FEASIBILITY/DETAILED PROJECT REPORTS (COAL / LIGNITE / BAGASSE BASED) STATUS AS ON AUGUST 25, 2009 Sl. No. Name of Project Capacity Scope of Work Date of Award Present Status 1. Colgong Super Thermal Power Station 3000 MW Preparation of Techno- economic Project Feasibility Report March 1976 Completed 2. Ray Super Thermal Power Station 2400 MW Preparation of Techno- economic Project Feasibility Report March 1976 Completed 3. Indraprastha Thermal Power Station Extension at DESU/ I.P. Station 1x200 MW Preparation of Techno- economic Project Feasibility Report June198 6 Completed 4. Ramagundam Thermal Power Station Extension 2x210 MW Preparation of Detailed Project Report Nov. 1988 Completed 5. Delhi Electric Supply Undertaking 200 MW Preparation of Techno- economic Project Feasibility Report Nov. 1977 Completed 6. Coast based Thermal Power Station at Krishnapatnam in Andhra Pradesh 2x500 MW Preparation of Feasibility Report Aug. 1989 Completed 7. Muddanur Thermal Power Station Stage-II in Andhra Pradesh 2x210 MW Preparation of Feasibility Report Aug. 1989 Completed 8. Singareni Collieries Co. Ltd. – Captive Power Plant 60 MW Preparation of Feasibility Report May 1989 Completed 9. Muzaffarpur Thermal Power Station 2x110 MW Preparation of Detailed Project Report and site investigations Feb. 1978 Completed

Upload: others

Post on 30-Apr-2020

5 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

FEASIBILITY/DETAILED PROJECT REPORTS(COAL / LIGNITE / BAGASSE BASED)

STATUS AS ON AUGUST 25, 2009

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

1. Colgong Super Thermal Power Station

3000 MW

Preparation of Techno-economic Project Feasibility Report

March 1976

Completed

2. Ray Super Thermal Power Station

2400 MW

Preparation of Techno-economic Project Feasibility Report

March 1976

Completed

3. Indraprastha Thermal Power Station Extension at DESU/ I.P. Station

1x200 MW

Preparation of Techno-economic Project Feasibility Report

June1986

Completed

4. Ramagundam Thermal Power Station Extension

2x210 MW

Preparation of Detailed Project Report

Nov. 1988

Completed

5. Delhi Electric Supply Undertaking

200 MW Preparation of Techno-economic Project Feasibility Report

Nov. 1977

Completed

6. Coast based Thermal Power Station at Krishnapatnam in Andhra Pradesh

2x500 MW

Preparation of Feasibility Report

Aug. 1989

Completed

7. Muddanur Thermal Power Station Stage-II in Andhra Pradesh

2x210 MW

Preparation of Feasibility Report

Aug. 1989

Completed

8. Singareni Collieries Co. Ltd. – Captive Power Plant

60 MW Preparation of Feasibility Report

May 1989

Completed

9. Muzaffarpur Thermal Power Station

2x110 MW

Preparation of Detailed Project Report and site investigations

Feb. 1978

Completed

Page 2: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

10. Captive Power Plant of Heavy Engineering Corpn. Ltd.

2x20 MW Preparation of Detailed Project Report

Aug. 1981

Completed

11. Hindustan Zinc Limited

Preparation of Feasibility-cum-Project Report for power generation by utilising system steam Pressure difference between generation and process utility in the Waste Heat Boiler of Roaster Plants

