7 FACT SHEET Altamaha, .039 MW Solar Facility Toombs County, Ga. Project Overview: • The Solar Project is located in Toombs County, Ga. • Expected to generate 40 megawatt hours of clean, renewable electricity annually. • Offset is equivalent to 30 metric tons of greenhouse gas emissions. • Will produce enough electricity to serve about 3 EMC households. Technical Details: • Generation Capacity: .039 MW • Nominal Capacity Factor: 11 Percent • Owner/Operator: Green Power Solar/Altamaha EMC Number of Participating Electric Membership Corporations: One 2100 East Exchange Place Tucker, GA 30084 770-270-7900 POWER EMC GREEN RENEWABLE ENERGY Other Green Power EMC Solar Facility

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

7

FACT

SH

EET Altamaha, .039 MW Solar Facility

Toombs County, Ga.

Project Overview:• The Solar Project is located in Toombs County, Ga.

• Expected to generate 40 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 30 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 3 EMC households.

Technical Details:• Generation Capacity: .039 MW

• Nominal Capacity Factor: 11 Percent

• Owner/Operator: Green Power Solar/Altamaha EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Other Green Power EMC Solar Facility

Page 2: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

8

FACT

SH

EET Azalea Solar Farm, 7.7 MW Solar Facility

Washington County, Ga.

Project Overview:• The solar project is located in Washington County, Ga.

• Expected to generate 14,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 11,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 900 EMC households.

Technical Details:• Generation Capacity: 7.7 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Dominion Energy

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 3: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

9

FACT

SH

EET Bancroft Station, 102.5 MW Solar Facility

Early County, Ga.

Project Overview:• The solar project is located in Early County, Ga.

• Expected to generate 224,500 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 167,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 15,000 EMC households.

Technical Details:• Generation Capacity: 102.5 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 4: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

10

FACT

SH

EET Cairo Solar Farm, 2 MW Solar Facility

Grady County, Ga.

Project Overview:• The solar project is located in Grady County, Ga.

• Expected to generate 4,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 2,700 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 250 EMC households.

Technical Details:• Generation Capacity: 2 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Velo Solar

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 5: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

11

FACT

SH

EET Cedar Creek, 2 MW Solar Facility

Barrow County, Ga.

Project Overview:• The solar project is located in Barrow County, Ga.

• Expected to generate 4,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 2,700 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 250 EMC households.

Technical Details:• Generation Capacity: 2 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Velo Solar

Number of Participating Electric Membership Corporations: Eight

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 6: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

12

FACT

SH

EET Clean Control, 0.15 MW Solar Facility

Houston County, Ga.

Project Overview:• The solar project is located in Houston County, Ga.

• Expected to generate 200 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 200 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 14 EMC households.

Technical Details:• Generation Capacity: 0.15 MW

• Nominal Capacity Factor: 16 Percent

• Owner/Operator: Clean Control Corporation

Number of Participating Electric Membership Corporations: 14

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 7: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

13

Other Green Power EMC Solar Facility

FACT

SH

EET Coastal – Bryan County, .006 MW Solar Facility

Bryan County, Ga.

Project Overview:• The solar project is located in Bryan County, Ga.

• Expected to generate 10 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 8 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 1 EMC household.

Technical Details:• Generation Capacity: .006 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Coastal EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 8: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

14

Other Green Power EMC Solar Facility

FACT

SH

EET Coastal – Liberty County, .05 MW Solar Facility

Liberty County, Ga.

Project Overview:• The solar project is located in Liberty County, Ga.

• Expected to generate 90 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 70 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 6 EMC households.

Technical Details:• Generation Capacity: .05 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Coastal EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 9: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

15

Other Green Power EMC Solar Facility

FACT

SH

EET Coastal – McIntosh County, .072 MW Solar Facility

McIntosh County, Ga.

Project Overview:• The solar project is located in McIntosh County, Ga.

• Expected to generate 130 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 100 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 9 EMC households.

Technical Details:• Generation Capacity: .072 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Coastal EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 10: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

16

FACT

SH

EET Eatonton, 1 MW Solar Facility

Putnam County, Ga.

Project Overview:• The solar project is located in Putnam County, Ga.

• Expected to generate 2,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 1,400 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 120 EMC households.

Technical Details:• Generation Capacity: 1 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Tri-County EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 11: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

17

FACT

SH

EET Glynn County, 1.8 MW Solar Facility

Glynn County, Ga.

Project Overview:• The solar project is located in Glynn County, Ga.

• Expected to generate 3,600 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 2,700 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 240 EMC households.

Technical Details:• Generation Capacity: 1.8 MW

• Nominal Capacity Factor: 23 Percent

• Owner/Operator: Green Power Solar/Okefenoke REMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 12: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

18

FACT

SH

EET GreyStone, 1 MW Solar Facility

Paulding County, Ga.

Project Overview:• The solar project is located in Paulding County, Ga.

