Ministry of Road and Transport Development ofMongolia FACILITATION MEASURES FOR INTERNATIONAL RAILWAY TRANSPORT, AT RAILWAY BORDER CROSSINGS, AND ON TECHNICAL STANDARDS AND OPERATIONAL PRACTICES ALONG INTERNATIONAL CORRIDOR IN MONGOLIA High Level Expert Group Meeting on Harmonization of Rules and Regulations for Facilitation of International Railway Transport May, 2018 Ankara, Turkey

Upload: others

Post on 11-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

Ministry of Road and Transport Development of Mongolia

FACILITATION MEASURES FOR INTERNATIONAL

RAILWAY TRANSPORT, AT RAILWAY BORDER

CROSSINGS, AND ON TECHNICAL STANDARDS

AND OPERATIONAL PRACTICES ALONGINTERNATIONAL CORRIDOR

IN MONGOLIAHigh Level Expert Group Meeting on

Harmonization of Rules and Regulations for

Facilitation of International Railway Transport

May, 2018 Ankara, Turkey

Page 2: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

General information

Legal framework and technical standards

Operational practice along international corridor

Facilitation measures for international railway transport

Facilitation measures at railway border crossings

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 2

CONTENT

Page 3: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP

I. TRANSPORT SECTOR IN MONGOLIA

Page|33

Transport system in Mongolia

Roadway: 49.2 thousand km

Airway: 46.5 thousand km

Railway: 1.9 thousand km

.

Waterway: 0.1 thousand km

Page 4: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

I. MONGOLIAN RAILWAY CORRIDOR

Naushki -

Sukhbaatar

Total length 1110 km

Zamiin-Ude -Erlian

Line type Single-track

Track

gauge

1520 mm

Carrying

capacity

25 mill. ton per year,

Throughput

capacity

14 couple trains per day

Rolling

stocks

6577 wagons

182 locomotives

Maximum 90 km/hour for passenger train

speed 80km/hour for freight train

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 4

Page 5: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

I. MONGOLIAN RAILWAY CORRIDOR

The shortest railway corridor connecting Asia

and Europe.

Member since 1956.

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 5

Railway corridor №1B

Page 6: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

I. VOLUME OF TRANSPORTED GOODS BY RAILWAY

8.5

2

2.4

7.1

0

5

10

15

20

30

25

2014 2015 2016 2017

Domestic Transit Import Export Remaining potential

22,8

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 6

2013

20,0

Page 7: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

INTERNATIONAL AGREEMENTS TRANSPORT BYRAIL

• Agreement on International Goods Transport by Rail (SMGS);

• Agreement on International Passenger Transport by Rail (SMPS).

BILATERAL AGREEMENTS ON RAILWAYTRANSPORT

• Minutes of the meeting of the Mongolian-Russian Border Railway Commission;

• Minutes of the meeting of the Mongolian-Chinese Border Railway Commission.

INTERNATION RULES FOLLOWED BY MONGOLIANRAILWAY COMPANIES:

• Rules on use of Passenger Coaches - PPW;

• Rules on use of Freight Wagons – PGW;

• International Passenger Tariff – MPT;

• Uniform Transit Tariff – ETT.

KOICA fellowship program – “Global railway expert 2015” midterm course,SEOULTECH university Page 7

III. LEGAL FRAMEWORK AND TECHNICAL STANDARDS

Page 8: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

III. LEGAL FRAMEWORK AND TECHNICAL STANDARDS

NATIONAL RAILWAY LEGAL FRAMEWORK:

• Law on the railway transport of Mongolia 2007;

• Common integrated rules for railway transport /16/;

• State policy on railway transport - 2010.