Aug. 1985

Completed

12. Tuticorin Thermal Power Station Stage-IV

1x500 MW

Preparation of Feasibility Report

Aug. 1991

Completed

13. Barsingsar Lignite Thermal Power Station in Rajasthan of Neyveli Lignite Corporation

2x120 MW

Preparation of Detailed Project Report

Aug. 1991

Draft Report Submitted. Project offered for privatisation

14. Captive Power Plant of M/s Raymond Woollen Mills Ltd., Chhindwara, U.P.

5 MW Preparation of Feasibility Report

Dec. 1991

Completed

15. Muzaffarpur Thermal Power Station Extension Stage-II

2x250 MW

Preparation of Detailed Project Report

Dec.1992 Completed

16. Lignite based Power Station Near Ghogha in Bhavnagar Distt., Gujarat

250 MW Preparation of Feasibility Report and Project Report

April 1992

Completed

17. Lignite based Power Station at Mangrol in Surat Distt., Gujarat

250 MW Preparation of Feasibility Report and Project Report

May 1992

Completed

18. Korba West Thermal Power Station by Mukand Ltd.

2x210 MW

Updating of Feasibility Report

June 1992

Completed

Page 3: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

19. Gouripore Thermal Power Station by Birla Technical Services

2x67.5 MW

Preparation of Project Report

June 1992

Completed

20. Mangalore Thermal Power Station by Jaiprakash Industries

2x150 MW

Preparation of Project Report

Dec. 1992

Completed

21. Singareni Collieries Co. -Captive Power Plant

2x110 MW

Preparation of Feasibility Report

Sept. 1992

Completed

22. Ramagundam Thermal Power Station Extension Stage-II

2x250 MW

Preparation of Detailed Project Report

April 1993

Completed

23. Kothagudem Thermal Power Station Extension Stage-V

2x250 MW

Preparation of Detailed Project Report

May 1993

Completed

24. DLF Energy Systems – Captive Power Plant for Coal Washery

1x10 MW Preparation of Feasibility Report

Dec. 1992

Completed

25. Metdist Limited, UK – Captive Thermal Power Station for Smelter Complex in Gujarat

75 MW Preparation of Feasibility Report

Aug. 1993

Completed

26. Ramagundam Thermal Power Station Extension Stage-II by GVK Industries

2x250 MW

Preparation of Detailed Project Report

Oct. 1993

Completed

27. Krishnapatnam Coast based Thermal Power Station Stage-II

4x500 MW

Preparation of Feasibility Report

Dec. 1993

Draft Report

submitted; Project

offered for Privatisatio

n

Page 4: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

28. Raigarh Thermal Power Station for Jindal Strips Ltd.

2x500 MW

Preparation of Pre-Feasibility Report

March 1994

Completed

29. Captive Power Plant for Nava Bharat Ferro Alloys Ltd.

30 MW Preparation of Feasibility and Project Report

April 1994

Completed

30. Captive Power Plant for Orient Paper Mills at Amlai, M.P.

1x67.5 MW

Preparation of Pre-Feasibility Report

April 1994

Completed

31. Sabarmati Thermal Power Station of Ahmedabad Electricity Co. Ltd.

1x120 MW

Preparation of Detailed Project Report

Oct. 1994

Completed

32. Captive Power Plant for Binani Cement

25 MW Preparation of Feasibility Report considering lignite/coal or naphtha/ HSD or furnace oil/ diesel as fuel and new or old plant

May 1995

Completed

33. Kothagudem Thermal Power Station Extension Stage-VI

2x250 MW

Preparation of Project Report

Aug. 1995

Completed

34. Captive Power Plant at Garhwa works for Bihar Caustic & Chemicals Ltd.

1x25 MW Preparation of Feasibility Report

Oct. 1995

Completed

35. North Madras Thermal Power Station of Tri-Sakthi Energy Private Ltd.

1x500 MW

Preparation of Detailed Project Report

Oct. 1995

Completed

36. Captive Power Plant at Rajmundhry for A.P. Paper Mills Ltd.

1x60 MW Preparation of Feasibility Report

Dec. 1995

Completed

Page 5: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

37. Yamunanagar Thermal Power Station of United Development Inc., Member of Eisenburg Group of Companies, Israel

2x350 MW

Preparation of Project Report

Feb. 1996

Completed

38. Naraj Thermal Power Station of India Power Partners Pvt.Ltd.

2x250 MW

Preparation of Detailed Project Report

Aug. 1995

Completed

39. Lignite based Power Station near Ghogha in Bhavnagar Distt., Gujarat

3x120 MW

Preparation of Detailed Project Report

May Completed

40. Sabarmati Thermal Power Station ‘C’ Phase I & II of The Ahmedabad Electricity Co. Ltd.

2x30 MW Preparation of Feasibility Report

March 1996

Completed

41. Vijayawada Thermal Power Station of APSEB

1x500 MW

Preparation of Detailed Project Report

June 1996

Completed

42. Power Plant at Hazira for KRIBHCO

10 MW Preparation of Feasibility Report

Oct. 1997

Completed

43. Goindwal Thermal Power Station of GVK Industries

2x250 MW

Preparation of Detailed Project Report

March 1998

Completed

44. Sanjay Gandhi Thermal Power Station of MPEB

1x500 MW

Preparation of Feasibility/ Project Report

May 1999

Completed

45. Coal based Thermal Power Project at Maithon Right Bank, Dhanbad for BSES Limited

4x250 MW

Preparation of Detailed Project Report

July 2000 Completed

46. Bagasse based Cogeneration Plant at

24 MW Preparation of Detailed June Completed

Page 6: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

Sameerwadi in Karnataka for Godavari Sugar Mills Ltd.

