1Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
By: PBI Air Traffic Control
Date: January 19, 2017
Federal AviationAdministration
MAR-A-LAGO POTUS TFR
USER & STAKEHOLDER
BRIEFING
2Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
December 26, 2016 • PBI Departure
• PBI Arrival
• BCT CAYSL Arrival
• BCT Departure
3Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
PBIA&Mar-a-Lago
4Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
POTUSTFR
10nm
InnerCore
30nm
OuterCore
Surface-17,999’
5Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
POTUS TFR Background
Nov 17 USSS defined TFR requirements for the POTUS Mission
at the Mar-a-Lago residence located 2.14 nm from PBIA
Jan 5 USSS, TSA, PBIA DOA and FAA meet review the following
procedures for meeting those requirements
Jan 18 Follow Up Meeting for procedure & coordination development
Jan 19 Pilot, user & stakeholder briefing scheduled
Jan 20 POTUS TFR active only when POTUS in residence
6Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR PROHIBITIONS
OPERATIONSNOTAUTHORIZED
vFLIGHTTRAINING
vPRACTICEINSTRUMENTAPPROACHES
vAEROBATICFLIGHT,GLIDEROPERATIONS,SEAPLANEOPERATIONS
vPARACHUTEOPERATIONS,ULTRALIGHT,HANGGLIDING
vBALLOONOPERATIONS
vBANNERTOWINGOPERATIONS
vSIGHTSEEINGOPERATIONS
vMAINTENANCETESTFLIGHTS
vRCMODELAIRCRAFTorMODELROCKETS
vUNMANNEDAIRCRAFTSYSTEMS(UAS)
v*AGRICULTURE/CROPDUSTING,ANIMALPOPULATIONCONTROLFLIGHTS
v*UTILITYANDPIPELINESURVEYOPERATIONS
7Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR Inner Core10nmRadius/Surfaceto17,999’
ALLOPERATIONSAREPROHIBITED
EXCEPT
v POTUSAIRCRAFT
v MILITARYAIRCRAFTSUPPORTINGUSSS
v APPROVEDLAWENFORCEMENT,AIRAMBULANCE&FIREFIGHTINGOPS
v SCHEDULEDCOMMERCIAL&CARGOAIRCRAFTUNDERTSASTANDARD
SECURITYPROGRAMSANDARRIVE/DEPARTPART139AIRPORTS
v GENERALAVIATIONAIRCRAFTUSE“GATEWAYAIRPORTPROCEDURES”
8Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR Gateway Procedures
ArrivalGatewayAirports
OrlandoInternationalAirport(MCO)
Ft.LauderdaleInternationalAirport(FLL)
PointofDeparture>HPN,TEBandIAD(testprogram)
Departure(PBI)GatewayScreening
AvailableatSignature,JetAviationandNetJetFBOs
AtlanticAviationrestrictedforAF1parking(willbereviewedafter2visits)
§RegisterwithTSAtogatewayscreen24hrsbeforedeparting(phone#inNOTAM)
§GatewayscreeningbyTSAdailyfrom0800-1700L
§AircraftmustmaintainradiocontactwithATC
§ContinuouslysquawkATCassigneddiscretecode
§Nointermediatestopsunlessanemergency
§OnceprocessedbyTSAaircraftcontinuouslymonitoredforcompliance
9Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
LimitedOperationsnotauthorizedbutmaybeconsidered
vLocalmissionaircraftthatcannotconductpointtopointoperations
§ FPL,PowerLine,PipeLine,WaterManagement
§ SugarFieldandAgriculture/Crop
vUSSS,TSAandFAASecurityreviewon“CasebyCasebasisandRealTime”
vRequest24-48hoursinadvance
§ ContactPBITRACON(561)684-9047
§ Informationwillincludedate,time,missionintent,routeonGoogle
map,contactnumbertoterminate
§ Flightsmustbescriptedandpredictable
§ ApprovalssubjecttodelayorchangebasedonPOTUSmovements
vGatewayProceduresandTSAscreeningwillalwaysberequired
10Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR Inner Core Impacts
PalmBeachInternationalAirport
Nopracticeapproaches
Nocoastlinetraffic
DepartureheadingsRWY10L/10R/14toavoidbufferzone
AllGAarrivalsmustuseRWY32
ArrivalsusingRWY28Ronmodifiedflightpath
AllGAaircraftarriving/departingmustuseGatewayProcedures
LantanaAirport
NooperationsexceptarrivalsfromGatewayAirports
Optionsbeingreviewedtopotentiallyallowlimitedoperations
GwinnAirport(UTX)
