fameca transmission earthing devices
DESCRIPTION
FAMECA Transmission Earthing Devices SMAPE is a solution introduced to the world from FAMECA and it's patented with FAMECA name. 100% portable earthing device with interlocking system without any chance of mistake. for more details: [email protected]TRANSCRIPT
![Page 1: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/1.jpg)
■ Transmission Earthing Devices
![Page 2: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/2.jpg)
THE FIVE GOLDEN RULES
■ STAGE 1
Switch off the circuit
![Page 3: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/3.jpg)
THE FIVE GOLDEN RULES
■ STAGE 2
Lockout & Tagout
![Page 4: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/4.jpg)
THE FIVE GOLDEN RULES
■ STAGE 3
Checking the absence of nominal voltage
![Page 5: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/5.jpg)
THE FIVE GOLDEN RULES
■ STAGE 4
Earthing
![Page 6: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/6.jpg)
THE FIVE GOLDEN RULES
■ STAGE 5
Delimit & Protect the working area
![Page 7: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/7.jpg)
Transmission Earthing Devices
WHY ?• Secure the operators on the network • Secure the network equipments
WHEN ?
• Before working on a network which must be switching off • Immediately after performing the nominal voltage checking
HOW?
• Compliance with 5 golden rules • Creating a connection between the conductor and earth (s) conductors (s) phase in
respecting the order of installation / removal • Using earthing equipments that conforms to all relevant standards:
IEC / EN 61230: Temporary Mobile Grounding devices IEC / EN 61138: Lead copper cable for temporary mobile grounding devices EN 50508: Insulating sticks IEC / EN 60855-1 & CEI/EN61235: Insulating tube for live line working
• By following the minimum approach distance during installation of the line clamps
![Page 8: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/8.jpg)
Composition of the earthing device
3 x
![Page 9: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/9.jpg)
Composition of the earthing device
3 x
![Page 10: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/10.jpg)
How to determinate the adapted earthing device ?
1. Voltage range ?
2. Environnement: Substation ou Overheadline ?
3. Type of earth conductors?
4. Shape :
5. Dimension Mini Maxi (mm): Diameter, thikness, width
6. Type of line conductors ?
7. Shape:
8. Dimension Mini Maxi (mm): Diameter, thikness, width
![Page 11: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/11.jpg)
Lenght of the earthing copper cable
Lenght = distance max between the line conductor and the earth conductor + 2m maxi
![Page 12: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/12.jpg)
Short circuiting intensity
Short circuiting intensity ?
How long time ?
Max temperature increase ?
![Page 13: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/13.jpg)
Short circuiting intensity
CABLE CUIVRE / COPPER CABLE
Section câbleCable section(mm²)
Echauffement du câble à la fin du ccWarm up cable at the end of short-circuit
Iccmax pourMax short-circuit with
Poids/mWeight/m
(kg)
50 700 °C 13,2 kA / 1 s 0,5
![Page 14: FAMECA Transmission Earthing Devices](https://reader036.vdocuments.mx/reader036/viewer/2022081420/558e70d81a28ab54638b4693/html5/thumbnails/14.jpg)
Short circuiting intensity
CABLE CUIVRE / COPPER CABLE
CABLE CUIVRE / COPPER CABLE
Section câbleCable section(mm²)
Echauffement du câble à la fin du ccWarm up cable at the end of short-circuit
Iccmax pourMax short-circuit with
Poids/mWeight/m
(kg)
120 700 °C 31,7 kA / 1 s 1,3