facilities management and engineering department (fmed) · •mechanical – air conditioning,...

42
Facilities Management and Engineering Department (FMED)

Upload: others

Post on 11-May-2020

3 views

Category:

Documents


1 download

TRANSCRIPT

Facilities Management and Engineering Department (FMED)

• The FMED is responsible for the general upkeep of the BSP Head Office. Responsible for the operations and maintenance of all mechanical, electrical, electronic, and auxiliary/ accessory equipment systems of the Bank

• Mechanical • Electrical • Electronics • Civil and Sanitary • Building Premises • Warehouse • Administrative Division

Group 1

Group 2

Office of the Director

• Mechanical – Air Conditioning, Genset, Mechanical Equipment.

• Electrical – Power, Lighting, Electrical Equipment

• Electronics – Elevators/Escalators, FDAS, Sound System

• Civil and Sanitary – Architectural, Carpentry, Plumbing

• Building Premises – Janitorial, Landscaping, Pest Control

Responsibility:

Civil and Sanitary

Installation of Fire Sprinkler System in BSP Regional Office

Installation of Fire Sprinkler System in BSP Regional Office

Installation of Fire Sprinkler System in BSP Regional Office

Building Improvement and Moisture Protection Projects

Replacement of Windows at the BSP Head Office

Upgrading of Gates at the BSP BOs/ROs

Upgrading of Gates at the BSP BOs/ROs

Upgrading of Gates at the BSP BOs/ROs

On-going re-painting of Building Facade

Re-painting of Building Facade

Re-painting of Building Facade

RE-WATERPROOFING AT THE BSP REGIONAL OFFICES AND BRANCHES

FLOOD CONTROL SYSTEM

Upgrading of Interior Wall Finishes of Interior

Lobbies at BSP HO

Rehabilitation of Toilets:

• BSP Head Office

• BSP Branch Office

Mechanical

Upgrading of Air Conditioning System at the BSP Head Office and Regional Offices/Branches

• Installation of New Oil-free Chillers

• Installation of Direct Digital Control

• Integration to BACNet System

• Rehabilitation of AHUs

• Installation of Packaged Air

Conditioning Units

Replacement of Old Building Mechanical System Controls and Instrumentation

Upgrading of Air Conditioning System Controls at the BSP Regional Offices

Rehabilitation of Ventilation at the BSP Head Office

Repair of Cooling Towers in BSP Head Office

Electrical

Relocation of Power Center

Relocation of Power Center

Repair of Various Electrical Equipment

- Replacement of electrical panels at EDPC Building

Upgrade of ATS controllers

New Load break Switches for the BSP Head Complex - ongoing preparation

Upgrading of Electrical System of BSP HO

Upgrading of Electrical System of BSP HO

Generators for Regional Offices and Branches

Supply, Delivery and Installation of LED Lamps, Signage and Battery Back-up in BSP Branch Offices

Electronics

Provision of scenic elevator at the Cafetorium Building

Public Address System

Sound System

Automation of escalators at 5-Storey Building

Repair of various Schindler Elevators located at the 5-storey building, EDPC and Multi-

storey Building of the BSP Head Office

Upgrade of car operating panel with PWD features for PE1, PE2 and VIP Elevator of the 5-Storey Building

Operating Expenses

Operation and basic maintenance servicing of the Centralized Air Conditioning System at the BSP Main Complex Regional Offices and Branches

Building Premises Maintenance – Janitorial, Landscaping, and Pest Control. BSP Main Complex Regional Offices and Branches

Preventive Maintenance of Chillers, Elevators, and Escalators.

Warehouse

Building Material in-Stock

• Plumbing • Carpentry • Electrical • Mechanical

THANK YOU!