fall 2013 levee maintenance deficiency summary report · pdf file3.51 design & system ......

12
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch Flood Control Project Maintenance Levee Inspections Fall 2013 Levee Maintenance Deficiency Summary Report Overall LMA & Unit Ratings, including USACE Erosion Survey Sacramento River Basin Overall LMA Rating A Total LMA Miles 3.51 Design & System Obsolescence M Miles M + 4U Miles Threshold % U Miles M Miles U Miles Enforcement Sacramento Maintenance Yard Sacramento Bypass ST0008 Rated Item M Miles U Miles Maintenance Deficiancy Earthen Levee 0.02 Encroachments Supplemental 0.11 DWR UCIP Field Study 0.00 0.00% 0.00 0.00 0.13 0.00 LMA Totals: 0.00 0.00 Overall Unit Rating A Total Unit Miles 1.73 Design & System Obsolescence Unit No. 01 Sacramento Bypass or North Levee RB ST0008 Rated Item M Miles M + 4U Miles Threshold % U Miles M Miles U Miles Enforcement M Miles U Miles Maintenance Deficiancy Earthen Levee 0.01 Encroachments Supplemental 0.09 DWR UCIP Field Study 0.00 0.00% 0.00 0.00 0.10 0.00 Unit Totals: 0.00 0.00 Overall Unit Rating A Total Unit Miles 1.78 Design & System Obsolescence Unit No. 02 Sacramento Bypass or South Levee LB ST0008 Rated Item M Miles M + 4U Miles Threshold % U Miles M Miles U Miles Enforcement M Miles U Miles Maintenance Deficiancy Earthen Levee 0.01 Encroachments Supplemental 0.02 DWR UCIP Field Study 0.00 0.00% 0.00 0.00 0.03 0.00 Unit Totals: 0.00 0.00 Tuesday, December 10, 2013 08:42 Page 1 of 1

Upload: vonga

Post on 23-Feb-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

Fall 2013 Levee Maintenance Deficiency Summary ReportOverall LMA & Unit Ratings, including USACE Erosion Survey

Sacramento River Basin

Overall LMARating

A

Total LMAMiles

3.51Design & System

Obsolescence

M Miles M + 4U Miles Threshold %U Miles M Miles U Miles

Enforcement

Sacramento Maintenance Yard Sacramento Bypass

ST0008

Rated ItemM Miles U Miles

Maintenance Deficiancy

Earthen Levee

0.02Encroachments Supplemental

0.11DWR UCIP Field Study

0.00 0.00%0.00 0.00 0.13 0.00LMA Totals: 0.00 0.00

Overall UnitRating

A

Total UnitMiles

1.73Design & System

Obsolescence

Unit No. 01 Sacramento Bypass or North Levee RB

ST0008

Rated ItemM Miles M + 4U Miles Threshold %U Miles M Miles U Miles

Enforcement

M Miles U Miles

Maintenance Deficiancy

Earthen Levee

0.01Encroachments Supplemental

0.09DWR UCIP Field Study

0.00 0.00%0.00 0.00 0.10 0.00Unit Totals: 0.00 0.00

Overall UnitRating

A

Total UnitMiles

1.78Design & System

Obsolescence

Unit No. 02 Sacramento Bypass or South Levee LB

ST0008

Rated ItemM Miles M + 4U Miles Threshold %U Miles M Miles U Miles

Enforcement

M Miles U Miles

Maintenance Deficiancy

Earthen Levee

0.01Encroachments Supplemental

0.02DWR UCIP Field Study

0.00 0.00%0.00 0.00 0.03 0.00Unit Totals: 0.00 0.00

Tuesday, December 10, 2013 08:42 Page 1 of 1

Page 2: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

LMA District Cover SheetFall 2013 Levee Inspection Results

Sacramento Maintenance Yard Sacramento Bypass

Non-receipt of Summer or Winter Inspection Reports may effect overall annual rating.

Overall LMA Rating (Fall Only)

Comments

Overall maintenance ratings are not determined for the spring inspection results. Individual maintenance deficiencies are rated using the same criteria in the spring and in the fall.

SPRING INSPECTIONS:

FALL INSPECTIONS: The overall maintenance rating shown above is based on operation and maintenance deficiencies identified within the attached unit inspection reports. This rating is not intended to be an indiction of risk.

