exw p006 0000 cs shc mt 00096 method statement for landscaping rev.0

Upload: syed-umair-hashmi

Post on 02-Jun-2018

241 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    1/28

    SINOHYDRO

    GROUP

    Ll

    MITED

    Doha

    Expressway

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    2/28

    SINOHYDRO

    GROUP

    LlMITED

    Doha

    Expressway Package

    6

    East Industrial

    Road

    Interchanges

    at

    Intersection with

    Street 10 and

    Street

    23

    Contract

    No.

    C2011 085

    Submittal Information

    1.

    Document Number

    EXW-P006-0000-CS-SHC-MT-00096

    2.

    Description

    Method Statement for Landscaping

    3.

    Pages

    21

    4.

    Revision

    Rev.O

    5.

    Reference

    Number

    N/A

    6.

    ountry

    of

    Origin

    Qatar

    7.

    Specification

    Ref.

    QCS 2010 Section 28 Part 1

    8.

    Drawing

    Ref.

    ERC1400/D20/LA6 7301 to 7309

    Doha

    - State of Qatar

    Tel:

    974

    6 61 9 . Fax: 974

    44

    6 61 7 .

    \V

    ww.sinohydro.com

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    3/28

    I

    SINOHYDRO GROUP

    Ll

    MITED

    Doha

    Expressway

    (Package

    6

    East

    Industrial

    Road Interchanges

    at Intersection with

    Street 10 and Street 23

    Contract

    No.

    C2011 085

    Index

    1. SCOPE

    2. REREFENCE DOCUMENTS

    3.DRAWINGS

    4. INSPECTION TESTING

    5.

    RESPONSIBI

    Ll

    TIES

    6. RESOURCES

    7. CONSTRUCTION

    METHODOLOGY

    8. PARTICULAR SAFETY PRECAUTIONS

    9. PARTICULAR ENVIRONMENTAL PROTECTION MEASURES

    10. HSE PROCEDURES

    11. QUALlTY ASSURANCE AND QUALl

    TY

    CONTROL

    12. APPENDCES

    12.1

    Job

    Safety Analysis

    12.2 Hazard Risk Assessment

    12.3 Copy of Material Approval

    Doha

    -

    State

    of Qatar

    .

    Tel

    : +97444606109 .

    Fax

    +97444606107 .

    www

    .sinohydro.com

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    4/28

    Doha Expressway Package6)

    Method

    Statement

    for

    Landscaping

    1. SCOPE

    This method statement describes the construction methodology and safety measures for

    Landscaping works. The works related to the Construction of Doha Expressway Package 6 -

    East Industrial Road Interchanges

    t

    Intersections with Street 10 and Street 23.

    Oatar Construction Specification 2010

    2 REFERENCE DOCUMENTS

    2.1 Qatar Construction Specifications 2010

    S e c t i o n 28 Part

    2.2

    HSE

    Plan EXW-P006-0000-HS-SHC-PL-00001 Rev 1

    2.3 Project Quality Plan EXW-P006-0000-QM-SHC-PL-00003

    Rev

    1

    3. DRAWINGS

    3 1 Contract Drawings

    The typical Standard Details Drawings for Landscaping provided with the Contract

    Documents.

    Which are in i u l r E R C 1 4 D 2 A 6 - 7301 to 7309.

    4. INSPECTION TESTING

    AII precast interlock paving block and loose aggregates delivered to site shall conform to the

    Contract Documents Specification requirements.

    AII deliveries must be visually checked for flaws in the production of precast interlock paving

    and loose aggregates.

    In accordance with the Contract Documents and Approved

    Ouality Plan requirements ,

    on satisfactory completion

    of

    the inspection by Supervision Consultants, clearance must be

    obtained for the next activity.

    5. RESPONSIBILITIES

    Project Manager is responsible for ensuring that the work is r m e d in accordance with

    the specifications and within the time and cost constraints. Control and monitor overall

    project activities, including financial , technical , commercial , logistics, mechanical electrical ,

    quality

    ,

    safety health and environmental management functions.

    Construction Manager is responsible for ensuring that the landscaping works are carried

    in accordance with the contract drawings/approved shop drawings ,

    s p e i f i

    t i o n

    EXW-P006

    -0000-CS-SHC-MT-00096 Rev 0

    22 Oct 2012

    Page 1 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    5/28

    m

    - . .