Flighttestingrestricted
11Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR Outer Ring10- 30NMRadius
SFCto17,999
vOuterringlimitedtoarrivingordepartinglocalairports
vOverflightsmaybeapprovedbasedonATCworkloadandconditions
vAircraftmaynotloiter,mustflypointtopointand
§ Musthaveanactiveflightplan- IFRorVFR
§ Squawkingwiththeassigneddiscretecodepriortodeparture
§ AlwaysremaininradiocontactwithATC
12Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
PBIA Runway Use Plan
East
Depart RWY 10L/10R/14 with headings to avoid buffer zone
Arrive No change
West
Depart RWY 28R/28L
Arrive No overflight of buffer zone
GA aircraft must use RWY 32, cannot use RWY 28R
Air carriers expect RWY 32 (6,517’ available)
RWY 28R modified arrival & avoid buffer zone
13Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
PBI Departure Heading Avoid Buffer Zone
10L
Buffer Zone
14Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR PBI DeparturesRWY 10L Departure Heading to avoid buffer zone
15Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR PBI ArrivalsRWY 28R Arrivals
Both ILS and RNAV finals for RWY 28R adjacent to/over residence
16Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
TFR PBI ArrivalsRWY 28R 12/22/2016
17Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
Arrive RWY 32 & RWY 28R VRNP Modified Approach
RWY 28 VRNP development by FAA & Southwest Airlines
18Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
Runway AAR ADR Total
10L 38 20
14 2
10L 30 28
14 2
10L 24 38
14 2
10L 34 20
14 2
10L 28 28
14 2
10L 22 36
14 2
10L 28 20
14
10L 24 28
14
10L 22 34
14
PBI-TFRRates EAST
Notes
NochangeinEastratesfromnormal
operations
Departures-Max
Arrivals-Max
IMC
Arrivals-Max
VMC
MVMC
PBItypically75%East
Alldepartureheadingschange
Verifyw/USSS>GAuseRWY10R
56
58
60
Mixed-Arrivals&Departures
Departures-Max
64
Arrivals-Max
Mixed-Arrivals&Departures
Departures-Max
48
52
56
60
Mixed-Arrivals&Departures
60
East Airport Capacity – No Change
19Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
West Airport Capacity – VMC Mixed <12%
28R 4/24 20/24
32 26/4
28R 4/28 28/32
32 24/4 ArriveRWY32
DepartRWY28R
28R 4/24 34/42 NewconfigforPBIcontrollers/FLMs
32 20/4
28R 4/32 20/24
32 26/4
28R 4/28 28/28
32 24/4 Primaryarrivalallaircraft
NoILS-RNPonly
28R 4/24 34/40 GAmustuse(USSS)
32 22/4 badturnoffs
28R 4/32 20/20
32 26/0
Off-setarrivalpath
28R 4/28 28/28 VRNP-chartedvisual
32 24/0 IRNP-est.7monthtopub
ILS28Remergonly-USSSAPREQ
28R 4/24 34/36 arrivalsreqincreasespaceRWY32
32 22/0 NoGAarrivals
TWYC-inprogresseastside
TWYA-inprogresswestside
NotesWEST
56/56
60/60
Arrivals-Max
RWY32
RWY28R
AirportConstruction
Departures-Max
Mixed-Arrivals&Departures
50/60
56/60
60/68
50/52
IMC
MVMC
50/62
56/64
58/70
Departures-Max
Departures-Max
Mixed-Arrivals&Departures
RunwayUsePlan
Sequencingto32atPBIand23at
BCTwillbeindependentoperations
performedby1controller
BlackisTFRrates
Blueiscurrentrates
VMC
Arrivals-Max
Mixed-Arrivals&Departures
Arrivals-Max
20Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
FXE&SUAOperations
IFR
Squawk&talk- normal
VFR
FXE- 2nmCutouttoOuterCore
SUA- Cutoutbeingreviewed
Don’tenterTFRunlessinprocess
PatternaircraftstayoutsideTFR
orifunsureSquawk
FXE7701
SUA7702
Alert Area 291A
TFR NOTAM closes north side
21Federal AviationAdministration
Pilot / Stakeholder Briefing - Mar-a-Lago TFR Procedures
January 19, 2017
This is Step #1 for 4 or 8 years
All processes will be reviewed and refined, if able,
with TFR experience & data
Safety, POTUS mission and community impacts
are priorities