fairbanks areawide industrial reclamation project area history janice wiegers adec

Download Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC

If you can't read please download the document

Upload: keita

Post on 06-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC. Area History. 1989-1990 DOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs) - PowerPoint PPT Presentation

TRANSCRIPT

  • Fairbanks Areawide Industrial Reclamation Project

    AREA HISTORY

    Janice WiegersADEC

  • Area History1989-1990 DOT plans Minnie Street ConnectorS&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs)

    1993-1996 MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River 2002 2004ADEC begins FAIR project (larger than MSLUG)2002 Well point investigation conducted and coordinated sampling begins2003 Risk Management Workplan completed by EPA

  • Area History1989-1990 DOT plans Minnie Street ConnectorS&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs)

    1993-1996 MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River 2002 2004ADEC begins FAIR project (larger than MSLUG)2002 Well point investigation conducted and coordinated sampling begins2003 Risk Management Workplan completed by EPA

  • MSLUG

  • October 1993April 1994March 1994September 1993

  • Area History1989-1990 DOT plans Minnie Street ConnectorS&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs)

    1993-1996 MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River 2002 2004ADEC begins FAIR project (larger than MSLUG)2002 Well point investigation conducted and coordinated sampling begins2003 Risk Management Workplan completed by EPA

  • FAIR AREA

  • Four Tank Farms fuel delivered by railUNOCAL TanksSaupes TanksWillners TanksVan Gas Tanks

  • FAIR AREA Baseline Sampling

  • Groundwater Results - 2002

  • Groundwater Results Fall 2003

  • Groundwater Results Spring 2004

  • Groundwater Results - 2002

  • Groundwater Results Fall 2003

  • Groundwater Results Spring 2004

  • Groundwater Results - 2002

  • Groundwater Results Fall 2003

  • Groundwater Results Spring 2004

  • Groundwater Results Spring 2004