    Doha Expressway Package6) Method

    St

    atement for Landscaping

    equipment and workmanship requirements

    in

    a safer environmen

    t

    He is also responsible for

    ensuring that Site Engineer I Supervisor and workforce are informed and comply with Project

    Quality Plan and HSE Plan requirements for earthworks.

    Site ngineer

    is responsible for the physical execution of landscaping works

    in

    the correct

    location and in a safe and efficient manner in accordance with the contract requirements.

    They are to ensure that the necessary

    QNQ

    documents are completed

    in

    a timely manner.

    They are to ensure that the employees for whom they are responsible carry out the work in

    accordance with this method statemen

    t

    Safety

    ngineer

    ensures that all operations are carried out

    in

    a safe manner and

    in

    accordance with the minimum requirements set out in HSE Safety Regulations for

    Contractors, and the Site Specific Safety Plan. It

    is

    the responsibility of the Safety Engineer

    to ensure that a Permit to Work covers all operations, and he d i r e t l y to the Project

    Manager.

    QAlQC ngineer ensures that all materials , testing and procedure are carried out strictly in

    accordance with the Contract Documents and Quality Plan. He

    Ii

    aises directly with

    the Supervision Consultant authorized site representative to arrange and witness inspections

    and testing. He reports directly to the Project Manager and he should be reporting to the

    corporate Quality Manager.

    Site

    Surveyor is responsible for setting out, monitoring and as built survey data. He is

    responsible for computations, physical work and selection of survey equipment necessary for

    the earthworks

    in

    the correct locations

    on

    the projec

    t

    Foreman

    directly supervises the work activity on the site and has full control over the use of

    the labor, plant and equipmen

    t

    He ensures that the work is carried out in full compliance

    with the specification , and

    in

    a manner that conforms to the safety requirements. He reports

    to the Site Engineer when the work

    is

    complete and ready for inspection.

    6 RESOURCES

    6 1 Manpower

    The estimated manpower

    is

    tabulated below

    which will subject

    to

    adjustment according

    to

    the

    actual requirement during implementations.

    Project Manager - 1

    EXW-P006-0000-CS-SHC-MT-00096 Rev 0

    22 Oct 2012 Page 2 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    6/28

    ...

    Doha Expressway Package6)

    Method Statement for Landscaping

    Construction Manager - 1

    HSE Engineer - 2

    Site Engineer - 2

    Q

    Al

    QC Inspector - 2

    Site Surveyor - 1

    Safety Officer - 2

    Site Foreman - 2

    Skilled worker/trained installer - TBD

    Unskilled worker - TBD

    6.2 Equipment and

    Tools

    6 2 1

    The following

    is

    a list of mechanical equipment

    to

    utilize

    in

    these operations.

    Plate compactor

    Excavator

    Tipper Truck

    WaterTruck

    Hand

    gloves

    and

    safety goggles.

    6.2.2 Upon mobilization of tools and equipment to site

    ,

    inspection will be carried out by

    Contractor inspection where required. Copies of these certificates should be made available

    on site.

    6.3 Materials

    6.3.1 The following materials should be produces to execute the works. AII procured

    materials shall comply with approval material submitta l.

    Precast Block

    Loose Aggregate

    7

    CONSTRUCTION METHODOLOGY

    7.1

    Work Permits

    AII n e e s s

    o r permits shall be obtained prior

    to

    the commencement of any activity

    the site

    ,

    and shall remain valid throughout

    the

    entire duration of the operation.

    Hot / Cold Permit

    to

    Work

    Road

    Closure if applicable)

    AII

    interfacing activities shall be fully coordinated with Supervision Consultan

    t

    For

    emergency response procedures please refer

    to Job

    Safety Analysis

    EXW-P0060000-CS-SHC-MT-00096 Rev 0

    22 Oct 2012

    Page 3

    of

    10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    7/28

    r o u p

    Doha Expressway (Package6)

    Method

    St

    atement for Landscaping

    7 2 Site Planning Preparation

    A clean dry and level area of the site store will

    be

    made available for

    l o a d i n g

    of

    materials.

    of materials shall be suitable size

    ,

    using proper lifting chains/slings.

    Precast block shall be stacked

    ground

    on

    timbers

    ,

    and subsequent bundles if

    placed on top of each other will be similarly separated.

    7 3 Verge Hardscape works

    The surveyor will set the designated line and the grade leve

    l

    The interlocking paving block shall be laid as per standard specification.

    The area shall be excavated to formation level , watered and compacted.

    A laying course of sand 50mm thick shall be placed over the approved surface shall be

    compacted (slightly wetted with water).