Railway transport related national technical standards/141/:

• MNS standards-45,

• MNS EN-93 /based on European Standard/,

• MNS GOST R-2 /based on Russian Standard/,

• MNS TB-1 /based on Chinese Standard/;

KOICA fellowship program – “Global railway expert 2015” midterm course,SEOULTECH university Page 8

Page 9: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

III. OPERATIONAL PRACTICE ALONG INTERNATIONAL CORRIDOR

Erlian Zamiin-UdeSukhbaatar Naushki

Gauge: 1,435 mm

China Mongolia Russian

Federation

Gauge: 1,520 mm Gauge: 1,520 mm

Railway crossing points through Trans-Mongolian corridor №1B

1. Railway goods transferred in the receiving border station according to SMGS.

2. Control authorities and other stakeholders at the border stations are the followings:

• General Authority for Border Protection;

• General Department for Citizenship and Migration of Mongolia referred as Immigration of Mongolia;

• General Customs Administration of Mongolia;

• General Agency for Specialized Inspection (GASI).

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 9

Page 10: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

III. OPERATIONAL PRACTICE ALONG INTERNATIONAL CORRIDOR

Naushki Sukhbaatar

Russian federation,

“Russian railways” JSCMongolia,

”Ulaanbaatar railway” JSC

Gauge: 1,520

mm

Mongolian-Russian border crossing points characteristics

✓ Same track gauge, no transshipment;

✓ Locomotives are served one by one between border

stations every year;

✓ 13 pair trains per day, maximum permitted weight of

trains: 6000 tons, maximum length of the train: 71

wagons;

✓ Dynamic weight controlling on both sides;

Technological time of train receiving procedure:

• at the Sukhbaatar station is 2 hours and 55 minutes /175 minutes/ and

• at the Naushki station is 3 hours and 55 minutes /235 minutes/, which takes longer for 1 hour.

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 10

Page 11: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

III. OPERATIONAL PRACTICE ALONG INTERNATIONAL CORRIDOR

Zamiin-

UdeErlian

PRC,

China railway corporation

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 11

Gauge: 1,520

mm

Mongolian-Chinese border crossing points characteristics

t track gauges;

hipment is done on receiving side railway station;

✓ 12 pair trains per day, maximum permitted weight of

trains: 5000 tons, maximum length of the train: 60

wagons;

✓ Grouping the same goods /coal, container, iron ore and

the others/ in a train;

✓ Up to 10 wagon of same goods can be transported by

one transport documentation.

Mongolia,

”Ulaanbaatar railway” JSC

✓ Differen

✓ TranssGauge: 1,435

mm

Page 12: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

KOICA fellowship program – “Global railway expert 2015” midterm course,SEOULTECH university Page 14

IV. FACILITATION MEASURES FOR INTERNATIONAL RAILWAY TRANSPORT

1. BILATERAL AGREEMENTS ON TRANSIT BY RAIL

THE PEOPLE’S REPUBLIC OF CHINA

• Intergovernmental agreement on the access to andfrom the sea and transit transportation throughChinese territory by Mongolia, 2014 – instead of1991;

• General Intergovernmental Agreement on DevelopingCooperation in Railway Transit Transportation, 2014(to be adopted)

RUSSIAN FEDERATION:

• Intergovernmental agreement on the access to andfrom the sea and transit transportation throughRussian Federation territory by Mongolia, 1992;

• Intergovernmental agreement for the transittransportation of goods by railway. Soon will besigned.

Page 13: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

IV. FACILITATION MEASURES FOR INTERNATIONAL RAILWAY

TRANSPORT

tariff (2007):

2. RAILWAY TRANSIT TARIFF RATE

Container transportation15.5 %

tariffs for containersTransshipment (2017): 65.5 %

Differentiation rate system in tariff: basedon volume of transportation per month(2017)

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 13

Page 14: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

V. FACILITATION MEASURES AT RAILWAY BORDER CROSSINGS

RUSSIA to CHINA CHINA to RUSSIA1. Technological time:

• Train receiving procedure time at Zamiin-Udestation was 420 minutes:

• Mongolia introduced parallel technology system:train receiving procedure time reduced by 173minutes (248 minutes).

