Break Room PG PG L'zade SERVER Comms 600 x 800 Spin 15 Bike Stations Functional Free Weights Studio Vend store Flex Gym Floor Night Lockers Breakfast Bar Managers Podium Kiosk Vending Yanga WF 20 10 1 20 2 4 30 40 15 40 FD30S FIRE EXIT FIRE EXIT 1050 min clear 1050 min clear 1450 min clear 2 1 3 Fire Exit Fire Exit CH 1 CH 2 CH 1 CH 2 Exsitinhg mains incoming and meter room, to be retained and modified to suit. level platform over Existing Ramp PT Men's Changing 28 Locker Bays Women's Changing 22 Locker Bays Social Wall Hub Breakfast bar Store Rack Plant Room 1500 x 1500mm Wheelchair turning space Rubber Alarm pull cord Floor laid to falls in direction of gulley 1:40 min Alarm pull cord Acc. SH / WC 57° 12.0m (2/3 of 18m) - to 45 degree angle change of direction 21.0m - Total 42° 53° FIRE EXIT To close on fire activation no fire exit Protected escape corridor FD30 FD30 FD30 FD30 FD30 FD60 12.0m (2/3 of 18m) - to 45 degree angle change of direction 12.0m (2/3 of 18m) - to 45 degree angle change of direction 1050 min clear 36.0m - Total 132° 20 Acoustic lining to wall as per acoustic report. Acoustic lining to wall as per acoustic report. Acoustic lining to wall as per acoustic report. Acoustic lining to wall as per acoustic report. Acoustic lining to wall as per acoustic report. Acoustic lining to wall as per acoustic report. 9610 8000 12000 Meter room Door to be retained for access to yard. Plinth Existing Ramp Kee Klamp handrail to ramp and 1100mm high guard rail from platform FFL additional piece Safety Line Safety Line 14m to change of direction 43m total, avoiding equipment 34m total 146° 179° 14m to change of direction 27m total, avoiding equipment 15m to change of direction 42m total, avoiding equipment 8.5m to protection Accessible facility located with the protected area perimeter walls to be protected to 60min FR Fire Evacuation Key Occupany level within area 0 Protected areas: walls, floors, ceilings and doors to achieve 30minute fire resistant construction. Protected areas: walls, floors, ceilings and doors to achieve 60 minute fire resistant construction. Fire Alarm Fire Alarm designed and installed to BS 5839. Smoke & heat detection / emergency lighting by specialist. Please refer to M&E Engineer's drawings / specifications. Escape Lighting Emergency escape lighted designed and installed in accordance with BS 5266: Part 1. Please refer to M&E Engineer's drawings for final layout and specification. Escape Route Widths In line with Sections 3.21 & 3.22 of 'Approved Document Part B, Volume 2 - buildings other than dwellinghouses' - the adjacent calculations provide justification for the clear opening widths for escape from each floor level/ room in accordance with Table 4 & Appendix C. Shared Escape Route Existing wall to achieve min 60 minute fire rating (suitability of wall to be confirmed on site by Pure Gym Main Contractor 1050 min Minimum Clear Widths Fire Escape Route 30 Exit No. Ground Floor Exit 1 Clear Opening Width = 1450mm (largest opening to be discounted) Exit 2 Clear Opening Width = 1050mm (allows 220 people to escape) Exit 2 Clear Opening Width = 1050mm (allows 220 people to escape) Total Aggregate Width for Floor (Less Largest Opening Width of 1450mm from Exit 1) = 1050mm Ground Floor Total Estimated Occupancy Capacity =178 Persons Taking into account the discounting of Exit Route 1 from the appraisal in accordance with Section 3.21 of 'Approved Document Part B, Volume 2, Exit Route 2 & 3 have a combined capacity sufficient to accommodate 440 people in case of an evacuation taking place. This is therefore thought to comply with the requirements set out in Approved Document Part B. New wall to achieve min of 60min fire rating Pure Gym Ltd Town Centre House The Merrion Centre Leeds LS2 8LY e: [email protected]t: 0113 285 8787 w: www.puregym.com PROJECT TITLE DRAWING TITLE DATE SCALE DRAWN / CHECKED JOB No DRAWING No Rev Rev Date Description Drawn/ Checked DRAWING PURPOSE CONSTRUCTION 172-176 Upper Richmond Rd W East Sheen London SW14 8AW Proposed Fire Evacuation Plan Ground Floor 24.01.19 IR/PG 1:100 @ A1 IA-LBF-010 G-004-FEP D Ground Floor Plan 1:100 A 01.02.19 Drawing updated to reflect changes to General Arrangement Rev B IR/PG B 28.03.19 Updated in line with new GA. IR/PG C 05.01.19 Wall removed between FW and Functional. AT/PG D 29.07.19 Layout revised in line with GA amendments and FIT. Equipment plan added. Fire exits removed from strategy, internal fire corridor added. EK/PG