*

*

**

A

Summer Winter(September - November)

Spring Fall(June - August) (December - February)(March - May)

** **

Tuesday, December 10, 2013 08:42

Page 3: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Unit Cover SheetFall 2013 Levee Inspection Results

Sacramento Maintenance Yard Sacramento Bypass

Waterway

Unit No. 01 Sacramento Bypass or North Levee

Bank

Right

Unit Miles

1.73

Summer Winter

Date of Inspection

(September - November)

10/15/2013 - 10/15/2013

Unit Maintenance Rating (Fall Only)

SpringFall(June - August) (December - February)(March - May)

A

-

DWR Inspector John WilliamsonJohn Williamson

Sacramento Maintenance YardSacramento Maintenance YardCasey LundAccompanied By Casey Lund

If the LMA is unable to submit information on this webpage, please contact DWR for assistance.

The Local Maintaining Agency (LMA) is responsible for summer and winter inspections. The LMA is required to submit a report regarding summer and winter inspections to the California Department of Water Resources (DWR).

DWR must be informed on the: a) completion of the inspection b) any changes other than the results of normal maintenance c) corrections to deficiencies noted in this report

If additional items are noted, further documentation of those items must also be submitted.

The LMA should submit this information to DWR using the LMA web application tool available at:

http://cdec.water.ca.gov/lma.html

The LMA should submit the information and any associated documentation by September 30 for summer inspections and March 31 for winter inspections.

Summer & Winter Inspections

Tuesday, December 10, 2013 08:42

Page 4: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 01 Sacramento Bypass or North Levee

Bank

Right

Unit Miles

1.73

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

Issue No.

StartStart EndCategory Item

Loc

atio

n*

Ratin

g ** + Action/Comment

Levee Mile GPS Latitude/Longitude

End Photo

LMR

No

.

Earthen Levee

A °°° °

LS1 Operations & Maintenance Manuals

3

Ma

DWR ID: DWR_ST0008_01_s _ 2013_3

Earthen Levee

A °°° °

LS2 Emergency Supplies & Equipment

4

Ma

DWR ID: DWR_ST0008_01_s _ 2013_4

Earthen Levee

A °°° °

LS3 Flood Preparedness & Training

5

Ma

DWR ID: DWR_ST0008_01_s _ 2013_5

0.04 1.73 Earthen Levee

A V1 : Control annual grass and weeds on the levee slopes and easements.

38.607017 °38.599432-121.560548 -121.590072

°° °

LS4

YVegetation 14

MaDWR ID: DWR_ST0008_01_f _ 2013_14

0.44 1.73 Earthen Levee

A V1 : Control annual grass and weeds on the levee slopes and easements.

38.604832 °38.599432-121.567445 -121.590073

°° °

WS5

YVegetation 15

MaDWR ID: DWR_ST0008_01_f _ 2013_15

0.46 0.46 Earthen Levee

A/W S1 : Repair slope instability. 38.604712 °38.604712-121.567738 -121.567738

°° °

LS6

YSlope Stability 12

MaDWR ID: DWR_ST0008_01_s _ 2012_12

1.14 1.14 Supplemental M Inspector Comments: FS_ID:6414EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012

38.602180 °38.602180-121.579130 -121.579130

°° °

LS7 DWR UCIP Field Study

1

En

DWR ID: DWR_ST0008_01_f _ 2013_1

1.14 1.14 Supplemental M Inspector Comments: FS_ID:6413EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012

38.602180 °38.602180-121.579130 -121.579130

°° °

LS8

YDWR UCIP Field Study

2

En

DWR ID: DWR_ST0008_01_f _ 2013_2

Page 1 of 6Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type

Page 5: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 01 Sacramento Bypass or North Levee

Bank

Right

Unit Miles

1.73

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

Issue No.

StartStart EndCategory Item

Loc

atio

n*

Ratin

g ** + Action/Comment

Levee Mile GPS Latitude/Longitude

End Photo

LMR

No

.

1.14 1.14 Supplemental M Inspector Comments: FS_ID:6460EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: horizontal air vent on waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012

38.602180 °38.602180-121.579130 -121.579130

°° °

LS9 DWR UCIP Field Study

6

En

DWR ID: DWR_ST0008_01_f _ 2013_6

1.14 1.14 Supplemental M Inspector Comments: FS_ID:12703EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: After more investigation depressions are from water run off. erosion repair neededFIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 5/7/2013 9:09:11 AM

38.602180 °38.602180-121.579130 -121.579130

°° °

LS10 DWR UCIP Field Study

7

En

DWR ID: DWR_ST0008_01_f _ 2013_7

1.14 1.14 Supplemental M Inspector Comments: FS_ID:6384EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012

38.602130 °38.602130-121.579130 -121.579130

°° °

LS11 DWR UCIP Field Study

8

En

DWR ID: DWR_ST0008_01_f _ 2013_8

Page 2 of 6Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type

Page 6: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 01 Sacramento Bypass or North Levee

Bank

Right

Unit Miles

1.73

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

Issue No.