• Expected to generate 2,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 1,500 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 140 EMC households.

Technical Details:• Generation Capacity: 1 MW

• Nominal Capacity Factor: 23 Percent

• Owner/Operator: Green Power Solar/GreyStone Power Corporation

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 13: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

19

FACT

SH

EET Hazlehurst, 20 MW Solar Facility

Jeff Davis County, Ga.

Project Overview:• The solar project is located in Jeff Davis County, Ga.

• Expected to generate 40,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 29,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 2,600 EMC households.

Technical Details:• Generation Capacity: 20 MW

• Nominal Capacity Factor: 22 Percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: 27

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 14: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

20

FACT

SH

EET SR Hazlehurst III, 40 MW Solar Facility

Jeff Davis County, Ga.

Project Overview:• The solar project is located in Jeff Davis County, Ga.

• Expected to generate 88,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 65,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 5,900 EMC households.

Technical Details:• Generation Capacity: 40 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: 32

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 15: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

21

FACT

SH

EET Hilliard, 0.108 MW Solar Facility

Nassau County, Ga.

Project Overview:• The solar project is located in Nassau County, Ga.

• Expected to generate 200 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 200 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 14 EMC households.

Technical Details:• Generation Capacity: 0.108 MW

• Nominal Capacity Factor: 22 Percent

• Owner/Operator: Green Power Solar/Okefenoke REMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 16: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

22

FACT

SH

EET Irwin, 1 MW Single-axis Tracking Solar Facility

Ben Hill County, Ga.

Project Overview:• The solar project is located in Ben Hill County, Ga.

• Expected to generate 2,400 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 1,800 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 160 EMC households.

Technical Details:• Generation Capacity: 1 MW

• Nominal Capacity Factor: 27 Percent

• Owner/Operator: Green Power Solar/Irwin EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 17: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

23

FACT

SH

EET Kingsland, 0.108 MW Solar Facility

Camden County, Ga.

Project Overview:• The solar project is located in Camden County, Ga.

• Expected to generate 200 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 200 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 15 EMC households.

Technical Details:• Generation Capacity: 0.108 MW

• Nominal Capacity Factor: 23 Percent

• Owner/Operator: Green Power Solar/Okefenoke REMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 18: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

24

FACT

SH

EET Middle Georgia EMC, 1 MW Solar Facility

Dooly County, Ga.

Project Overview:• The solar project is located in Dooly County, Ga.

• Expected to generate 1,800 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 1,400 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 120 EMC households.

Technical Details:• Generation Capacity: 1 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Green Power Solar/Middle Georgia EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 19: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

25

FACT

SH

EET Rooker, 0.115 MW Solar Facility

Clarke County, Ga.

Project Overview:• The solar project is located in Clarke County, Ga.

• Expected to generate 140 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 100 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 9 EMC households.

Technical Details:• Generation Capacity: 0.115 MW

• Nominal Capacity Factor: 14 Percent

• Owner/Operator: Rooker Athens, LLC

Number of Participating Electric Membership Corporations: 14

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 20: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

26

FACT

SH

EET Sandhills Solar, 143 MW Solar Facility

Taylor County, Ga.

Project Overview:• The solar project is located in Taylor County, Ga.

• Expected to generate 350,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 260,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 24,000 EMC households.

Technical Details:• Generation Capacity: 143 MW

• Nominal Capacity Factor: 28 Percent

• Owner/Operator: Southern Power

Number of Participating Electric Membership Corporations: Five

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 21: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

27

FACT

SH

EET Satilla REMC, 1 MW Solar Facility

Bacon County, Ga.

Project Overview:• The solar project is located in Bacon County, Ga.

• Expected to generate 2,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 1,500 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 140 EMC households.

Technical Details:• Generation Capacity: 1 MW

• Nominal Capacity Factor: 23 Percent

• Owner/Operator: Green Power Solar/Satilla REMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 22: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

28

FACT

SH

EET Snapping Shoals EMC, 2.7 MW Solar Facility

Newton County, Ga.

Project Overview:• The solar project is located in Newton County, Ga.

• Expected to generate 4,700 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 3,500 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 320 EMC households.

Technical Details:• Generation Capacity: 2.7 MW

• Nominal Capacity Factor: 20 Percent

• Owner/Operator: Green Power Solar/Snapping Shoals EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 23: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

29

FACT

SH

EET SR South Loving, 51.2 MW Solar Facility

Jeff Davis County, Ga.

Project Overview:• The solar project is located in Jeff Davis County, Ga.

• Expected to generate 110,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 83,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 7,500 EMC households.

Technical Details:• Generation Capacity: 51.2 MW

• Nominal Capacity Factor: 25 Percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: Nine

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Page 24: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

30

FACT

SH

EET Turnipseed, 3 MW Solar Facility

Douglas County, Ga.

Project Overview:• The solar project is located in Douglas County, Ga.

• Expected to generate 5,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 4,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 350 EMC households.