Project Report 2001

47. Coal based Green field Thermal Power Project at Kodarma in Jharkand for Damodar Valley Corporation

2x500 MW

Preparation of Detailed Project Report

Dec. 2001

Completed

48. Coal based Green field Thermal Power Project at Maithon Left Bank area in West Bengal for Damodar Valley Corporation

2x500 MW

Preparation of Detailed Project Report

Dec. 2001

Completed

49. Coal based Captive Power Plant in Orissa for Jindal Steel & Power Limited

100 MW Preparation of Techno-commercial Feasibility Report

Dec. 2001

Completed

50. Coal based Thermal Power Station at Amarkantak Chachai, Dist. Shahdol for Madhya Pradesh State Electricity Board

210 MW Preparation of Feasibility Report

Dec. 2001

Completed

51 Coal based Power Plant at Binani Zinc, Binanipuram, Kochi – Binani Industries Limited

50 MW Preparation of Feasibility Report

Feb. 2002

Completed

52. IGCC Demonstration Plant at Dadri Station of Nexant, USA

100 MW Preparation of Feasibility Report

May 2002

Completed

53. Yamunanagar Thermal Power Project for Haryana Power Generation Corporation Limited

2x250 MW

Preparation of Detailed Project Report

July 2002 Completed

Page 7: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

54. Biomass based Power Plant at Bellary, Karnataka – Shiv Sai Power Systems Pvt. Limited

7.5 MW Preparation of Detailed Project Report

Sept. 2003

Completed

55. Biomass Power Plant at Bangalore of Mangalam Energy Pvt. Ltd.

6 MW Preparation of Feasibility Report

Sept. 2003

Completed

56. Captive Power Plant at Korba of Aryan Coal Benefications Pvt. Ltd.

10 MW Preparation of Feasibility Report

Dec. 2003

Completed

57. Independent Power Plant at Choudwar of Indian Charge Chrome Ltd.

2x60 MW Preparation of Feasibility Report

Feb. 2004

Completed

58. Power Plant at Mundra SEZ, Dist. Kutch for Mundra Special Economic Zone Limited

1x60 MW Preparation of Feasibility Report

Feb. 2004

Completed

59. Biomass based Power Plants in Karnataka for Karnataka Renewable Energy Development Ltd.

5x7.5 MW

Preparation of Project Report

March 2004

Completed

60. Power Plant at Mundra SEZ, Dist. Kutch for Mundra Special Economic Zone Limited

250 MW Preparation of Detailed Project Report

June 2004

Completed

61. Super Thermal Power Project at Bhaiyathan for Chhattisgarh State Electricity Board

2x500 MW

Preparation of Feasibility Report

June 2004

Completed

62. Captive Power Plant at Raigarh for Jindal Steel & Power Ltd.

3x25 MW Preparation of Detailed Project Report

June 2004

Completed

Page 8: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

63. Captive Power Plant at Korba of Aryan Coal Benefications Pvt. Ltd.

30 MW Preparation of Feasibility Report

July 2004 Completed

64. Coal/Flue Gas based Power Plant at Choudwar, Dist. Cuttack in Orissa of Indian Charge Chrome Limited

10 MW Preparation of Detailed Project Report

Sept. 2004

Completed

65. Coal/Flue Gas based Power Plant at Choudwar, Dist. Cuttack in Orissa of Indian Charge Chrome Limited

25 MW Preparation of Detailed Project Report

Oct. 2004

Completed

66. Thermal Power Plant at Marwa of Chhattisgarh State Electricity Board

2x500 MW

Preparation of Feasibility Report

Dec. 2004

Completed

67. Power Project in Rajasthan of Ranhill (India) Private Limited

330 MW Preparation of Pre-feasibility Report

Jan. 2005

Completed

68. Thermal Power Plant in Talcher area of Ferro Alloys Corporation Ltd.

100 MW Preparation of Detailed Project Report

Feb. 2005

Completed

69. Combined Cycle Gas based Power Plant at Jhajjar for Tata Power Co. Ltd.

2x500 MW

Preparation of Pre-feasibility Report

Feb. 2005

Completed

70. Captive Power Plant of Rawmet Ferrous Ind. Pvt. Ltd.

3x25 MW Preparation of Techno-economic feasibility report

May, 2005

71. Coal based Cogeneration Plant at Baddi of Mahavir Spinning Mills Ltd.

6-8 MW Preparation of Pre-feasibility Report

June, 2005

Completed

Page 9: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

(Vardhman Acrylics Ltd.)

