Page 1: Feeder Separation Project

An Economical and Efficient Approach to Electrical Survey Data and Creation

of Topology

Page 2: Feeder Separation Project

Scope of work

• GIS Survey(Support).

• Export of survey data to NA tool

• Network Analysis

• BOQ Generation and approval

Page 3: Feeder Separation Project

Offerings

• Topo Bridge Tab for survey

• Data Conversion Service

• Network Analysis Service

• Topo Bridge NA for Network Analysis

Page 4: Feeder Separation Project

GIS Survey

• Survey of HT

• Survey of DT

• Survey of LT

• Survey of CI

• Marking of Poles

• Excel preparation

Page 5: Feeder Separation Project

Data Export and NA

1. Preparation of Network model for Network analysis software

2. Existing Analysis and proposal Analysis

3. BOQ and Proposal AUTOCAD Diagrams preparation.

Page 6: Feeder Separation Project

 Preparation Network model for Network analysis software

• Checking of GIS Survey of HT, LT, DT, and CI for Data Anamolies.

• Preparation of topology from GIS Survey data using “TOPOBRIDGE”.

• Checking for Disconnections and Long lines.• Extraction of Topology data into Network Analysis

Software’s like Cymdist/Neplan/etc through “TOPOBRIDGE”.

• Preparation of DTR wise Loading data and Loading percentage according to AG, DOM Loads through “TOPOBRIDGE”.

Page 7: Feeder Separation Project

Existing Analysis and proposal Analysis

• Performing Existing analysis and calculating

Technical Losses• Calculation including LT network for Existing

Feeder and preparation of its analysis report which includes

• DT Loading profile.• Feeder wise Analysis.• Technical Loss report• Proposal Analysis for separation of AG and NON-

AG Loads.

Page 8: Feeder Separation Project

BOQ and Proposal’s AUTOCAD Diagrams preparation.

• Creation of Existing and proposed full HT Diagrams

• Creation of Individual and Proposed DTR diagrams

• Digitization of SOI Map.

• Preparation of BOQ

Page 9: Feeder Separation Project

Inputs required:

Survey Data of  LT HT DT CI 

SOI MAPSAnalysis Report Templates(optional)Autocad templates(optional)BOQ Template(optional)

Page 10: Feeder Separation Project

Sample Project Plan

Assuming a feeder with following particulars

•Length of Feeder: 30kM

•No of HT poles: 155

•No of DT: 20

•No of LT poles: 300

•No of CI:1200

Page 11: Feeder Separation Project

GIS Survey

S.No Activity SVTS(Man days)

Convetional Method(Man days)

You save(Man days)

How?

1 GIS Survey 60 60 0 Using “Topo Bridge Tab”

2 Data Transfer 1min 5 5 Using “Topo Bridge Tab”

3 Resurvey 0 15 15 Using “Topo Bridge Tab”

4 Other 0 15 15

5 Total 60 95 35 Using “Topo Bridge Tab”

*These figures are approximations and considered depending on our past study. Values may vary depending on field conditions

Page 12: Feeder Separation Project

Data Transfer and NA

S.No Activity SVTS(Man days)

Convetional Method(Man days)

You save(Man days)

How?

1 Excel to NA 1min 3 3 Using “Topo Bridge NA”

2 Analysis 7 11 4 Using “Topo Bridge NA”

3 BOQ & Approval 1 1 0 Using “Topo Bridge NA”

4 Incase of resurvey NA 15 15 Using “Topo Bridge NA”

5 Total 8 30 22 Using “Topo Bridge NA”

Page 13: Feeder Separation Project

Manday Savings/feeder

Page 14: Feeder Separation Project

Financial Savings/Feeder

Page 15: Feeder Separation Project

Man day savings for 100 similar feeders

Page 16: Feeder Separation Project

Financial savings for 100 similar feeders

Page 17: Feeder Separation Project

Project plan for 100 feeders

Perticulars Target

No of feeders 100

Team size 4

No of days required 180

No of teams required 8

No of “Topo Bridge tab” required 16

Analysis team required 4

No of feeders can be completed/month 16

Page 18: Feeder Separation Project

Deliverables• Network GIS Shape Files• NA software (Cymdist, Neplan like) compliant files• DTR wise List• Existing Analysis Report for technical Losses• DTR Loading profile• Feeder Technical Loss report• Listing of Overloaded transformers and overloading conductors• DTR-Wise Technical parameters comparison List(After and Before {Feeder

Separation}).• PDF’s of all the DT & downstream LT Networks whose network was subjected for

change in the proposal analysis (Existing DT & LT Network Diagrams).• Full HT Network which includes HT points, HT Lines, DT’s of Existing network.• Full HT Network which includes proposed HT points, HT Lines and DT’s.• BOQ • Digitized SOI Map.

(All deliverables are soft copies only)

Page 19: Feeder Separation Project

Thanking you