 Day

Page 12: FEMA Operations Brief for Nov 22, 2013

15

River Forecast – 7 Day

Page 13: FEMA Operations Brief for Nov 22, 2013

16

Convective Outlooks Days 1 – 3

Day 1 Day 2

Day 3

Page 14: FEMA Operations Brief for Nov 22, 2013

17

Critical Fire Weather Areas Days 1 – 8

Day 1 Day 2

Day 3-8

Page 15: FEMA Operations Brief for Nov 22, 2013

20

http://www.cpc.ncep.noaa.gov/products/predictions/threats/threats_ie.php

U.S. Drought Monitor – as of November 21 d

Page 16: FEMA Operations Brief for Nov 22, 2013

21

NOAA Scales Activity (Range: 1/minor to 5/extreme)

Past

24 Hours Current

Next

24 Hours

Space Weather Activity: None None None

• Geomagnetic Storms None None None

• Solar Radiation Storms None None None

• Radio Blackouts None None None

Space Weather

Sunspot Activity

http://www.swpc.noaa.gov/drapglobal.html http://spaceweather.com/

HF Communication Impact

Page 17: FEMA Operations Brief for Nov 22, 2013

25

Declaration Requests in Process Requests

APPROVED (since last report)

Requests DENIED

(since last report)

2 Date Requested 0 0

NE – DR Severe Storms, Tornadoes, Winter Storms, and Flooding November 13, 2013

Rosebud Sioux Tribe – DR (Appeal) Severe Storms, Straight-line

Winds, and Flooding October 29, 2013

Disaster Requests & Declarations

Page 18: FEMA Operations Brief for Nov 22, 2013

28

Joint Preliminary Damage Assessments

Region State /

Location Event IA/PA

Number of Counties Start – End

Requested Complete

V IL Severe Storms and Tornadoes

November 17-18, 2013

IA 15 (+2) 1 11/21-TBD

PA 15 (+2) 0 12/2-TBD

X AK

Kenai Peninsula Southern Borough

Flooding

October 27-28, 2013

PA 1 0 11/19-11/21

Page 19: FEMA Operations Brief for Nov 22, 2013

29

Open Field Offices as of November 22, 2013

Page 20: FEMA Operations Brief for Nov 22, 2013

30

Total Deployed Detailed Not

Available Available Cadre Status

40 26 1 2 11

OFDC Cadre Member Status

Total Available Type 1 Type 2 Type 3 Type 4

11* 1 5 2 3

As of: 11/19/2013

* All Type 1 FCOs are available unless deployed to a Level 1 event

Total Deployed Assigned Available Status

9 6 4 2

Federal Coordinating Officer

Federal Disaster Recovery Coordinator

Page 21: FEMA Operations Brief for Nov 22, 2013

31

MCOV Fleet / Deployment Status

Fully Mission Capable 54 Partially Mission Capable 0 Non-Mission Capable 1 Total Not Deployed 50

MCOV FLEET STATUS MCOV DISASTER SUPPORT DEPLOYMENTS

Location Units

Assigned Available

FMC Deployed

Committed PMC Unavailable DR-State OPCON

En

Route Unit Prep

Open

Request Notes:

MERS Maynard 3 3 0 0 0 DR-4145-CO 5 0 0

MERS Frederick 8 8 0 0 0 0 0 0

MERS Thomasville 14 13 1 0 0 0 0 0

DC Ft Worth 20 15 4 0 10 0 0 0

MERS Denver 2 2 0 0 0 0 0 0

MERS Bothell 4 4 0 0 0 0 0 0

Sacramento 4 4 0 0 0 0 0 0

TOTAL 55 49 5 0 1 TOTAL 5 0 0 0

Units in route for turn-in included in above totals.

2 0 0

Data as of: 11/21/13 @ 1500

Page 22: FEMA Operations Brief for Nov 22, 2013

32

IA Registration Statistics

IA Registrations and IHP Amounts as of November 21, 2013 @ 1500

DR/EM # - State Registrations Approved

Applicants Total HA Approved

Total ONA

Approved Total IHP Approved

4145 - CO 27,486 16,135 $50,474,460 $4,212,531 $54,686,991

Totals 27,486 16,135 $50,474,460 $4,212,531 $54,686,991

24 hour change +23 +19 +$180,490 +$18,911 +$199,401

NPSC Call Data for November 20, 2013

Total Calls Answered (Help Line + Registration Intake) 1,556

Average time to answer call 12 seconds

Maximum / Minimum time to answer a call 58 seconds / 9 seconds

Page 23: FEMA Operations Brief for Nov 22, 2013

33

Housing Inspection Statistics

Inspection Data as of November 21, 2013 @ 1500

DR #-State Inspectors Inspections

Assigned

Inspections

Completed Inspection % Complete

Turnaround Time

(Days)

4145 - CO 14 25,088 24,927 99.36% 2.3

TOTAL 14 25,088 24,927 99.36% 2.3

24 hour change -1 +50 +60 +0.04% +0.0

Page 24: FEMA Operations Brief for Nov 22, 2013

36

IMAT Status National Teams

Team Status Team Status Team Status

Blue/White/

Red East CO West

Regional Teams Team Status Team Status Team Status

Region I Region V IL Region VIII SD

Region II Region VI-1 Region IX-1

Region III PA Region VI-2 NM Region IX-2

Region IV-1 Region VII KS Region X

Region IV-2 NC Incident Management Assistance Team

= Assigned/Deployed

= Not Mission Capable

= Available/Mission Capable

= Available/Partially Mission Capable

Page 25: FEMA Operations Brief for Nov 22, 2013

37

Urban Search & Rescue INCIDENT SUPPORT TEAMS (Red-White-Blue) – Monthly On Call Rotation

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

WEST CENTRAL EAST

Team Status Team Status Team Status

CA-TF1 Available AZ-TF1 Available FL-TF1 Available

CA-TF2 Available CO-TF1 Available FL-TF2 Available

CA-TF3 Available IN-TF1 Available MA-TF1 Available

CA-TF4 Available MO-TF1 Available MD-TF1 Available

CA-TF5 Available NE-TF1 Available NY-TF1 Available

CA-TF6 Available NM-TF1 Conditional PA-TF1 Available

CA-TF7 Available NV-TF1 Conditional VA-TF1 Available

CA-TF8 Available TN-TF1 Available VA-TF2 Available

WA-TF1 Available TX-TF1 Available OH-TF1 Available

UT-TF1 Available

= Assigned/Deployed = Out-of-Service

= Available/Mission Capable = Available/Partially Mission Capable

Page 26: FEMA Operations Brief for Nov 22, 2013

38

RRCC / Regional Watch Center Status

= Not Mission Capable = Available/Partially Mission Capable = Available/Mission Capable

Region RRCC Regional Watch Center

I Not Activated Maynard MOC (24/7)

II Not Activated 24/7

III Not Activated 24/7

IV Not Activated 24/7

V Level III 24/7

VI Not Activated Denton MOC (24/7)

VII Not Activated 24/7

VIII Not Activated Denver MOC (24/7)

IX Not Activated 24/7

X Not Activated Bothell MOC (24/7)

Page 27: FEMA Operations Brief for Nov 22, 2013

39

National Team Status

Team/Status Current Location Remarks

National Watch Center Washington, DC Watch/Steady State

NRCC Washington, DC Not Activated

HLT Miami, FL Activated

DEST Washington, DC Not Activated

Mission Capable Partially Mission Capable Not Mission Capable

Page 28: FEMA Operations Brief for Nov 22, 2013

41