72. Thermal Power Station at Kothagudem, Stage-VI of Andhra Pradesh Power Generation Corporation Limited

1x250 MW

Preparation of Detailed Project Report

July 2005 Completed

73. Thermal Power Project at Marwa of Chhattisgarh State Electricity Board

2x500 MW

Preparation of Detailed Project Report

July 2005 Completed

74. Thermal Power Station at Vijayawada, Unit-7 of Andhra Pradesh Power Generation Corporation Limited

1x210 MW

Preparation of Detailed Project Report

July 2005 Completed

75. Captive Power Plant for the New Expansion Project in Madhya Pradesh of Hindalco Industries Ltd.

4x150 MW

+

1x150 MW

Preparation of Detailed Project Report

Sept. 2005

Completed

76. Thermal Power Station at Kothagudem, Stage-VI of APGENCO

1x500 MW

Preparation of Detailed Project Report

Completed

77. Thermal Power Project at Akrimota, Phase-II of Gujarat Mineral Development Corporation Limited

1x250 MW

Preparation of Feasibility Report

Oct. 2005

Completed

78. Lignite based Power Plant at Merta Road, Rajasthan of D S Constructions Ltd.

500 MW Preparation of Feasibility Report

Oct. 2005

Completed

79. Coal based Power 500 MW Preparation of Feasibility Oct. Completed

Page 10: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

Plant at Chupperbita, Jharkhand of D S Constructions Ltd.

Report 2005

80. Parichha Thermal Power Station Extn. of UP Rajya Vidyut Utpadan Nigam Ltd.

2x250 MW

Preparation of Detailed Project Report

Oct. 2005

Completed

81. Power Plant at Panipat of Weizmann Limited

2x330 MW

Preparation of Feasibility Report

Oct. 2005

Completed

82. Sasan Ultra Mega Project at Sasan, Madhya Pradesh by M/s Sasan Power Ltd.

5x800 MW

Preparation of Feasibility Report

Feb. 2006

Completed

83. Thermal Power Project at Hisar, Haryana

1000/ 1200 MW

Preparation of Detailed Project Report

Mar. 2006

Completed

84. Coal based Mega Power Project at Matanhel-Jhajjar, Haryana of North Delhi Power Ltd. (Tata Power Co. Ltd.)

Preparation of Pre-feasibility Report

April 2006

Completed

85. Cogeneration Plant at Sameerwadi of The Godavari Sugar Mills Ltd.

30 MW Preparation of Detailed Project Report

May 2006

Completed

86. Power Plant at Vill. & Mouza – Palan & Harin Singha of Durgapur Power Limited

4x250 MW

Preparation of Detailed Project Report

June 2006

Completed

87. Coal based Power Plant of Shri Ramrupuai Balaji Steels Limited

5x250 MW

Preparation of Feasibility Report

Aug. 2006

Completed

88. Coal based Coastal 2x500 Preparation of Detailed Sept. Completed

Page 11: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

TPP in Maharashtra of Sunflag Iron & Steel Co. Ltd.