Technical Details:• Generation Capacity: 3 MW

• Nominal Capacity Factor: 20 Percent

• Owner/Operator: Velo Solar

Number of Participating Electric Membership Corporations: Nine

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 25: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

31

FACT

SH

EET Walton I, 1 MW Solar Facility

Walton County, Ga.

Project Overview:• The solar project is located in Walton County, Ga.

• Expected to generate 2,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 1,400 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 120 EMC households.

Technical Details:• Generation Capacity: 1 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Walton EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 26: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

32

FACT

SH

EET Walton II, 2.5 MW Solar Facility

Walton County, Ga.

Project Overview:• The solar project is located in Walton County, Ga.

• Expected to generate 4,600 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 3,400 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 310 EMC households.

Technical Details:• Generation Capacity: 2.5 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Walton EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 27: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

33

FACT

SH

EET Walton III, 3 MW Solar Facility

Walton County, Ga.

Project Overview:• The solar project is located in Walton County, Ga.

• Expected to generate 5,500 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 4,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 370 EMC households.

Technical Details:• Generation Capacity: 3 MW

• Nominal Capacity Factor: 21 Percent

• Owner/Operator: Walton EMC

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Page 28: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

34

UNDER CONSTRUCTION

FACT

SH

EET Calhoun County, 80 MW Solar Facility

Calhoun County, Ga.

Project Overview:• The solar project is located in Calhoun County, Ga.

• Expected to generate 175,200 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 130,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 12,000 EMC households.

Technical Details:• Generation Capacity: 80 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Starta Solar

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Projected to be completed in 2020

Page 29: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

35

UNDER CONSTRUCTION

FACT

SH

EET Colquitt County, 20 MW Solar Facility

Colquitt County, Ga.

Project Overview:• The solar project is located in Colquitt County, Ga.

• Expected to generate 43,800 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 33,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 3,000 EMC households.

Technical Details:• Generation Capacity: 20 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Starta Solar

Number of Participating Electric Membership Corporations: One

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Projected to be completed in 2020

Page 30: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

36

UNDER CONSTRUCTION

FACT

SH

EET SR Arlington, 20 MW Solar Facility

Early County, Ga.

Project Overview:• The solar project is located in Early County, Ga.

• Expected to generate 44,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 33,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 3,000 EMC households.

Technical Details:• Generation Capacity: 20 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: 30

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Projected to be completed in 2022

Page 31: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

37

FACT

SH

EET SR Cedar Springs, 70 MW Solar Facility

Early County, Ga.

Project Overview:• The solar project is located in Early County, Ga.

• Expected to generate 153,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 114,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 10,300 EMC households.

Technical Details:• Generation Capacity: 70 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: Four

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Projected to be completed in 2022

UNDER CONSTRUCTION

Page 32: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

38

UNDER CONSTRUCTION

FACT

SH

EET SR Clay County, 106 MW Solar Facility

Clay County, Ga.

Project Overview:• The solar project is located in Clay County, Ga.

• Expected to generate 232,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 172,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 15,500 EMC households.

Technical Details:• Generation Capacity: 106 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: 30

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Projected to be completed in 2022

Page 33: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

39

UNDER CONSTRUCTION

FACT

SH

EET SR Perry, 68 MW Solar Facility

Houston County, Ga.

Project Overview:• The solar project is located in Houston County, Ga.

• Expected to generate 150,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 111,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 10,000 EMC households.

Technical Details:• Generation Capacity: 68 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: 30

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Projected to be completed in 2022

Page 34: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

40

UNDER CONSTRUCTION

FACT

SH

EET SR Snipesville, 86 MW Solar Facility

Jeff Davis County, Ga.

Project Overview:• The solar project is located in Jeff Davis County, Ga.

• Expected to generate 189,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 140,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 13,000 EMC households.

Technical Details:• Generation Capacity: 86 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: 32

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm

Projected to be completed in 2021

Page 35: FACT SHEET - Co-op Web Builder 3gpemcsolar.coopwebbuilder2.com/sites/gpemcsolar/files...2012/05/19  · FACT SHEET Middle Georgia EMC, 1 MW Solar acility F Dooly County Project Overview:

41

UNDER CONSTRUCTION

FACT

SH

EET SR Terrell, 74 MW Solar Facility

Terrell County, Ga.

Project Overview:• The solar project is located in Terrell County, Ga.

• Expected to generate 162,000 megawatt hours of clean, renewable electricity annually.

• Offset is equivalent to 121,000 metric tons of greenhouse gas emissions.

• Will produce enough electricity to serve about 11,000 EMC households.

Technical Details:• Generation Capacity: 74 MW

• Nominal Capacity Factor: 25 percent

• Owner/Operator: Silicon Ranch Corporation

Number of Participating Electric Membership Corporations: 32

2100 East Exchange Place Tucker, GA 30084770-270-7900

POWER EMCGREENRENEWABLE ENERGY

Generic Solar Farm