Facing the Challenges for Addressing Accountability and Impacts of Donor Funded Projects in Public Sector where
Private Sector Provides Technical Assistance
IDEAS Conference 2011, Amman
PresenterPreethi De Silva, Sri Lanka
Objective of the Presentation
The objective of the presentation is to reveal major practical challenges faced for addressing accountability and impacts in implementing donor funded project in developing countries with special reference to presenter’s practical experience in public sector where Private Sector provides Technical Assistance.
Public Concerns
Delay
Waste
Mismanagement
Corruption
Performance of Public Sector
Visible signs of change and improvements to public mass in terms of social needs.
Accountability
Performance of Public Sector
Return on Investment
Financial Progress
Public Sector Performance
National Audit Systems
Alternate Methodologies
Private Sector Assistance for Donor Funded Projects
Project Preparatory Technical Assistance (PPTA)
Technical Assistance for Implementation Support
Accountability
Public Sector Consulting Firms
Scenarios Where Project Performance Falls less than Expected
Consultancy Firm - Technically sound, committed whereas obstacles in Public Sector
Lack of institutional capacity Lack of interest and firm commitment Strict financial regulations Delayed administrative procedures Politically appointed Project Director
S
Scenarios Where Project Performance Falls less than Expected
Public Sector - Well prepared to receive TA Public Sector where as Consulting Firm not fully capable of delivering outputs
Weak team leadership Incompetent consultants No appropriate blend of Consultants in the Team
Other Common Causes
Weak project designs by PPPTA Too many/unwanted Specialists No technical backstopping from
the firm
Example for QCBS Evaluation
FirmTechnical Score (out of 1000)
Technical Score (out
of 800)
Financial Cost (USD
Million)
Finnacial Score (out
of 200)
Final Score (Out of 1000)
Final Score (Out of
100)
Firm # 1 815 652 1.08 148 800 80.01
Firm # 2 830 664 1.15 139 803 80.31
Firm # 3 820 656 1.56 103 759 75.86
Firm # 4 755 604 0.8 200 804 80.40
Firm # 5 800 640 1.1 145 785 78.55
Points Firm # 1 Firm # 2 Firm # 3 Firm # 4 Firm # 5
1 Expereince of the Consulting firm related to the assignment 10
1.1 Specific experience in M&E 61.1.1 at least 1 assignment of similar nature 21.1.2 at least 2 assignments of similar nature 21.1.3 more than two assignments of similar nature 2
1.2 Specific experience in MIS 41.2.1 at least 1 assignment of similar nature 21.2.2 at least 2 assignments of similar nature 21.2.3 more than two assignments of similar nature 2
2 Adquacy of Proposed Methoddology 25
2.1 Approach & Methodology 10
2.2 Work Plan & Staff Assignment 5
2.2 Capacity Building & Transfer of Knowledge 10
3.1 Team Leader 10Genaral Qualifications 2
3.1.1 Minimum Masters degree/professional equivalent 13.1.2 Training in M&E field 1
Task specific experience 5
3.1.3 Similar M&E/assessment experience 33.1.4 Training experience 2
Country Experience & other similar countries3.1.5 Country Experience 2
3.1.6 Experience in small island developing countries 13.1.7 Experience in developing countries other than above 1
Adequacy for the Project 1
3.1.8 Suitability to perform the duties for the assignment 1
particular assignment 3.2 Survey Specialist 10
Genaral Qualifications 2
3.1.1 Minimum Masters degree/professional equivalent 13.1.2 Training in M&E field 1
Task specific experience 5
3.1.3 Similar Survey/Study Expereince 33.1.4 Training experience 2
Country Experience & other similar countries3.1.5 Country Experience 2
3.1.6 Experience in small island developing countries 13.1.7 Experience in developing countries other than above 1
Adequacy for the Project 1
3.1.8 Suitability to perform the duties for the assignment 1
4 Participation by nationals among proposed key staff 5
3
Criteria & Sub-critera for Evaluating Technical Proposals
Adequcy of Key professional staff qualifications & competence for the
assignment60
How would you overcome such practical problems?
Thank you for your time and attention!
Preethi De Silva Email: [email protected]