    The interlocking paving block shall be laid to the approved

    e r n

    The joints between paving blocks shall be filled with dry jointing sand by spreading it

    over the surface and brushing it into the joints . The dry sand shall be natural and shall

    comply with the standard specifications.

    The block paving shall be vibrated by a plated compactor to ensure that the joints have

    been completely filled.

    7 4 Loose Aggregate

    The surveyor will set the designated line.

    The area shall be excavated to formation leve

    l

    (if required)

    Allloose aggregate sample test result shall

    be

    submitted to the Supervision Consultant

    for approval prior to them being used on site.

    Prior to placing any material on the permanent works area , it shall be ensured with

    subsequent written approval from the Supervision Consultan

    t

    Selected material from stockpile area , or imported material , will be transported to the

    backfilling areas. Loaders with minimum half cubic will place the backfill material

    place in layers according to the specification. Vibrator plates

    ,

    vibrator rollers and

    tampers will be used to compact the backfill materia l

    Filling low-Ievel areas shall be to the level of subgrade as designated. After completion

    clearing and grubbing , the Contractor shall the necessary levelling in order

    to control the thickness of the layers.

    The contractor shall be spreading the loose aggregate as per the contract drawings.

    EXW-P006-0000-CS-SHC-MT-00096

    Rev

    0

    22 Oct 2012

    Page 4 o 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    8/28

    r o u p

    Doha Expressway (Package6)

    Method Statement for

    p

    7 5

    Bare

    ground works

    The surveyor will set the designated line.

    The area shall be excavated to formation leve

    l.

    (if required)

    AII

    sub-grade sample test result shall be submitted to the Supervision Consultant for

    approval prior to them being used on site, and shall comply in all respects with the QCS

    2010 , Section 6 (Roadwork). No material will be used on site prior to receiving the

    above-mentioned approvals.

    Prior to placing any material on the permanent works area , it shall be ensured with

    subsequent written approval from the Supervision Consultant.

    Sub-grade material shall be brought to site directly from the stockpiles in covered truck

    and tipped directly

    on

    to the area

    in

    which the material is to be used.

    Vehicles shall

    be

    entering the areas through designated access points.

    Spreading o the sub-grade material will be done by means of a mechanical grader.

    Sub-grade shall be constructed in layers not exceeding 200 mm compacted

    thicknesses, as detailed in the specification.

    Wherever an overall thickness of sub-grade is greater than 200mm , the material shall

    be placed and compacted in more than one equal layer

    ,

    however

    ,

    in no case shall be

    the layers be less than 75mm thick.

    The prepared sub-grade shall be compacted using by vibrating drum rollers of at least

    15 ton operating weigh t

    Rolling shall be continuous until the entire thickness of each layer in thoroughly

    compacted to an average value of 95 of its MDD.

    Any areas inaccessible by normal compaction equipment such as kerb lines, and

    around gully pots, manholes etc. Shall be compacted by mechanical equipment, i e.

    plate compactor or hand roller.

    Upon completion of the compaction operations ,

    each area/layers shall be submitted

    the Supervision Consultant through an inspection request for his subsequent approval

    8. PARTICULAR SAFETY PRECAUTIONS

    AII

    requirements related to safety including work permits are included

    in

    the Project

    HSE Plan EXW-P006-0000-HS-SHC-PL-00001 Rev. 1

    AII

    key personnel on this section of works are to be experienced

    in

    landscaping works

    and shall be inducted into this method statemen t. Records of attendance at the toolbox

    meeting shall be kept and filed on site.

    Works procedures shall be

    in

    accordance with the HSE risk assessments.

    EXW-P006-0000-CS-SHC-MT-00096 Rev 0

    22 Oct 2012 Page 5 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    9/28

    m i t

    ~ Doha Expressway Package6) Method Statement for Landscaping

    These shall be presented at toolbox meetings prior to commencement of these works

    and then on regular intervals.

    Before commencing any work the safe operation of the related equipment as well as

    safe work method shall be explained to all personnel that are involved at a toolbox

    meeting by the Supervisor Safety responsible for that area. Any new employee shall

    also be inducted into the operating procedures of that area.

    AII plant and equipment are to be inspected and approved as required by the contract

    documents.

    9 PARTICULAR ENVIRONMENTAL PROTECTION MEASURES

    The environmental protection measures relating to landscaping works will be as

    defined

    in

    the Health

    ,

    Safety and Environmental Plan.

