facility profile - peel district school board · facility profile credit view public school...
TRANSCRIPT
APPENDIX 5
SCHOOL INFORMATION PROFILE Credit View Public School
December 12, 2016
P a g e 1 | 6
FACILITY PROFILE
Credit View Public School
Address: 13990 Mississauga Road, Caledon, Ont. L7C-1W4
Date of Construction 1965
Date and Description of Subsequent Additions (if any) -
Number of Storeys 1
School Site Size (ha and ac) 2.83 hectares ; 7 acres
Building Area – GFA (m2 and sq.ft.) 1,438.30 m2 ; 15,481.7 sq. ft.
Site Plan See attached appendix 5A
Floor Plan For safety reasons floor plans are not posted
Boundary Map See attached appendix 5B
Context Map / Aerial Photo See attached appendix 5C
Official Plan or Secondary Plan Land Use Designation Map See attached appendix 5D
Zoning Map See attached appendix 5E
Does the School have a Child Care Centre? No
Does the School have a Before and After School Program? No
Does the School have a Child and Family Learning Centre? No
Does the School have a Parenting and Family Literacy Centre? No
School Capacity Information:
Current Enrolment (As of September 30) 81
Ministry Rated Capacity (MRC) 104
Utilization (%) 77.88%
Surplus / Shortage of Pupil Places 23 surplus
Number of Portapak / RCM units on School Site 0
Number of Portables on School Site 2
Number of Portables in use on School Site 1
Maximum Number of Portables Allowable on School Site 2
Instructional And Specialized Classroom Spaces
Number of Regular Instructional Classrooms 4
Number of Purpose Built Kindergarten Rooms 1
Number of Special Education Rooms -
Number of Specialized Teaching Classroom Spaces :
Literary Resource Centre -
Science and Technology Lab -
Computer Lab 1
Art Room -
Media Room -
Music Room -
Technology Room/Shop -
APPENDIX 5
SCHOOL INFORMATION PROFILE Credit View Public School
December 12, 2016
P a g e 2 | 6
General Purpose Room 1
Gymnasium -
Fitness Room -
Weight Room -
Family Studies Room -
Cafeteria / lunch Room -
Assembly / Auditorium / Theatre / Lecture -
Library 1
Staff Room 1
Stage 1
Kitchen 1
Resource Room -
Seminar Room -
Other 1 BTA Room / Staff Work Room
Outdoor Play Area and Green Space
Area of Green Space (m2 and sq. ft) 20,569 m2 (221,408 sq. ft.)
Area of Hard Surfaced Play Area (m2 and sq. ft) 1,950 m2 (20,990 sq. ft.)
Total Number of Playfields 2
List of Outdoor Facilities (e.g. tracks, basketball court, tennis court, etc.) Soccer Field, Baseball
Accessibility
Is the School Universally Accessible? Yes
Does the School have an Operating Elevator/Lift? N/A
Do Students have Access to Barrier Free Washrooms? No
Are Student Washrooms Accessible on Each Level of the Building? Yes
Are the Designated Change rooms Accessible to the Gym? Yes
Parking
Total Number of Parking Spaces 19
Total Number of Accessible Parking Spaces 1
Is There an Adequate Amount of Parking Available? Yes
Is there bus/car access and egress? Yes
Facility Condition Facility Condition Index (FCI) is determined by the ratio between the five year renewal needs and the replacement value for the school. A higher FCI indicates a higher cost to repair the facility Facility Condition Index (FCI) of the School 58 %
Ten Year History of Major Facility Improvements (item and cost):
See attached appendix 5F
Projected Five Year Facility Renewal Needs (item and cost):
See attached appendix 5G
APPENDIX 5
SCHOOL INFORMATION PROFILE Credit View Public School
December 12, 2016
P a g e 3 | 6
Financial Information
Facilities Operations (Sept.2015 – Aug. 2016) $ 104,771.89
Utility Costs (Sept.2015 – Aug. 2016) $ 39,141.45
Maintenance Services (Sept.2015 – Aug. 2016) $ 16,709.61
TOTAL Operational Costs $ 160,622.95
Per m2 / Square Foot $ 111.67 per m2 ($ 10.37 per sq. ft.)
