feasibilit y study - webinfo.uscsd.k12.pa.us
TRANSCRIPT
©
FEASIBILITY STUDY
Upper St. Clair School District�
January 19, 2006
ATHLETIC FACILITIES
Presentation of August 17, 2009
UPPER ST. CLAIR SCHOOL DISTRICT FEASIBILITY STUDY
Upper St. Clair Upper St. Clair Upper St. Clair Upper St. Clair High SchoolHigh SchoolHigh SchoolHigh School
UPPER ST. CLAIR SCHOOL DISTRICT FEASIBILITY STUDY
Athletic ComplexAthletic ComplexAthletic ComplexAthletic Complex
• Site drainageSite drainageSite drainageSite drainage problemsproblemsproblemsproblems
• Undersized and dated Undersized and dated Undersized and dated Undersized and dated home side concession areahome side concession areahome side concession areahome side concession area
• Running track conditions, beyond useful lifeRunning track conditions, beyond useful lifeRunning track conditions, beyond useful lifeRunning track conditions, beyond useful life
• Out of code compliance Out of code compliance Out of code compliance Out of code compliance forforforfor accessibility in some areas accessibility in some areas accessibility in some areas accessibility in some areas
• InadeInadeInadeInadequate water service on home sidequate water service on home sidequate water service on home sidequate water service on home side
• Electrical deficiencies on home side including emergencyElectrical deficiencies on home side including emergencyElectrical deficiencies on home side including emergencyElectrical deficiencies on home side including emergency generator, telephone service, and fire alarmgenerator, telephone service, and fire alarmgenerator, telephone service, and fire alarmgenerator, telephone service, and fire alarm
Athletic Complex - View of Home Side Bleachers
Athletic Complex - View of Home Side Bleachers
Athletic Complex – Home Side Concession Area
Athletic Complex – Detail of Track Condition
Athletic ComplexPatch Of Damaged Deck Under Home Side Bleachers
UPPER ST. CLAIR SCHOOL DISTRICT FEASIBILITY STUDY
Boyce Middle SchoolBoyce Middle SchoolBoyce Middle SchoolBoyce Middle School
B O Y C E M I D D L E S C H O O L
Boyce Middle School – Aerial Site View
Boyce Middle School – Turf Field Plan
Boyce Middle School – View To Ball Fields
Boyce Middle School – View To Ball Fields
Boyce Middle School – View To Ball Fields
Boyce Middle School – View To Ball Fields
UPPER ST. CLAIR SCHOOL DISTRICT FEASIBILITY STUDY
Fort CouchFort CouchFort CouchFort Couch Middle SchoolMiddle SchoolMiddle SchoolMiddle School
F O R T C O U C H M I D D L E S C H O O L
Fort Couch Middle School – Aerial Site View
Fort Couch Middle School – View To Ball Fields
Fort Couch Middle School – View To Ball Fields
UPPER ST. CLAIR SCHOOL DISTRICT FEASIBILITY STUDY
Section Section Section Section VII :VII :VII :VII : OPINION OF COSTSOPINION OF COSTSOPINION OF COSTSOPINION OF COSTS Note:Note:Note:Note: Opinion of Costs in this Feasibility Study are based on Opinion of Costs in this Feasibility Study are based on Opinion of Costs in this Feasibility Study are based on Opinion of Costs in this Feasibility Study are based on current construction costs for renovations, additions and new current construction costs for renovations, additions and new current construction costs for renovations, additions and new current construction costs for renovations, additions and new construction. These figures do not include costs for acquisition of construction. These figures do not include costs for acquisition of construction. These figures do not include costs for acquisition of construction. These figures do not include costs for acquisition of additional property, soiladditional property, soiladditional property, soiladditional property, soil----related items such as mine stabrelated items such as mine stabrelated items such as mine stabrelated items such as mine stabiiiilization lization lization lization or special foundations, or financing cost.or special foundations, or financing cost.or special foundations, or financing cost.or special foundations, or financing cost.
High School Athletic Complex: $ 3,100,000 $ 3,600,000Construct New Home-side Bleachers,
Press Box, Concessions Facility, Toilet Facilities,
Storage Area, New Running Track
Boyce Athletic Fields: $ 1,115,000 $ 1,300,000New Artificial Turf Football/Soccer Field,
Three-lane Walking/Running Track, Lighting.
Ft. Couch Athletic Fields: $ 225,000 $ 260,000New Sod/Seeding, Drainage Improvements,
Fencing, Dugouts, and Scoreboard.
Description Construction Cost Total Project Cost
©