    No

    other special environmental

    protection measures need to be considered then to keep the dust control to a level as

    appropriate to the surrounding environment

    10. HSE PROCEDURES

    10 1 In the event of an emergency, the Supervisor in Charge shall act as the Rescue team

    Leader and the following shall be activated:

    10.2

    In

    the event

    o

    fire emergency procedures:

    Warm inform all site personnel about the fire.

    Evacuate them to assembly point and await further instructions.

    If it is safe to do so ,

    to put out a fire with potable fire extinguisher. Attempt

    extinguish only small fires and make sure there is a clear escape path.

    If fire is extinguished and further action is required , then cleaning work can be carried

    If the fire is out of control , call up the Fire Department at 999.

    Provide the following important details:

    1) Location of fire smoke.

    2) Type of fire if known).

    3) When the incident occurred.

    4) Name of caller, location of caller and phone number.

    Provide reasonable assistance to those in need.

    Seek medical assistance for all types of burns and injuries.

    10.3

    In

    the event of an accident occurrence:

    Warm inform all site personnel about the accident

    EXW-P006-0000-CS-SHC-MT-00096 Rev 0

    22 Oct 2012

    Page 6 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    10/28

    Doha Expressway Package6)

    Method Statement for Landscaping

    Stop all site activities surrounding the incident place.

    First aid may be provided to the victim by trained personnel provided consent given by

    victim.

    00

    not attempt to move an injured person unless it is absolutely

    n e c e s s a

    prevent

    further injury.

    00 not allow patient to walk to car or clinic, always have medic male nurse to patient,

    this action may safe life.

    Calmly assure the injured person that assistance help is on the way.

    If patient has stopped breathing it will be necessary to start CPR

    ,

    remember

    S

    R A B.C

    1) S.R.A B.C

    2) S - Safety yours and that of the patient)

    3) R - Response shout at the patient

    ,

    or shake

    ,

    to ascertain level

    of

    consclousness.

    4) A Airway does the patient have airway of yes fine , if no-open airway)

    5) B - Breathing is the patient breathing, if yes fine. If

    NO

    , start mouth to mouth

    resuscitation)

    6) C - Circulation does the patients have a pulse circulation) if yes fine, if NO ,

    start external Cardiac compression CPR)

    Assist emergency personnel in locating the victim and investigating the inciden t

    Provide reasonable assistance to those

    in

    need.

    10

    4

    In

    the event of a hazardous material emergency:

    AII

    chemical spills on site must be reported immediately.

    A hazardous material emergency exists when:

    C l e a n u p

    of a spill of a hazardous material is beyond the level knowledge ,

    training or ability of the staft

    in

    the immediately dangerous to the lives and health

    persons in the area of facility.

    Remove all persons

    in

    immediate danger.

    Evacuate them to assembly point and await further instructions.

    Use eyewash or safety showers as needed to wash

    s p i l l e d chemicals. Flush the

    area with copious amounts of water at least

    15

    minutes.

    Provide reasonable assistance to those in need. Seek medical assistance as required.

    Isolate contaminated persons and do not allow them to leave or spread the

    contamination.

    10 5

    Report of Accident

    Ilncident

    Occupational Oisease

    EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012

    Page 7 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    11/28

    Group

    Li

    mited

    ..., Doha Expressway (Package6) Method Statement for a n d s

    p m g

    AII

    accidents

    ,

    dangerous incidents and occupational disease

    ,

    however minor

    ,

    must be

    reported at once using Safety accident reporting form.

    The immediate supervisor or supervisor's delegate should complete the form and

    forward it to Supervision Consultants HSE Department within 24 hours of the inciden

    t.

    When a victim

    is

    involved , the person completing the form should obtain the victim's

    signature if possible. When no injuries have been sustained , substitute the name of

    victim with the name of the persons most closely involved with the inciden

    t.

    If assistance

    in

    completing the form is required , consult Supervision Consultant HSE

    Departmen t

    Where serious u r i e s or property damage are involved care must be taken to leave

    everything

    as

    it is (unless this creates an unsafe situation by doing so) so tha

    t:

    T h e

    cause of the accident and the extent of the damage incurred may be

    investigated and

    a m a g e d of defective equipment machinery can be retained for inspection by

    insurance adjustors.

    n being notified that an incident has occurs , the Department head will take

    whatever action is necessary to:

    1

    Remove any hazards still present and assist the person(s) involved

    prevent the incident leading to further

    u r y

    2) Meet personnel

    in

    the immediate victim to any dangers

    ,

    which are still

    present

    3) Call for medical assistance.