Per Student $ 1,982.99
Transportation Information
Kiss and Ride Lane Yes
Bus Loading Zone Yes
Proximity of Students to School
Distance of Closest Student to School 0.34km
Distance of Furthest Student to School 6.97km
Average Distance to School for Students 2.86km
Number of Students Bussed to School 72
Percentage of Students that are Eligible for Transportation(%) 88.9 %
Percentage of Students not Eligible for Transportation (%) 11.1 %
Longest Bus Ride to School (minutes) 40 minutes
Shortest Bus Ride to School (minutes) 6 minutes
Average Length of Bus Ride to School (minutes) 23 minutes
INSTRUCTIONAL PROFILE
Staffing Information – Teaching (Elementary):
Number of Classroom Teachers 9
Number of Special Education Teachers (e.g. Contained, ISSP, Behavioral, Contact, etc.)
1
Number of Specialized Teachers (e.g. HOH) 1
Number of Specialized Teachers – Planning Time (e.g. Music, Arts, Phys Ed, Language, etc.)
1
Number of ESL Teachers 1
Number of Librarians 1
Other (Please Specify) 2 (1 Guidance Counselor & 1 Core French)
Staffing Information – Teaching (Secondary):
Number of Classroom Teachers -
Number of ESL Teachers -
Number of ELD Teachers -
Number of Vocational Level One Teachers -
IB Coordinator Time Release Teacher -
Number of Librarians -
APPENDIX 5
SCHOOL INFORMATION PROFILE Credit View Public School
December 12, 2016
P a g e 4 | 6
Number of Counselors -
Over Complement Support Teachers (Regional Learning Choices, Native Studies)
-
Number of Regional Cooperative Education Teachers -
Number of Student Success Teachers -
Number of International Student Centre Teachers -
Number of Regional Communications Program Teachers -
Number of ASD Resource Program Teachers -
Number of District Developmental Disabilities Teachers -
Number of Learning Support Teachers -
Number of In-School Support Resource Teachers -
Number of Contact Teachers -
Number of Section 23 Teachers -
Other (Please Specify) -
Staffing Information – Non-Teaching (Elementary)
Number of Designated Early Childhood Educators 1
Number of Education Resource Workers / Teaching Assistants 2
Other (Please Specify) -
Staffing Information – Non-Teaching (Secondary)
Number of Education Resource Workers / Teaching Assistants -
Other (Please Specify) -
Staffing Information – Itinerant Staff (Elementary and Secondary)
Number of Social Workers 1
Number of Child and Youth Workers -
Number of Psychological Associates 1
Number of Speech and Language Pathologists 1
Other (Please Specify) 1 (special education resource teacher)
Staffing Information – Support Staff (Elementary and Secondary)
Full-Time Office Manager 1
Office Assistant (Full-Time or Half-Time) 1
Total Number of Office Assistants 2
Number of Custodial Staff 1
Other (Please Specify) -
Staffing Information – Administrative Staff (Elementary and Secondary)
Full-Time Principal 1
Full-Time Vice-Principal -
Total Number of Full-Time Vice-Principals -
Half-Time Vice-Principal -
Total Number of Half-Time Vice-Principals -
Other (Please Specify) -
APPENDIX 5
SCHOOL INFORMATION PROFILE Credit View Public School
December 12, 2016
P a g e 5 | 6
School Organization
Grade Configuration Kindergarten to Grade 8
Grade Organization (Number of Classes) 5
Total Number of Classes 5
Total Number of Combined Grades 4
Classroom Usage (%) 100 %
Number of Out Of Area Students 0
Course and Program Offerings and Specialized Services Information
Does the School Offer a Regional Program? No
Does the School Offer a Specialist High Skills Major Program? No
Does the School Offer an Explore High Skills Major Program (Pre-SHSM)?