MW/ 4x250 MW

Project Report 2006

89. Coal based Power Plant at Chandrapur, Maharashtra of B.S. Ispat Ltd.

2x35 MW Preparation of Project Report

Oct. 2006

Completed

90. Coal based Power Plant at Chandrapur, Maharashtra of Gondwana Ispat Ltd.

2x50 MW Preparation of Project Report

Oct. 2006

Completed

91. Coal based Power Plant at Chandrapur, Maharashtra of Baidhyanath Power & Mining Ltd.

2x135 MW

Preparation of Project Report

Oct. 2006

Completed

92. Coal based Power Plant at Chandrapur, Maharashtra of Central Collieries Co. Ltd.

2x135 MW

Preparation of Project Report

Oct. 2006

Completed

93. Coal based Power Plant of Bhaskar Group of Publications

2x500 MW

Preparation of Feasibility Report

Dec. 2006

Completed

94. Tilaiya Ultra Mega Project at Tilaiya, Jharkhand by M/s Jharkhand Integrated Power Ltd.

5x800 MW

Preparation of Feasibility Report and Project Report

Dec. 2006

Completed

95. Coal based Power Plant at Nagpur of Grace Industries Limited

100 MW Preparation of Detailed Project Report

Jan. 2007

Completed

96. Coal based Thermal Power Plant at Rayalaseema Stage-III of APGENCO

1X210 MW

Preparation of Detailed Project Report

Feb. 2007

Completed

97. Coal based Thermal 2x660 Preparation of Detailed March Completed

Page 12: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

Power Plant at Jhajjar of HPGCL

MW Project Report 2007

98. Coal based Thermal Power Plant in Dist. Sidhi of Aryan Coal Benefications Pvt. Ltd.

2x250 MW

Preparation of Feasibility Report

April 2007

Completed

99. Talwandi Sabo Thermal Power Project at Talwandi Sabo, Punja by M/s Talwandi Sabo Power Ltd.

4x500 MW/

3x660 MW/

3x600 MW

Preparation of Feasibility Report and Project Report

May 2007

Completed

100. Rajpura Thermal Power Project at Rajpura, Punjab by M/s Nabha Power Ltd.

2x660 MW

Preparation of Feasibility Report and Project Report

May 2007

Completed

101. Captive Power Plant in Orissa of Visa Steel Limited

200 MW Preparation of Techno-economic Feasibility Report

July 2007 Completed

102. Kakatiya TPP, Stage-II of APGENCO

1x500 + 20% MW

Preparation of Detailed Project Report

Aug. 2007

Completed

103. Rayalaseema TPP, Stage-III of APGENCO

1x500 + 20% MW

Preparation of Detailed Project Report

Aug. 2007

Completed

104. Coal based Power Plant in Karnataka of Jewagri Power Private Limited

1320 MW

(2x660 MW)

Preparation of Detailed Project Report

Aug. 2007

Completed

105. Coal based Power Plant at Ghatikhalllage in Athagarh Tehsil in Cuttack of Aarti Steels Limited

4x125 MW

Preparation of Pre-feasibility Report

Aug. 2007

On going

106. Washery Rejects based TPP at Korba District, Chhattisgarh of Maruti Clean Coal & Power Ltd.

2x135 MW

Preparation of Detailed Project Report

Sept. 2007

Completed

Page 13: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

107. Coal based Captive Power Plant at Ras Al Khimah Cement Plant in UAE of Star Cement Co. L.L.C, UAE

35 MW Preparation of Techno-Economic Feasibility Report

Sept. 2007

Completed

108. Coal based Power Plant in Dist. Shadol,Madhya Pradesh of Prakash Industries Limited

4x350 MW

Preparation of Techno Economic Feasibility Report and Detailed Project Report

Dec. 2007

Completed

109. IPP at Champa-Janjgir, Chhattisgarh of Prakash Industries Limited

4x350 MW

Preparation of Techno Economic Feasibility Report and Detailed Project Report

Feb. 2008

On going

110. CPP at Champa, Chhattisgarh of Prakash Industries Limited

3x350 MW

Preparation of Techno Economic Feasibility Report and Detailed Project Report

Feb. 2008

Completed

111. Merchant Power Plant of SCCL of The Singareni Collieries Company Ltd.

2x250 MW

Preparation of Detailed Project Report

March 2008

Completed

112. Chandrapura Thermal Power Station of M/s Damodar Valley Corpn.

3x140 MW

Preparation of Detailed Feasibility Report

March 2008

On going

113. Durgapur Thermal Power Station of M/s Damodar Valley Corporation

1x210 MW +

1x140MW

Preparation of Detailed Feasibility Report

March 2008

On going

114. Mejia TPS Phase-I & II of M/s Damodar Valley Corporation

Preparation of Feasibility Report, DPR

March 2008

On going

115. Coal fired Power Project in UAE of M/s Emirates Trading Agency L.L.C

2x300 MW

Preparation of Feasibility Report

May 2008

Completed

116. Cogeneration Power Plant at Sakarwadi of M/s Somaiya Organo-Chemicals

10-12 MW

Preparation of Detailed Project Report

July 2008 Completed

Page 14: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

117. Captive Power Plant at Village Padore, Distt. Anuppur, Madhya Pradesh of M/s Prakash Mega Power Limited

2x660 MW

Preparation of Detailed Project Report

Aug. 2008

Draft Report

submitted

118. Power Plant in Karnataka of M/s Atlas Power India Private Limited

2x660 MW

Preparation of Detailed Project Report

Aug. 2008

Draft Report

submitted

1119.

