fact sheet - ardot€¦ · presentation contact: connecting arkansas program re: i-30 pel study...

2
FACT SHEET What is the Interstate 30 Planning and Environmental Linkages Study? The Arkansas State Highway and Transportation Department (AHTD) is dedicated to working with our community to provide safe and reliable transportation solutions for Arkansas. As part of this mission, we are beginning the community discussion and visioning process for transportation improvements along I-30 in central Arkansas. The study area includes I-30 from I-40 in the north to I-530 in the south, including the Arkansas River Bridge, as well as I-40 from JFK Boulevard east to U.S. 67. The Planning and Environmental Linkages (PEL) process will be followed for the I-30 study and will identify and document the transportation needs and potential improvements for the study area. What is the PEL process? The PEL process was established by the Federal Highway Administration (FHWA) to provide a more efficient process of identifying, evaluating, and selecting preferred transportation improvements. This process allows early, planning-level decisions to be carried forward to accelerate future National Environmental Policy Act (NEPA) activities. What are the benefits of the PEL process? In addition to informing and expediting the NEPA process, the PEL process will provide an opportunity for early coordination with the public as well as local, state, and federal agencies in a transparent and collaborative environment. By working together, alternatives and avoidance measures can be developed at a local level. How long will the PEL process take? The I-30 PEL study began in April 2014 and is anticipated to conclude in the summer of 2015. A report will be prepared to document the PEL process and recommended solutions. Why is the PEL process needed for the I-30 improvements? A feasibility study prepared jointly by AHTD and Metroplan in 2003 identified the need for transportation improvements for crossings of the Arkansas River. Some of the challenges identified include: Increasing traffic congestion and travel times Inadequate roadway capacity Roadway safety and operational concerns Structural and functional roadway and bridge deficiencies The PEL study will function to expedite the process of identifying a proposed solution or series of solutions to these challenges, as well as potential funding options. How can the public get involved? We understand that any proposed solution to the region’s transportation needs must address issues and concerns from many stakeholders. Our process is driven by continuous outreach to engage the community throughout the study. AHTD will host future public meetings at locations that will be convenient to attendees from the study area. The public meetings will be held to provide project information and gather input from all those interested in the I-30 PEL Study. To learn more or to request a presentation contact: Connecting Arkansas Program RE: I-30 PEL Study 4701 Northshore Drive North Little Rock, AR 72118 Email: [email protected] Phone: 501-255-1519 Web: www.ConnectingArkansasProgram.com FACT SHEET CA0602 Interstate 530 - Highway 67 30

Upload: others

Post on 06-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

FACT SHEETWhat is the Interstate 30 Planning and Environmental Linkages Study?The Arkansas State Highway and Transportation Department (AHTD) is dedicated to working with our community to provide safe and reliable transportation solutions for Arkansas. As part of this mission, we are beginning the community discussion and visioning process for transportation improvements along I-30 in central Arkansas. The study area includes I-30 from I-40 in the north to I-530 in the south, including the Arkansas River Bridge, as well as I-40 from JFK Boulevard east to U.S. 67.

The Planning and Environmental Linkages (PEL) process will be followed for the I-30 study and will identify and document the transportation needs and potential improvements for the study area.

What is the PEL process? The PEL process was established by the Federal Highway Administration (FHWA) to provide a more efficient process of identifying, evaluating, and selecting preferred transportation improvements. This process allows early, planning-level decisions to be carried forward to accelerate future National Environmental Policy Act (NEPA) activities.

What are the benefits of the PEL process?In addition to informing and expediting the NEPA process, the PEL process will provide an opportunity for early coordination with the public as well as local, state, and federal agencies in a transparent and collaborative environment. By working together, alternatives and avoidance measures can be developed at a local level.

How long will the PEL process take? The I-30 PEL study began in April 2014 and is anticipated to conclude in the summer of 2015. A report will be prepared to document the PEL process and recommended solutions.

Why is the PEL process needed for the I-30 improvements? A feasibility study prepared jointly by AHTD and Metroplan in 2003 identified the need for transportation improvements for crossings of the Arkansas River. Some of the challenges identified include:

• Increasing traffic congestion and travel times

• Inadequate roadway capacity

• Roadway safety and operational concerns

• Structural and functional roadway and bridge deficiencies

The PEL study will function to expedite the process of identifying a proposed solution or series of solutions to these challenges, as well as potential funding options.

How can the public get involved? We understand that any proposed solution to the region’s transportation needs must address issues and concerns from many stakeholders. Our process is driven by continuous outreach to engage the community throughout the study. AHTD will host future public meetings at locations that will be convenient to attendees from the study area. The public meetings will be held to provide project information and gather input from all those interested in the I-30 PEL Study.