No
Extended French No
French Immersion No
Information Technology to Support Curriculum No
Guidance Counselling Yes
Career Education Programs (e.g. Co-op Placements) No
Early Literacy Programs No
Culturally Inclusive Programs No
English-as-a-Second-Language Programming Yes
Special Education Classes No
Special Education Resources Yes
Programs/ Supports for Students at Risk Yes
Lead and/or Specialized Teachers with Specialized Skills Yes
Other Specialty Programs (Please Specify)
Does the School have Remedial Programs Onsite During the Day and After School?
No
Does the School have Access to these Programs in Nearby Facilities? Yes
Does the School Location Easily Attract Parent/Family/Community Volunteers?
Yes
Extracurricular Activities and Special Events
School Plays Yes
Dance/Socials Yes
Graduation Celebrations Yes
Athletics Yes
Clubs Yes
Leadership/Student Council Yes
Fundraising Yes
Other (Please Specify) -
Enrolment Information – Previous Five Year Enrolment (As of September 30) by grade
See attached appendix 5H
APPENDIX 5
SCHOOL INFORMATION PROFILE Credit View Public School
December 12, 2016
P a g e 6 | 6
Enrolment Information – Ten Year Enrolment Projections by grade
See attached appendix 5I
OTHER SCHOOL USE PROFILE
Current Non-School Programs or Services at or Co-Located within the School
-
Rent Being Collected -
Operating at Full Cost Recovery -
Community Use of the School (Permits) -
Rent Being Collected -
Operating at Full Cost Recovery -
Before and After School Programs -
Rent Being Collected -
Operating at Full Cost Recovery -
Lease Terms at the School -
Rent Being Collected -
Operating at Full Cost Recovery -
Factors of a Suitable Facility for Community Planning Partnerships
Criteria: Projected 200 or more excess pupil places and/or
60 percent utilization or less for at least two years If the building is being used as a school, there are
excess pupil places available for at least a five year period
The space is not required for other Board programming
Separate access is available or can be created where appropriate
The ability to separate space used by community partners from the space used by students
Suitable parking and access exists Zoning and site use restrictions Facility condition Other criteria as determined by the Board
Does the School Meet the Above Board Criteria? -
Current Community Planning Partnerships -
Rent Being Collected -
Operating at Full Cost Recovery -
Prepared by: Peel District School Board Planning & AccommodationMap data courtesy of the Region of Peel Planning Department, thePeel District School Board Planning Department, the City of Brampton, City of Mississauga and the Town of Caledon.Updated December, 2016
²Credit View P.S. Boundary (Gr. K-8)
"
UV410
OB Railway
FERND ALE
PARK
RD
KIEV
RD
LEMKORD
LOUISEST
BUDAKTL
JOHNST
BUDAKTL
CRED
ITRD
LWIW RD
ZAPOROZE RD
SLOANDR
SIXT
H LI
W
BATURYN RD
ODESSA
BV
MILL ST
HIGHST
MAPLEAV
CASSIDY LN
BRI CKLN
INGL
EVIEW
DR
KENNEDY RD
STATION RD
ISABELLAST
BOSTON MILLS RD
BOSTON MILLS RD
OLDE BASE LINE RD
OLDE BASE LINE RD
KING ST
KING ST
KING ST
CRED
ITVIEW
RD
CRED
ITVIEW
RD
CHIN
GUAC
OUSY
RD
MCLA
UGHL
IN R
DMC
LAUG
HLIN
RD
WIN
STON
CHUR
CHILL
BV
MISS
ISSA
UGA
RDMI
SSIS
SAUG
A RD
OLD SCHOOL RD
OLD SCHOOL RD
SHAW
S CR
EEK
RD
BALLINAFAD RD
HERI
TAGE
RD