Cogeneration Plant at Mirwah Gorchani Mirpurkhas, Pakistan of M/s Al.abbas Sugar Mills Ltd., Pakistan

1x60 MW Preparation of Detailed Project Report

Aug. 2008

In progress

120. Gidderbaha Thermal Power Project in District Muktsar, Punjab of M/s PFC Consulting Limited

4x660 MW

Preparation of Feasibility Report and Project Report

Sept. 2008

In progress

121. Barsingsar TPS Extension of M/s Neyveli Lignite Corporation Limited

1x250 MW

Preparation of Feasibility Report

Sept. 2008

Draft Report

submitted

122. Orissa Ultra Mega Power Project of M/s Orissa Integrated Power Ltd.

5x800 MW

Preparation of Feasibility Report and Project Report

Dec. 2008

In progress

123. Sanjay Gandhi TPS Units at Birsingpur, Umaria of M/s M.P. Power Generating Co. Ltd.

2x500 MW/

1x500 MW/

2x250 MW

Preparation of Feasibility Report and Detailed Project Report

Dec. 2008

Draft Report submitted

124. Amarkantak TPS Extn. Unit-6 at Chachai, Anuppur of M/s M.P. Power Generating Co. Ltd.

1x250 MW

Preparation of Feasibility Report and Detailed Project Report

Dec. 2008

Draft Report submitted

125. Akaltara Ultra Mega Power Project of M/s

5x800 MW

Preparation of Feasibility Report and Project

Jan. 2009

In progress

Page 15: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity Scope of Work Date of Award

Present Status

Akaltara Power Limited

Report

126. Coal based Power Plant in Uttar Pradesh of M/s MOSER BAER

150-200 MW

Preparation of Feasibility Report

Feb. 2009

In progress

127. Bansagar Super Thermal Power Station of M/s M.P. Power Generating Co. Ltd.

2x800 MW

Preparation of Feasibility Report and Detailed Project Report

March 2009

In progress

128. Power Plant at Village Joratarai, Tahsil & Dist. Rajnandgaon, Chhattisgarh of M/s Akshay Ispat Udyog Pvt. Ltd.

40 MW Preparation of Feasibility Report

March 2009

In progress

129. Captive Power Plant at Jharsuguda, Orissa of M/s Action Ispat & Power (P) Ltd.

2x40 MW Preparation of Detailed Project Report

April 2009

In progress

130. Additional 3rd Unit at DCRTPP, Yamuna Nagar of M/s HPGCL

1x(250-300) MW

Preparation of Detailed Project Report

April 2009

In progress

131. Kothapeta Ultra Mega Power Project in Andhra Pradesh of M/s PFC Consulting Limited

5x800 MW

Preparation of Feasibility Report and Project Report

June 2009

In progress

132. Power Plant at Village Sakharwahi, Dist. Chandrapur, Maharashtra of M/s B.S. Ispat Ltd.

3x150 MW

Preparation of Detailed Project Report

June 2009

In progress

133. Power Plant at Raigarh, Chhattisgarh of M/s Monnet Ispat & Energy Ltd.

1x80 MW Preparation of Detailed Project Report

July 2009 In progress

Page 16: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

FEASIBILITY/DETAILED PROJECT REPORTS(COMBINED CYCLE GAS BASED)

Feasibility/Detailed Project Reports (Combined Cycle Gas based):

Sl. No.

Name of Project Capacity

Scope of Work Date of Award

Present Status

1. 600 MW Gas based Combined Cycle Power Station at Gandhinagar

600 MW Preparation of Feasibility study and Project Report

June 1988

Completed

2. 30 MW Gas based Combined Cycle Power Station at Ankleshwar

30 MW Preparation of a Project Report

June 1988

Completed

Page 17: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity

Scope of Work Date of Award

Present Status

3. 210 MW Gas based Combined Cycle Power Station at Jagdishpur

210 MW Preparation of Detailed Project Report

Feb. 1989

Completed

4. 600 MW Gas based Combined Cycle Power Station in Western U.P.

