fabrication and construction of steel structure, pressure

1
8/11/2017 Growth Through Better Services http://www.gsb.co.id/index.php?module=service&pid=3 1/1 Furnace Furnace Growth Through Better Service Fabrication and Construction of Steel Structure, Pressure Vessel, Boiler & Heat Exchanger Bahasa : | Steel Structure Pressure Vessel Special Equipments EPC Projects Other Projects » Special Equipments Kami juga memproduksi Special Equipments sebagai berikut: Hurry Melter Furnace (250 kg - 2.500 kg Kapasitas per jam) Holding Furnace (kapasitas 500 - 3.000 kg) Mesin Pertanian * Klik pada gambar untuk melihat gambar yang lebih besar Friday, August 11, 2017 1:39:17 PM Fasilitas : New Production Machinery Units Shop Drawing Build Up Beam Production Line Machine Tools Sandblasting & Painting Facilities Transportation Vehicle Mobile Cranes Procurement and Warehousing Copyright © 2017 PT. Gerbang Saranabaja Beranda|BeritaTentang Gerbang Saranabaja|Pelayanan|Fasilitas|Proyek|Berita|Kesempatan|Kontak Kami Powered by VanWellis Indonesia -Hurry Melter Furnace ( 250 kg - 2,500 kg kapasitas per jam ) -Holding Furnace ( 500 kg - 3,000 kg kapasitas ) -Layanan Perbaikan Kendaraan -Mesin Pertanian Kami memiliki pengalaman baik di EPC ( Engineering Procurement and Construction ) untuk proyek berikut - LPG Plant Beranda Tentang Kami Fasilitas Proyek Responsibilitas Proses Berita Karir Unduh Video Hubungi Kami

Upload: others

Post on 19-Oct-2021

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fabrication and Construction of Steel Structure, Pressure

8/11/2017 Growth Through Better Services

http://www.gsb.co.id/index.php?module=service&pid=3 1/1

Furnace Furnace

Growth Through Better ServiceFabrication and Construction of Steel Structure, Pressure Vessel, Boiler & Heat Exchanger

Bahasa : |

Steel Structure

Pressure Vessel

Special Equipments

EPC Projects

Other Projects

» Special Equipments

Kami juga memproduksi Special Equipments sebagai berikut: Hurry Melter Furnace (250 kg - 2.500 kg Kapasitas per jam) Holding Furnace (kapasitas 500 - 3.000 kg) Mesin Pertanian

* Klik pada gambar untuk melihat gambar yang lebih besar

Friday, August 11, 2017 1:39:17 PM

Fasilitas :

New Production Machinery Units

Shop Drawing

Build Up Beam Production Line

Machine Tools

Sandblasting & Painting Facilities

Transportation Vehicle

Mobile Cranes

Procurement and Warehousing

Copyright © 2017 PT. Gerbang SaranabajaBeranda|BeritaTentang Gerbang Saranabaja|Pelayanan|Fasilitas|Proyek|Berita|Kesempatan|Kontak Kami

Powered by VanWellis Indonesia

-Hurry Melter Furnace ( 250 kg - 2,500 kgkapasitas per jam )

-Holding Furnace ( 500 kg - 3,000 kgkapasitas )

-Layanan Perbaikan Kendaraan-Mesin Pertanian

Kami memiliki pengalaman baik di EPC (Engineering Procurement and Construction )untuk proyek berikut-LPG Plant