WINS
TON
CHUR
CHILL
BV
CHIN
GUAC
OUSY
RD
HERI
TAGE
RD
ROCK
SIDE
RD
CreditView PS
0 1 20.5Kilometres
2016-2017
APPENDIX 5B
Prepared by: Peel District School Board Planning & AccommodationMap data courtesy of the Region of Peel Planning Department, thePeel District School Board Planning Department, the City of Brampton, City of Mississauga and the Town of Caledon.Updated December, 2016
"
KING STMI
SSISS
A UGA
RD
KIEV RD
CreditView PS
0 100 20050Meters
Credit View P.S.Aerial Photograph
²
Property Line
APPENDIX 5C
Prepared by: Peel District School Board Planning & AccommodationMap data courtesy of the Region of Peel Planning Department, thePeel District School Board Planning Department, the City of Brampton, City of Mississauga and the Town of Caledon.Updated December, 2016
"
ENVIRONMENTALPOLICYAREA
ENVIRONMENTALPOLICYAREA
PRIMEAGRICULTURAL
AREA
RURAL AREA
RURAL AREA
RURALAREA
RURALAREA
RURAL AREA
RURAL AREA
RURALAREA
RURAL AREA
EXTRACTIVEINDUSTRIAL AREA
EXTRACTIVEINDUSTRIAL
AREA
OPEN SPACEPOLICYAREA
ENVIRONMENTALPOLICY AREA
ENVIRONMENTALPOLICYAREA
ENVIRONMENTALPOLICYAREA
ENVIRONMENTALPOLICYAREA
ENVIRONMENTALPOLICYAREA
EXTRACTIVEINDUSTRIAL
AREA
PRIMEAGRICULTURAL
AREA
RURAL AREA
OPEN SPACEPOLICY AREA
OPENSPACE
POLICY AREA
OPEN SPACEPOLICY AREA
ODESSA BV
KIEV RDLWIWRD
ZAPOROZE RD
KING ST
MISS
ISSAU
GA R
D
CreditView PS
0 100 20050Meters
Credit View P.S.Land Use Designation Map
²APPENDIX 5D
See following pagefor legend
APPENDIX 5D
Land Use Designations Legend
Land Use Colour Land Use Description General Agricultural Area Prime Agricultural Area Rural Lands Extractive Industrial Area Waste Management Area Open Space Policy Area Environmental Policy Area Estate Residential Area Retirement Community Area Settlement Area
Prepared by: Peel District School Board Planning & AccommodationMap data courtesy of the Region of Peel Planning Department, thePeel District School Board Planning Department, the City of Brampton, City of Mississauga and the Town of Caledon.Updated December, 2016
"
KING STMI
SSISS
AUGA
RD
IEPA2
NEP DevControl
Area
A1
A1
A1
A1
CreditView PS
0 100 20050Meters
Credit View P.S.Zoning Map
²
ZoningBoundary
APPENDIX 5E
See following pagefor legend
APPENDIX 5E
Zoning Map Legend Zoning Category Zones Zoning Description
Residential
RE Estate Residential RR Rural Residential R1 Residential One R2 Residential Two RT Residential Townhouse RMD Mixed Density Residential RM Multiple Residential
Commercial
CC Core Commercial CCV Village Core Commercial C General Commercial CN Neighbourhood Commercial CV Village Commercial CH Highway Commercial CHB Bolton Highway Commercial CHV Village Highway Commercial CT Tourist Camp Commercial
Industrial
MP Prestige Industrial MS Serviced Industrial MU Unserviced Industrial MA Airport Industrial MX Extractive Industrial MD Waste Management Industrial
Institutional I Institutional
Agricultural and Rural
A1 Agricultural A1-ORM Agricultural –Oak Ridges Moraine A2 Rural A2-ORM Rural – Oak Ridges Moraine A3 Small Agricultural Holdings A3-ORM Small Agricultural Holdings – Oak Ridges Moraine
Environmental
EPA1 Environmental Policy Area 1 Zone EPA1-ORM Environmental Policy Area 1 Zone – Oak Ridges Moraine EPA2 Environmental Policy Area 2 Zone EPA2-ORM Environmental Policy Area 1 Zone – Oak Ridges Moraine