2. Fast processing of container trains:

• Excluded the locomotive changing procedure forwhole travel;

• Technical maintenance technology is reduced attechnical station from 60-70 minutes to 30-40minutes.

Reducing the travel time: freight transportation 850-950 km per day.

Russia to China: 28 hours, became 27% faster

China to Russia: 31 hours, became 26% faster

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 14

Page 15: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

CONTAINER TRAIN TRAVELLING TIME FROM

RUSSIA TO CHINA, /ROUTE TRAIN/

0

6

12

18

24

30

36

200 400 600 800 1000 1200

Processing of Customs documents

Choir

Ulaanbaatar

28 Hours

км

Border port Sukhbaatar

Border port Zamiin Uud

Border and Customs control

Technical stop

Page 16: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

CONTAINER TRAIN TRAVELLING TIME FROM

CHINA TO RUSSIA, /ROUTE TRAIN/

0

8

16

24

32

40

200 400 600 800 1000 1200

Transshipment and customs and border control

Sainshand

Choir

Ulaanbaatar

31 hours

км

Border port Sukhbaatar

Border port Zamiin Uud

Border and Customs control

Technical stop

Page 17: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

V. FACILITATION MEASURES AT RAILWAY BORDER

CROSSINGS

3. Simplification: Exchange information between railway stakeholders

In 2016, signed contract between Mongolian and Russianrailway authorities for exchange electronic documents byIFTMIN: 14103 documents received, 12591 documents sent.

Phase I:

Beginning stage of paperless procedure for railway transportation: Consignment notes and Transfer lists are exchanged fully Electronic version since May 2017/IFTMIN, IFTSUM/.

E-sign will be available in 2018 between UlaanbaatarRailways and Russian Railways, international and domestictransport documents will be acceptable without collating withpaper documents.

Phase II:

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 17

Page 18: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

EXCHANGE OF IFTMIN

Phase I:

Phase II:

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 18

07/06/2016 – 03/14/2017

Month/Year RJD UBTZ UBTZ RJD

July – 2016 4479

August – 2016 6134

September – 2016 1613

October – 2016 382 4500

November – 2016 440 2691

December – 2016 405 2577

Total 2016 13453 9768

January – 2017 334 2039

February – 2017 316 784

Total 2017 650 2823

2016-2017 14103 12591

RJD53%

UBTZ47%

Total 26694IFTMIN exchange

Page 19: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

V. FACILITATION MEASURES AT RAILWAY BORDER CROSSINGS

4. Simplification: Development of sufficient and efficient capacities for

transshipment: Zamiin-Uud Regional logistic park

Zone-2: 70Т GANTRY CRANE OPERATIONAL AREA

Zone-3: Open Warehouse

Zone-1: 50T CRANE 4 RAILWAY ACROSS

Zone-3

Enclosed Warehouse

Capacity

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 19

5 million ton/year

Investment 71,64 million USD

Operation starts 2018

Page 20: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

1. Lack of available wagons for reloading both on Zamiin-Ude and Erlian

stations.

2. Lack of cooperation between internal and external stakeholders: Electronic

information exchange between railways and control authorities.

3. Long time taken for freight trains to cross the border at the Erlian/Zamiin-

Ude.

4. Lengthy transshipment operations, limited reloading/receiving capacities.

5. Capacity building improvement.

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 20

Challenges:

V. FACILITATION MEASURES AT RAILWAY BORDER

CROSSINGS

Page 21: FACILITATION MEASURES FOR INTERNATIONAL ......I. MONGOLIAN RAILWAYCORRIDOR Naushki - Sukhbaatar Total length 1110 km Zamiin-Ude -Erlian Line type Single-track Track gauge 1520 mm Carrying

THANK YOU FOR YOUR

ATTENTION

Ministry of Road and Transport Development of Mongolia – Regional MeetingUNESCAP Page 21