february 2011 construction photos - bureau of reclamation · february 2011 construction photos page...

4
February 2011 Construction Photos Page 1 Balfour Beatty subcontractor Harreld’s Hi Voltage - foreground. Installation of last 84” pump - background. Balfour Beatty welding trash rack supports and tuning baffles at Pumping Plant.

Upload: others

Post on 28-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers

February 2011 Construction Photos

Page 1

Balfour Beatty subcontractor Harreld’s Hi Voltage - foreground. Installation of last 84” pump - background.

Balfour Beatty welding trash rack supports and tuning baffles at Pumping Plant.

Page 2: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers

February 2011 Construction Photos

Page 2

Balfour Beatty subcontractor Central Sierra Electric installing Fish Screen motor control center, conduit, & bracing.

Balfour Beatty erecting Switchyard steel structures with takeoff structure steel staged for erecting.

Page 3: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers

February 2011 Construction Photos

Page 3

Balfour Beatty installing the oil containment system around the two transformers in the Switchyard.

Balfour Beatty subcontractor Meyers Earthwork excavating the forebay upstream side of the Pumping Plant

Page 4: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers

February 2011 Construction Photos

Page 4

Balfour Beatty subcontractor Virginia Transformers checking the installation of the cooling radiators.

Balfour Beatty subcontractor Central Sierra Electric pulling cables into Fish Screen Motor Control Center