StartStart EndCategory Item

Loc

atio

n*

Ratin

g ** + Action/Comment

Levee Mile GPS Latitude/Longitude

End Photo

LMR

No

.

1.14 1.14 Supplemental M Inspector Comments: FS_ID:6382EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012

38.602130 °38.602130-121.579130 -121.579130

°° °

LS12 DWR UCIP Field Study

9

En

DWR ID: DWR_ST0008_01_f _ 2013_9

1.14 1.14 Supplemental M Inspector Comments: FS_ID:6383EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope.FIELD_STRUCT_DESC: 2 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012

38.602128 °38.602128-121.579146 -121.579146

°° °

LS13 DWR UCIP Field Study

10

En

DWR ID: DWR_ST0008_01_f _ 2013_10

1.14 1.14 Supplemental M Inspector Comments: FS_ID:6445EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Horizontal Air vent on waterside slope. Green vegetation and depressions also found on waterside slope.FIELD_STRUCT_DESC: 2 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012

38.602128 °38.602128-121.579150 -121.579150

°° °

LS14 DWR UCIP Field Study

11

En

DWR ID: DWR_ST0008_01_f _ 2013_11

Page 3 of 6Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type

Page 7: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 01 Sacramento Bypass or North Levee

Bank

Right

Unit Miles

1.73

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

Issue No.

StartStart EndCategory Item

Loc

atio

n*

Ratin

g ** + Action/Comment

Levee Mile GPS Latitude/Longitude

End Photo

LMR

No

.

1.14 1.14 Supplemental M Inspector Comments: FS_ID:12705EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Horizontal Air vent on waterside slope. Green vegetation and depressions also found on waterside slope.FIELD_STRUCT_DESC: 2 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 5/7/2013 9:12:36 AM

38.602128 °38.602128-121.579150 -121.579150

°° °

CR15 DWR UCIP Field Study

13

En

DWR ID: DWR_ST0008_01_f _ 2013_13

1.14 1.14 Earthen Levee

M DE : Debris 38.601947 °38.601947-121.579838 -121.579838

°° °

CR16

YEncroachments 16

EnDWR ID: DWR_ST0008_01_f _ 2013_16

Page 4 of 6Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type

Page 8: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 01 Sacramento Bypass or North Levee

Bank

Right

Unit Miles

1.73

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

The levee has been burned and the new vegetation is starting to grow. Fall 2013

Start Levee Mile 0.04End Levee Mile 1.73

Levee Mile Report Line 4

Category Earthen Levee

Item Vegetation

Location Land Side

johngw_f_20131021_138.JPG

The levee has been burned and the new vegetation has begun to grow. Fall 2013

Start Levee Mile 0.44End Levee Mile 1.73

Levee Mile Report Line 5

Category Earthen Levee

Item Vegetation

Location Water Side

johngw_f_20131021_139.JPG

The area has been resloped and complies with standards. Fall 2013

Start Levee Mile 0.46End Levee Mile 0.46

Levee Mile Report Line 6

Category Earthen Levee

Item Slope Stability

Location Land Side

johngw_f_20131021_140.JPG

Page 5 of 6Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type

Page 9: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 01 Sacramento Bypass or North Levee

Bank

Right

Unit Miles

1.73

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

Landside view: pumping plant overview

Start Levee Mile 1.14End Levee Mile 1.14

Levee Mile Report Line 8

Category Supplemental

Item DWR UCIP Field Study

Location Crown

UCIP_2819.jpg

Prunings and furniture are left on the levee crown. Fall 2013

Start Levee Mile 1.14End Levee Mile 1.14

Levee Mile Report Line 16

Category Earthen Levee

Item Encroachments

Location Crown

johngw_f_20131021_141.JPG

Page 6 of 6Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type

Page 10: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Unit Cover SheetFall 2013 Levee Inspection Results

Sacramento Maintenance Yard Sacramento Bypass

Waterway

Unit No. 02 Sacramento Bypass or South Levee

Bank

Left

Unit Miles

1.78

Summer Winter

Date of Inspection

(September - November)

10/15/2013 - 10/15/2013

Unit Maintenance Rating (Fall Only)

SpringFall(June - August) (December - February)(March - May)

A

-

DWR Inspector John WilliamsonJohn Williamson

Sacramento Maintenance YardSacramento Maintenance YardCasey LundAccompanied By Casey Lund

If the LMA is unable to submit information on this webpage, please contact DWR for assistance.

The Local Maintaining Agency (LMA) is responsible for summer and winter inspections. The LMA is required to submit a report regarding summer and winter inspections to the California Department of Water Resources (DWR).