Open Space OS Open Space OS-ORM Open Space – Oak Ridges Moraine
Niagara Escarpment NEP NEP Development Control Area
APPENDIX 5F
Credit View Public School
10 Year History of Major Facility Improvements Project Summary Completion Total Cost
Replace Gym Light Fixtures September 3, 2004 $5,983.74Exterior Door Replacement – South Entrances (2) January 1, 2005 $9,323.07Structural – Windows & Doors November 30, 2006 $131,845.56Plumbing – Replacement of Urinals & Fixtures May 28, 2007 $56,911.90Electrical – Interior Lighting in Original Building May 26, 2008 $19,824.00Integrated Digital Telephone / Public Address September 1, 2008 $47,331.67Mechanical – Ventilation Fans April 20, 2009 $17,932.27Structural – Exterior Masonry November 30, 2009 $50,512.41Building Envelope – Roof Replacement October 25, 2010 $255,348.67Energy Efficiency Equipment – Lighting December 5, 2011 $13,545.43Electrical Upgrade Service October 1, 2014 $123,819.75Structural – Floor Slab Repairs October 2014 $26,755.20
TOTAL COST $759,133.67
APPENDIX 5G
Credit View Public School Facility Condition Index (F.C.I.)% 58%
Projected 5 Years Major Facility Improvements
Project Summary Estimated CostFloor Finishes (Ceramic Replacement/Renewal in Original Building) $23,242Floor Finishes (Carpet Replacement/Renewal in Original Building) $22,333Controls & Instrumentation (in Original Building) $14,880Lighting & Branch Wiring (Lighting Equipment in Original Building) $19,316Site Renewal (Parking Lots) $148,845Site Renewal (Playing Fields) $109,994Site Renewal (Landscaping) $37,196Exterior Doors Renewal (in Original Building) $31,200Washroom Accessories (in Original Building) $12,000Fittings (in Original Building) $52,098Repaint Walls (in Original Building) $44,637Floor Finishes (Vinyl Replacement/Renewal in Original Building) $22,360Heat Generating System (Steam, Hot Water & Atmospheric Boilers) $75,200Auxiliary Equipment (Stacks & Breaching) $10,396Heating Water Distribution System (in Original Building) $103,958Terminal & Package Units (Fin Tube Radiation) $84,344Lighting Equipment (Stage Lighting) $10,400Interior Doors Renewal (in Original Building) $70,720Fittings (Millwork Renewal in Original Building) $61,880
ESTIMATED TOTAL COST $954,999
APPENDIX 5H Credit View P.S. Previous 6 Year Enrolment (as of September 30) by grade:
Credit View PS
JK SK Gr. 1 Gr. 2 Gr. 3 Gr. 4 Gr. 5 Gr. 6 Gr. 7 Gr. 8 TOTAL
2010 - 2011 9 12 8 12 11 10 11 19 12 17 121
2011 - 2012 11 9 12 8 14 11 11 14 17 13 120
2012 - 2013 8 13 6 14 9 14 12 12 14 20 122
2013 - 2014 7 9 11 5 16 10 15 13 13 13 112
2014 - 2015 11 9 5 11 5 16 8 13 12 13 103
2015 - 2016 7 10 10 6 10 5 13 7 13 11 92
2016 - 2017(current year)
10 9 7 10 6 9 5 12 2 11 81
APPENDIX 5I Credit View P.S. 10 Year Enrolment Projection by grade:
Credit View PS
JK SK Gr. 1 Gr. 2 Gr. 3 Gr. 4 Gr. 5 Gr. 6 Gr. 7 Gr. 8 TOTAL
2017 - 2018 10 10 8 7 11 6 9 5 12 2 80
2018 - 2019 10 10 10 8 7 11 6 9 5 12 88
2019 - 2020 10 11 10 10 9 7 11 6 9 5 88
2020 - 2021 9 11 10 10 11 9 8 11 6 9 94
2021 - 2022 10 9 10 10 11 11 9 8 11 7 96
2022 - 2023 10 10 10 10 11 11 11 10 8 11 102
2023 - 2024 10 10 10 10 11 11 11 11 10 8 102
2024 - 2025 10 10 10 10 10 11 11 11 11 10 104
2025 - 2026 10 10 10 10 10 10 11 11 11 11 104
2026 - 2027 10 10 10 10 10 10 10 11 11 11 103