To learn more or to request apresentation contact:

Connecting Arkansas ProgramRE: I-30 PEL Study4701 Northshore DriveNorth Little Rock, AR 72118

Email: [email protected]: 501-255-1519 Web: www.ConnectingArkansasProgram.com

FACT SHEET CA0602Interstate 530 - Highway 67 30

6th

Arch

7thI

3rd

16th

F

Hills

2nd

Pike

UPR

R R

ailro

ad

Mai

n

5th

River

A

Cro

ss

Scot

t

B

Mccain

47th

Locu

st

G

H

M

13th

Broa

dway

Stat

e

Alle

n

Land

ers

Frazier

Inte

rsta

te 3

0

Macarthur

Roosevelt

War

den

Fairway

Gai

nes

Washington

3 M

K

21st

Wol

fe

Rid

ge

Lake

view

1stWright

C

Loui

sian

a

Park

Bond

Dix

ie

Palm

Cantrell

Milit

ary

58th

Skyline

Pula

ski

Che

ster

John

F K

enne

dy

Lincoln

Parkway

Interstate 530

Pye

Pershing

Woodrow

Batte

ry

Calvary

Springer

51st

34th

4th

Wat

er

Sunset

15th

Vine

11th

Mar

shal

l

Smok

ey

E

65th

Hig

hway

365

Lee

8th

Park

er

27th

9th

Cam

p R

obin

son

Van

22nd

D

41st

Interstate 40

Div

isio

n

Ben

Map

le

39th

Baucum

Lochridge

Randolph

Interstate 440

Ira

43rd

Bethany

Seminole

38th

Kay

12th

17th

Poe

Col

lege

Koehler

Lindsey

Coulter

Brag

g

Waterside

Walnut

TopfC

omm

erce

Loch

Zeub

er

Laharpe

Bank

head

Gribble

Tem

ple

Crestwood

Jone

s

Kierre

Highway

671

67

Carter

Flor

a

29th

Garland

Markham

Riverfront

Rin

go

14th

Percy Machin

Fron

tage

School

Arkansas

Cru

tche

r

Barb

er

Mills

Sprin

gCherry Hill

Long 17Th

Texas

Pope

Dulin

23rd

Schi

ller

Lynn

Donovan Briley

Allie

d

Somers

55thRock

Interstate 630

Atkins

Cal

houn

Byrd

Just

in

Richards

56th

Forre

ster

Wilbern

Ric

e

Burr

ow

Bay Oaks

Edm

onds

Curtis Sykes

Ced

ar

Beec

h

18th

Silver Creek

How

ard

Cen

ter

Gill

Doug

las

26th

Trust

Edge

24th

50th

45th

King

Sprin

ghill

Popl

arG

reenway

46th

Bolton

Izar

d

Birc

h

Lake

Foxboro

28th

Tow

nsen

d

Idlewild

Picron

Elm

Harper

Hig

h

Fulto

n

Walters

19th

10th

Pear

l

Ora

nge

Che

rry

Ferry

Will

ow

Vict

ory

Fourch

e Dam

Gillam

Park

East

Allw

ood

30th

Sonora

Vanc

e

37th

Phillips

Bend

er

Navajo

Gum

Car

olin

a

Sam Evans

Haz

el

Gat

es

North

Scenic

Dix

on

Airp

ort

Nic

ole

Latona

36th

Gregory

Dooley

Cor

ning

Hampton

Mas

sie

31st

Athens

33rd

Fran

k

Gor

don

Virg

inia

Dunkeld

52nd

Joe K Poch

Funland

Tech

Libby

Dawson

West

Barto

n

Gray

Fran

klin

Kellett

Buck

eye

Middleton

Oak

ley

World

Dug

an

Fork River

Oaks

Jessie

25th

Dav

id G

rund

fest

Jr

Gen

eva

Lori

Pine

Mcm

ath

Desoto

President Clinton

Fork

Thay

er

Buck

les

Oliv

e

Cap

itol

Taylor

Rog

ers

Wis

teria

35th

Sloane

Justin M

atthews

Martin

Belmont

Bren

tDevon

20th

Floral

Bish

op

Barbara

Rus

sell

Last

Mar

ion

Thom

as

Northline Newm

an

Cyp

ress

Fairpoint

Becky

Vest

al

Coolwood

Julia

n

Rus

tic

Mag

nolia

Sum

mit

Ambe

r

Health Care

Hay

s

Lero

y

Park

view

Car

son

Church

Tuxedo

Blackfoot

Turner

Valliere

Appi

anw

ay

Jeck

Sandbar

Saint Clare

Airp

ort

Capitol

10th

Roosevelt

Pine

Park

Izar

d

20th

11th

Sprin

g

19thFe

rry

Milit

ary

17th

22nd

Dixie

Locu

st

58th

38th

12th

18th

18th

Rin

go

4th

26th

51st

4th

6th

Mai

n

16th

8th

21st

2nd

8th

17th

Mar

ion

Pike

19th

Interstate 530

Wal

nut

Hills

2nd2nd

2nd

12th

War

den

Interstate 440

D

9th

8th

12th

9th

8th

46th

10th

Wol

fe

2nd

Allied

8th

Oliv

e

33rd

11th

18th

56th

High

17th

36th

4th

10th

Scenic

4th

367

107

365

176

10100

5

338

365

440

30

40

40

630

530

30

67

167

70

165

Pulaski County

Fourche Creek

Arkansas River

Shilcotts Bayou

Fivemile Creek

Little Rock

North Little Rock

Sherwood

Big Rock Settling Pond

Lake Number Two

e Number One

Lakewood Lake Number Three

Lakewood Lake Number Six

0 1,500 3,000 4,500 6,000Feet

CA0602 Interstate 530 – Highway 67Interstates 30/40

Interstate

Highways

Small Roads

County Line

Pond/River

City Limits

CAP Project

Other CAP Project

Map KeyInterstate

Highways

Small Roads

County Line

Pond/River

City Limits

CA0602Study Area

Map Key