DWR must be informed on the: a) completion of the inspection b) any changes other than the results of normal maintenance c) corrections to deficiencies noted in this report

If additional items are noted, further documentation of those items must also be submitted.

The LMA should submit this information to DWR using the LMA web application tool available at:

http://cdec.water.ca.gov/lma.html

The LMA should submit the information and any associated documentation by September 30 for summer inspections and March 31 for winter inspections.

Summer & Winter Inspections

Tuesday, December 10, 2013 08:42

Page 11: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 02 Sacramento Bypass or South Levee

Bank

Left

Unit Miles

1.78

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

Issue No.

StartStart EndCategory Item

Loc

atio

n*

Ratin

g ** + Action/Comment

Levee Mile GPS Latitude/Longitude

End Photo

LMR

No

.

0.01 1.76 Earthen Levee

A V1 : Control annual grass and weeds on the levee slopes and easements.

38.602773 °38.594775-121.555775 -121.586542

°° °

LS1

YVegetation 3

MaDWR ID: DWR_ST0008_02_f _ 2013_3

1.19 1.19 Supplemental M Inspector Comments: FS_ID:6408EP_NO: 11826Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Vertical GI pipe trash rack in inlet structure; trash rack is falling apart and found in the water. Big pumping plant with 5 pipes.FIELD_STRUCT_DESC: A 36-inch drainage pipe through the levee, 2.0 feet below the crown. A steel pipe pump structure and pump house on the landward side with a vertical pump. A siphon breaker located on the apex of the pipe near the LS of the levee. A flapgate installed on the discharge end of the pipe. (App. No. 11826 - R.D. 537) 10/76.FS Date: 10/4/2012

38.597544 °38.597544-121.576620 -121.576620

°° °

LS2

YDWR UCIP Field Study

1

En

DWR ID: DWR_ST0008_02_f _ 0_1

1.19 1.19 Supplemental M Inspector Comments: FS_ID:6441EP_NO: 11826Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Vertical GI pipe trash rack in inlet structure; trash rack has fallen apart and found in the water. Big pumping plant with 5 pipes.FIELD_STRUCT_DESC: A 36-inch drainage pipe through the levee, 2.0 feet below the crown. A steel pipe pump structure and pump house on the landward side with a vertical pump. A siphon breaker located on the apex of the pipe near the LS of the levee. A flapgate installed on the discharge end of the pipe. (App. No. 11826 - R.D. 537) 10/76.FS Date: 10/4/2012

38.597544 °38.597544-121.576621 -121.576621

°° °

LS3 DWR UCIP Field Study

2

En

DWR ID: DWR_ST0008_02_f _ 0_2

1.76 1.76 Earthen Levee

M PR : Prunings 38.594777 °38.594777-121.586525 -121.586525

°° °

LS4

YEncroachments 5

EnDWR ID: DWR_ST0008_02_f _ 2013_5

Page 1 of 2Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type

Page 12: Fall 2013 Levee Maintenance Deficiency Summary Report · PDF file3.51 Design & System ... EP_NO: 13616 Repair Type: Non-Urgent Crossing Status: Found ... Field Study 6 En DWR ID: DWR_ST0008_01_f

State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch

Flood Control Project MaintenanceLevee Inspections

ST0008

Levee Inspection Report By Mile - Fall 2013

Waterway

Unit No. 02 Sacramento Bypass or South Levee

Bank

Left

Unit Miles

1.78

InspectionStart/End

10/15/201310/15/2013

Sacramento Maintenance Yard Sacramento BypassInspector

JohnWilliamson

The levee has no unwanted vegetation. Fall 2013

Start Levee Mile 0.01End Levee Mile 1.76

Levee Mile Report Line 1

Category Earthen Levee

Item Vegetation

Location Land Side

johngw_f_20131021_142.JPG

Landside view: overview of the pumping plant

Start Levee Mile 1.19End Levee Mile 1.19

Levee Mile Report Line 2

Category Supplemental

Item DWR UCIP Field Study

Location Land Side

UCIP_2809.jpg

The never ending pruning pile at the end of the unit. Fall 2013

Start Levee Mile 1.76End Levee Mile 1.76

Levee Mile Report Line 4

Category Earthen Levee

Item Encroachments

Location Land Side

johngw_f_20131021_144.JPG

Page 2 of 2Tuesday, December 10, 2013 08:42 FINAL DATA

* Location

: Land Side: Water Side: Crown

LSWSCR

: Acceptable: Minimally Acceptable: Unacceptable

AMU

** Rating

NC

A/W

MaObEn

: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain

: Maintenance Deficiancy: Design & System Obsolescence: Enforcement

+ Issue Type