600 MW Preparation of Detailed Project Report

Feb. 1989

Completed

5. Gas based Combined Cycle Power Station at Ankleshwar

135 MW Preparation of Feasibility Report

Nov. 1989

Completed

6. Utran Gas based Combined Cycle Power Station Extn.

135 MW Preparation of a Project Report

Nov. 1989

Completed

7. Gas based Combined Cycle Power Station at Gandinagar

200 MW Preparation of a Project Report

Jan. 1990

Completed

8. Gas based Combined Cycle Power Station in North Gujarat

300 MW Preparation of Feasibility Report and Detailed Project Report

May 1990

Completed

9. Gas based Combined Cycle Power Station at Pipavav

615 MW Preparation of a Project Report

June 1990

Completed

10. Gas based Combined Cycle Power Station at Shahjahanpur

600 MW Preparation of Feasibility Report and Detailed Project Report

July 1990 Completed

11. Gas based Combined Cycle Power Station at Aonla

600 MW Preparation of Feasibility Report and DPR

July 1990 Completed

12. Gas based Combined Cycle Power Station at Sinor

2x615 MW

Preparation of Feasibility Report and DPR

Aug. 1990

Completed

13. Gas based Combined Cycle Power Station at Jegurupadu near Rajahmundry

400 MW Preparation of Detailed Project Report

Aug. 1990

Completed

14. Delhi Electric Supply Undertaking

2x60 MW

Preparation of techno-economic Feasibility Report for 2x60 MW Gas Turbines

Nov. 1977

Completed

15. Delhi Electric Supply 3x60 Preparation of techno- May Completed

Page 18: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity

Scope of Work Date of Award

Present Status

Undertaking MW economic Feasibility Report for 3x60 MW Gas Turbines

1984

16. Gas based Power Plant at Ramgarh in Rajasthan

3 MW Preparation of Feasibility Report

Sept. 1989

Completed

17. Gas based Captive Power Station for Sodium Metal Pvt. Ltd., Gujarat

3 MW Preparation of Feasibility Report

April 1991

Completed

18. Gas based Combined Cycle Power Station at Jegurupadu

400 MW Updating of Project Report for setting up the Project by GVK Industries

March 1992

Completed

19. Gas based Combined Cycle Power Station at Jegurupadu

200 MW Project Report for setting up the Project by GVK Industries Ltd.

Oct. 1992

Completed

20. Gas based Combined Cycle Power Station at Pipavav

615 MW Preparation of Project Report

April 1993

Completed

21. Naphtha based Combined Cycle Power Station at Khandwa of Subhash Projects & Marketing Ltd.

120-150 MW

Preparation of Detailed Project Report

April 1995

Completed

22. Gas based Combined Cycle Power Station Extension at Vijjeswaram

160 MW Preparation of Detailed Project Report

Oct. 1995

Completed

23. Naphtha based Combined Cycle Power Station at Jhabua of Kedia Power Ltd.

330 MW Preparation of Detailed Project Report

Jan. 1995

Completed

24. Gas based Combined Cycle Power Station at Amguri of India Power Partners Pvt. Ltd.

286 MW Preparation of Detailed Project Report

Nov. 1994

Completed

25. Naphtha based Combined Cycle Power Station at Mandya of India Power Partners Pvt. Ltd.

130 MW Preparation of Detailed Project Report

Aug. 1995

Completed

Page 19: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity

Scope of Work Date of Award

Present Status

26. Naphtha based Combined cycle Power Plant at Bahadurgarh of SUL Power Partners

2x25 MW

Preparation of Detailed Project Report

March 1996

Completed

27. Naphtha based Combined Cycle Power Plant at Kuttapalli of Kedia Power Ltd.

1000 MW

Preparation of Pre-Feasibility Report

Feb. 1996

Completed

28. Utran Gas based Combined Cycle Power Station Extension

300 MW Preparation of Detailed Project Report

May 1998

Completed

29. Power Project in Gujarat for KRIBHCO

200 MW Preparation of Pre-Feasibility Report

May 1998

Completed

30. Gas based Combined Cycle Power Project at Hazira for Gujarat State Petroleum Corporation

160 MW Preparation of Detailed Project Report

May 1998

Completed

31. Gas based Combined Cycle Power Project at Pipavav for KRIBHCO

615 MW Preparation of Pre-Feasibility study Report

Sept. 1998

Completed

32. Gas based Combined Cycle Power Project at Dhuvaran of Gujarat State Electricity Corporation Ltd.

100 MW Preparation of Detailed Project Report

Nov. 1999

Completed

33. Combined Cycle Power Project at Ago-Oja, IIorin, Nigeria of BC Projects Ltd., UK

105 MW Preparation of Detailed Project Report

April 2001

Completed

34. LNG/Natural Gas based Combined Cycle Power Project Expansion at Hazira of Guj.State Energy Gen. Ltd.

156 MW Preparation of Project Report

March 2001

Completed

35. Gas based Power Plants at Hazira, Vaghodia & Khera for Gas Authority

10-15 MW

Preparation of Detailed Feasibility Reports

July 2002 Completed

Page 20: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity

Scope of Work Date of Award

Present Status

of India Ltd.

