Phase II VTA’s BART Silicon Valley Phase II Project is a six-mile, four-station extension that will bring BART train service from Berryessa/North San José through downtown San José to the City of Santa Clara. The Phase II Project is planned to include an approximately five-mile tunnel, three underground stations (Alum Rock/28th Street, Downtown San José, Diridon), one ground-level station (Santa Clara), as well as general and maintenance facilities. Continued on the reverse side FACT SHEET: VTA’s BART Silicon Valley Phase II Extension Project VTA Board Approved Project & Certified Final SEIR April 5, 2018 Engineering & Pre-Construction Environmental Clearance 2018 2019 2020 2021 2022 FTA Issued Record of Decision June 4, 2018 Receive FTA Full Funding Grant Agreement Submit Application for FTA Full Funding Grant Agreement Current planning schedule is based on securing funds through FTA’s Expedited Project Delivery Pilot Program. Program Overview VTA’s BART Silicon Valley Program provides transportation improvements in the corridor that extends from the southern border of Alameda County in the City of Fremont, through the cities of Milpitas, San José, and Santa Clara in Santa Clara County. These improvements include a 16-mile, six-station extension of the Bay Area Rapid Transit (BART) system that is being managed and funded by the Santa Clara Valley Transportation Authority (VTA) in cooperation with BART. VTA’s BART Silicon Valley Extension is being constructed in two phases. Phase I (Berryessa Extension), currently under construction, extends 10 miles south from the Warm Springs/South Fremont station and adds two new stations: Milpitas and Berryessa/North San José. McKee Rd 13th St 19th St 11th St 10th St 4th St 1st St Market St 24th St E Santa Clara St W Santa Clara St W Hedding St N 1st St Coleman Ave NOT TO SCALE N Mineta San José International Airport E Taylor St Newhall Maintenance Facility 680 680 280 880 87 101 101 880 SANTA CLARA STATION DOWNTOWN SAN JOS É STATION DIRIDON STATION ALUM ROCK/ 28TH STREET STATION BERRYESSA/ NORTH SAN JOSÉ STATION Stockton Avenue Ventilation Facility 13th Street Ventilation Facility Phase I Alignment Phase II Ground-Level Alignment Phase II Single-Bore Tunnel Alignment LEGEND BART-Phase2-Overview-042219

Upload: others

Post on 22-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FACT SHEET: VTA’s BART Silicon Valley Phase II Extension ...vtaorgcontent.s3-us-west-1.amazonaws.com/Site... · VTA’s BART Silicon Valley Phase II Project is a six-mile, four-station

Phase IIVTA’s BART Silicon Valley Phase II Project is a six-mile, four-station extension that will bring BART train service from Berryessa/North San José through downtown San José to the City of Santa Clara. The Phase II Project is planned to include an approximately five-mile tunnel, three underground stations (Alum Rock/28th Street, Downtown San José, Diridon), one ground-level station (Santa Clara), as well as general and maintenance facilities.

Continued on the reverse side

FACT SHEET: VTA’s BART Silicon Valley Phase II Extension Project

VTA Board Approved Project

& Certified Final SEIRApril 5, 2018

Engineering & Pre-Construction

Environmental Clearance

2018 2019 2020 2021 2022

FTA Issued Record of Decision

June 4, 2018

Receive FTA Full

Funding Grant Agreement

Submit Application for FTA Full

Funding Grant Agreement

Current planning schedule is based on securing funds through FTA’s Expedited Project Delivery Pilot Program.

2018 2019 2020 2021 2022

Program OverviewVTA’s BART Silicon Valley Program provides transportation improvements in the corridor that extends from the southern border of Alameda County in the City of Fremont, through the cities of Milpitas, San José, and Santa Clara in Santa Clara County. These improvements include a 16-mile, six-station extension of the Bay Area Rapid Transit (BART) system that is being managed and funded by the Santa Clara Valley Transportation Authority (VTA) in cooperation with BART. VTA’s BART Silicon Valley Extension is being constructed in two phases. Phase I (Berryessa Extension), currently under construction, extends 10 miles south from the Warm Springs/South Fremont station and adds two new stations: Milpitas and Berryessa/North San José.

McKee Rd

13th St 19th St11th St

10th St

4th St

1st St

Market St

24th St

E Santa Clara St

W Santa Clara St

W Hedding St

N 1st St

Coleman Ave

NOT TO SCALE

N

Mineta San José

International Airport

E Taylor St

Newhall Maintenance

Facility

680

680

280

880

87

101

101

880

SANTA CLARA STATION

DOWNTOWN SAN JOSÉ STATION

DIRIDON STATION

ALUM ROCK/ 28TH STREETSTATION

BERRYESSA/ NORTH SAN JOSÉ STATION

Stockton Avenue

Ventilation Facility

13th Street Ventilation

Facility

Phase I AlignmentPhase II Ground-Level AlignmentPhase II Single-Bore Tunnel Alignment

LEGEND

VTA’s BART Silicon Valley Phase II Extension ProjectApril 2019

BART-Phase2-Overview-042219

Page 2: FACT SHEET: VTA’s BART Silicon Valley Phase II Extension ...vtaorgcontent.s3-us-west-1.amazonaws.com/Site... · VTA’s BART Silicon Valley Phase II Project is a six-mile, four-station

Stations at a Glance

FeaturesAlum Rock/

28th Street StationDowntown

San José StationDiridon Station

Santa Clara Station

Daily Ridership 2035 Projection 10,300 24,300 9,600 7,800

Underground Station X X X

Passenger Drop-off Areas X X X X

Shuttle Drop-off Area X X X

Bicycle Storage Facility X X X X

Parking Facility X X

Proposed Transit-Oriented Joint Development

X X X X

Intermodal Transit Connections

Funding Strategy

Local & State Funds ............................. $4.186 Billion- 2000 Measure A Sales Tax- 2016 Measure B Sales Tax - Regional Measure 3- Traffic Congestion Relief Program- Transit & Intercity Rail Capital Program

Federal Funds ...................................... $1.395 Billion- FTA Capital Investment Grants Program

Projected Funding ...............................$5.581 Billion*

* Funding strategy will be updated as project advances and after further coordination with FTA on assessment of project risks.

BenefitsVTA’s BART Phase II Extension will:

• Improve and preserve multimodal mobility and accessibility for all people

• Support a vibrant economy

• Foster livable and healthy communities and promote social equity

• Reduce vehicles on the roadway network as well as greenhouse gases

• Provide high frequency transit service from the South Bay to the rest of the Bay Area

Bus Light Rail Commuter Rail/ Inter-city Rail

High-Speed Rail