F-595 Chiller contract report

Jose Botelho Direito EN/CV/DC

Thermosyphon cooling workshop §5Thursday, October 20, 2011

Page 2: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 2

Outline• Technical Specifications

• Invitation to Tender

• Chiller Configuration– P&ID– Required services

• Construction Time Schedule

20 October, 2011

Page 3: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 3

Overview of Technical Specifications

• Two stage Chiller with a cooling capacity of 170kW @ -70°C.

• Able to run from 20% to 100% of capacity @ all temperatures set points (from 20 to -70°C).

• Two Operation regimes:– Normal Operation: 170kW @ -70°C;– Warm Operation: 50kW @ -20°C;

• Runs with 1st Stage only (R404a).• Air cooled Condenser (independent of cooling water availability).• 1st Stage connected to Diesel Power network.

20 October, 2011

Page 4: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 4

Invitation to Tender• Market Survey (x64 companies contacted):

– 6x companies were qualified: Angelantoni (it); Cofely Refrigeration (de); GEA Matal / Technofrigo (fr); Johnson Controls (ch); J&E Hall (uk); Telstar (es).

• Invitation to Tender:– 4x Offers received:

• Johnson Controls• Angelantoni• J&E Hall• Telstar

• Best offer from J&E Hall

20 October, 2011

Page 5: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 5

Chiller Configuration• Original required configurations:

– Configuration A: • Three redundant chillers each with a capacity of 50% of total power.

– Configuration B:• One chiller 100% power chiller with redundant compressors + 2 low power chillers

(one of them air cooled).

• Final configuration by J&E Hall:– Two full power chillers (one with air cooled condenser for warm operation).– The two full power chillers cost half the price of any of the original required

configurations.– One chiller has been ordered. The second (redundant) chiller is planned to be

ordered in a later stage of the project.

20 October, 2011

Page 6: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 6

Chiller Configuration

20 October, 2011

Page 7: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 7

Chiller Configuration

• P&IDEDMS 1149580

20 October, 2011

1st Stage R404a

Compressor2nd Stage

R23Compressor

Water cooled Condenser Air cooled Condenser

Warm Operation Brine HX

Normal Operation Brine HX

Page 8: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 8

Chiller Required Services

• Normal Operation (170kW @ -70°C):– Water consumption: 101.4m3/h– Electrical Power consumption (absorbed Power): 314.4kW– Pneumatic air supply (6bar)

• Warm Operation (50kW @ -20°C)– Water consumption: Not required– Electrical Power consumption (absorbed Power): 75.2kW (on Diesel)– Pneumatic Air supply (6bar)

20 October, 2011

Page 9: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 9

Chiller N1 Construction Time Schedule

• Payment plan (total cost = 591,240 CHF):– Contract started: 10%– Design phase completed 20%– Construction of the Chiller 30%– Delivery and Installation at CERN 30%– Commissioning at CERN 10%

• Time Schedule:– Contract started: 10% Completed (September 2011)– Design phase completed 20% Completed (October 2011)– Construction of the Chiller 30% On going (December 2011)– Delivery and Installation at CERN 30% Planned to January 2012– Commissioning at CERN 10% Planned to May-June 2012

20 October, 2011

Page 10: F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Thermosyphon cooling workshop §5 10

• Any questions?

20 October, 2011