fadi al haddad resume cm (1)
TRANSCRIPT
Page 1 of 3
FADI ALHADDAD BSCE in Civil Engineering / Project Management Mobile 00966545888009 Email [email protected] [email protected]
Statement of 16 Years Professional Experience EL-SEIF ENGINEERING CONTRACTING CO. May 2009 up to date Projects SAMBA Tower, KAP 2A, KAFD, HHR & DCP117 (Mega projects including high rise buildings, stadium sport hall, car park, and military projects) Position Construction Manager
Good experience in glazing curtain wall, precast concrete, façade system & finishing materials and execution.
Planning ahead to prevent problems on site before they occur, for example, planning the delivery and storage of equipment and materials
Strong background on the sequence of works, look ahead activities, production and assembly process,
Making safety inspections of the site when work is underway and ensuring regulations relating to health, safety and the environment (HSE) are adhered to
Overseeing the running of several projects
Communicating with a range of people including the client, subcontractors, suppliers, the public and the workforce
Manage and oversee the day-to-day construction management of the project.
Prepares, supervises and approves the development of Project Execution Plan [from construction point of view], and its implementation plus ensuring Lessons Learned are properly documented throughout the life of the project including Project Close-out
Manage the construction effort and be the construction representative of our company with Client. To plan, develop and organize the construction effort to formulate the most cost-effective plan to timely completion within budget and to implement the execution of that plan.
Page 2 of 3
Responsible for implementation of the scope of work as related to construction/ fabrication, pre-commissioning, load-out and offshore installation hook-up and offshore pre-commissioning and Commissioning of the facilities in conformance with project specifications, Scope of Work, and in accordance with the approved Project Schedule.
Monitor and report to Project Manager of project details, including progress, risks and opportunities in a timely manner.
Ensures all changes to specifications, work scope and drawings are documented
Define clear roles & responsibilities and deliverable requirements in terms of both scope and schedule to all the team members.
Review man-hours and duration forecasts to completion for onshore construction and man-hours, duration and manning forecasts for offshore hook-up and offshore installation durations and resource requirements.
Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance. Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions.
Adhere to Company Safety Standards & policy and promote safety culture among the ranks throughout the Company.
Any other ad-hoc projects and duties as required by the management. FAWAZ AL-HOKAIR COMPANY Oct. 2007 - May2009 Position Operation Manager
Sheikh. Fawaz Al-Hokair Palace Extension in Badieh-Riyadh
Sheikh. Abdul Majeed Al-Hokair Palace Extension in Badieh-Riyadh
Sheikh. Walid Al-Hokair Palace Extension in Al-Nakheel-Riyadh.
High class of finishing, wallpaper, painting, parquet, resin, tiles floor finish, plastering, electrical, plumbing, and stone elevations.
SAUDI AL-MIDAN FOR PRECAST Oct 2004 - Jan 2007 Position Assistant Factory Manager
Report to the factory manager on daily basis
Lead petrokemya housing project with SABIC No. of 122 villas in Jubail Industrial City
Wall cladding project with SAUDI CHEVRON PHILLIPS
Big parking with SHARQ
Cladding and stair slabs with Royal Commission
Problem solving to keep the factory progressing
Coordinations between all divisions SAUDI AL-MIDAN FOR PRECAST Oct 2003 up to Oct 2004 Position Production Manager
90 Tilting tables with capacity 2 villas external wall per day
6 battery moulds include 30 vertical tables with capacity one villa internal wall per day
Producing the Pigmentations cladding with the fiber and rubber moulds
Coordinations with the design and installation teams
Page 3 of 3
SAUDI ALMIDAN FOR PRECAST Oct 2002 up to Oct 2003 Position Production Engineer
External wall section with 50 tilting tables
Prepare fiber glass mould with stone texture
Rubber and steel mould used for decorative elements
Mix design for with pigment AL-TAMEER TECHNICAL CONSTRUCTION May 2000 to Oct 2002 Position Construction Engineer
Constructed 10 villas (turn key projects) Dammam
Rajhi Bank site 91 in Dammam
Complete 4 A.T.M. room for Rajhi Bank
5 floor building with basement in Khobar
Housing building ( Al-Barrak Building ) in Khobar Sweet Water & Drainage Department in Syria Jan 2000 up to May 2000 Position Site engineer _______________________________________________________________________________________ Computer experience - MS. Project ' Engineering project management - Microsoft Office - AutoCAD - Oracle Network - 4Projects Network Training CMI - Project Management
- Planning & Organising - Coaching, Mentoring & Delegating - Interview with Recruitment - Team Building - Communication Skills - Managing People - Leadership & Emotional Intelligence - Conflict Resolution
Nationality Syrian Marital Status Married Date of Birth 1973 Residence Address Al Wadi Exit7- Riyadh- Saudi Arabia