36. Natural Gas/ LNG based Combined Cycle Power Project at Utran of Gujarat State Electricity Corporation Ltd.

370 MW Preparation of Detailed Project Report & Comprehensive Report for Railway siding and approach Road

Oct. 2002

Completed

37. Natural Gas/ LNG based Combined Cycle Power Project at Utran of Gujarat State Electricity Corporation Ltd.

107 MW Preparation of Feasibility Report & Detailed Project Report

June 2003

Completed

38. Gas based Power Station (s) at Katargam Water Works, Head Water Works & Sarthana Water Works of Surat Municipal Corporation

6 MW Preparation of Feasibility Report

July 2003 Completed

39. Natural Gas based CPP at DLF City, Gurgaon of DLF Universal Ltd.

60 MW Preparation of Feasibility Report

Nov. 2003

Completed

40. Dhuvaran CCPP Stage-II for Gujarat State Electricity Corporation Ltd.

395 MW Preparation of Pre-feasibility Report, Detailed Project Report & EIA Studies

May 2005/ Oct. 2007

Completed

41. Gas based Combined Cycle Power Plant at Panipat of Weizmann Limited

600 MW Preparation of Feasibility Report

Oct. 2005

Completed

42. Gas based CCPP near Kakinada, A.P. of Suryachakra Power Corpn. Ltd.

1000 MW

Preparation of Project Report

April 2006

Completed

43. Gas based Simple Cycle Power Plant at Sharourah in Saudi Arabia – Saudi Electricity Company

51 MW Preparation of Detailed Project Report

April 2007

Completed

44. Gas based Simple Cycle Power Plant at Tihama in Saudi Arabia – Saudi

131 MW Preparation of Detailed Project Report

April 2007

Completed

Page 21: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Sl. No.

Name of Project Capacity

Scope of Work Date of Award

Present Status

Electricity Company

45. Gas based Simple Cycle Power Plant at Jazan in Saudi Arabia – Saudi Electricity Company

263.084 MW

Preparation of Detailed Project Report

April 2007

Completed

46. Gas based Combined Cycle Power Plant at Rithala, New Delhi – North Delhi Power Ltd.

108 MW Preparation of Feasibility Report

Sept. 2007

Completed

47. Basin Bridge Gas Turbine Power Station of Tamil Nadu Electricity Board

4x30 MW

Preparation of Detailed Project Report

April 2008

Completed

FEASIBILITY/DETAILED PROJECT REPORTS (DIESEL / HYDEL)

Sl.No.

Name of Project Capacity Scope of Work Date of Award

Present Status

1. Diesel based Power Station in Andhra Pradesh

100 MW Preparation of detailed project report

May 1989

Completed

2. Fertiliser Corporation of India Ltd.

Preparation of pre-feasibility report for captive power plants at Gorakhpur (60 MW), Ramagundam (60 MW) and Talcher (30 MW)

March 1988

Completed

3. Installation of 13 300 kW Preparation of detailed Decembe Completed

Page 22: FEASIBILITY/DETAILED PROJECT REPORTS · Raigarh Thermal Power Station for Jindal Strips Ltd. 2x500 MW Preparation of Pre- Feasibility Report March 1994 Completed 29. Captive Power

Mini/Micro Hydel Power Stations on Miyagam and Vadodara Branch Canal of Narmada Main Canal

to 750 Kw

project reports for 13 schemes of sizes varying from 300 kW to 750 Kw

r 1988

4. Diesel based Captive Power Station at Talanagari, U.P.

30 MW Preparation of feasibility report and market survey

March 1992

Completed

5. Diesel Power Plant at Ghaziabad of Modi Rubber Ltd.

100 MW Preparation of detailed project report

June 1995

Completed

6. Diesel Power Plant at Mandya of India Power Partners Pvt. Ltd.

130 MW Preparation of detailed project report

April 1995

Completed

7. Diesel Power Plant at Chandausi of India Power Partners Pvt. Ltd.

130 MW Preparation of detailed project report

Completed

8. Diesel Power Plant at Gwalior of Tomen Corporation

100 MW Preparation of detailed project report

November 1994

Completed