    4) Notify the HSE Manager.

    5) Arrange to take statements from all witness, including the injured person

    if practica

    l.

    6) Where necessary arrange for relevant documentation to be collected.

    7) Complete the

    report form in conjunction with the injured persons.

    Preliminary Reporting of Injury

    The following incidents shall

    be

    reported immediately to the

    Manager and HSE

    Manager (regardless of time of accidents):

    1) Fatality

    2) Injuries to people comprising of:

    a) Serious bodying injury including;

    Fracture

    of

    skull , spine, pelvis , arm , forearm , tight or leg.

    Dislocation of shoulder

    ,

    elbow

    ,

    hip

    ,

    knee or spine.

    Amputation of any limb, or part of limb.

    EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012 p ge 8 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    12/28

    ... Doha Expressway (Package6) Method Statement for Landscap ing

    Loss of sight of

    an

    eye.

    Should any incident arise which is not clearly defined

    in

    d o u m e the HSE

    Manager should be contacted for advice.

    He shall inform the emergency controller Manager) of the accident

    ,

    Manager's name

    is

    Xian Shijun

    ,

    and mobile number is 66969753.

    I n the absence of the Manager

    ,

    the Construction Manager shall act as the

    Emergency Controller.

    The emergency controller shall alert the emergency response team

    ,

    comprising of first

    aiders to attend the accident when required.

    The emergency controller shall alert the firefighting team should there be a fire.

    The rescue team leader shall alert the emergency controller for additional assistance

    from other rescue team leaders

    The emergency controller shall arrange for t r n s p o a t i o n to send the injured person

    the clinic or hospital if required

    The accident area shall be barricaded and nothing shall be removed from the area.

    A watchman shall

    be

    engaged to protect the area from unauthorized entry

    The emergency controller shall call for a post mortem meeting after the emergency with

    the people involved

    in

    the emergency.

    The

    S H representative shall organize the safety committee to perform a full accident

    investigation. EHS Manager Mr Fang Xinchang

    ,

    and mobile number is 5388562.

    AII information leading to the accident including information , description, photos, time,

    location , sources, witness statements, police and medical reports shall be prepared

    and submitted by the Manager.

    Contact Numbers involved

    Designation

    Mobile#

    in the Work: Name

    Sun Jinhui Director 55854510

    Xian Shijun

    Manager 66969753

    Fang Xinchang

    EHS Manager

    55388562

    Zhang Hong Construction Manager (Bridge) 66122363

    Tong Jianhua

    Construction Manager (Roads) 33141887

    Yang Chun Sheng

    Construction Supervisor 33589831

    Abas

    QC Engineer 55059403

    Cao Xilai

    QC I nspector 66492613

    Kamallmad

    Safety Manager 66879957

    Fasasi

    Safety Engineer 55137219

    EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012 Page 9 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    13/28

    Doha Expressway (Package6)

    Method Statement for Landscapmg

    11.

    U

    Ll

    TY ASSURANCE AND

    U

    Ll

    TY CONTROL

    Landscaping

    ,

    planting and soil preparation shall conform

    to

    the relevant requirements

    of the respective standards

    ,

    unless otherwise directed by the Engineer.

    Landscape work must be undertaken by an experienced Main Contractor or

    Subcontractor specializing in landscape work. Work shall be performed and supervised

    at all times by qualified personne l

    AII

    landscape materials shall be shipped with certificates of inspection as required by

    the Engineer. Manufacturer s certified analysis for standard packaged products shall be

    provided.

    - AII stages of activities shall be checked by the QNQC Engineer prior to the testing by

    the approved Independent Laboratory

    ,

    and the final inspection and approval by the

    Supervision Consultant

    Quality control for the works shall be operated and recorded with project Quality Plan

    EXW-P006-0000-QM-SHC-PL-00003 Rev 1

    12. PPENDICES

    12 1 Job Safety Analysis

    12.2 Hazard Risk Assessment

    12.3 Copy

    of

    Material Approval

    EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012

    Page 10 of 10

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    14/28

    PPENDIX

    Job

    Safety

    nalysis

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    15/28

    Job Safetv nalvsis

    Job:

    project

    Manager: Construction Manager:

    Commencement

    JSA

    for :

    Landscao

    i

    ng

    . Xian Shijun Zhang Hong Date:22 .10.2012

    List of Activity

    Potential Hazards/Risks

    Preventive Measures

    Manpower

    Unfamiliar

    of

    Site Safety Rules

    Managers, Engineers, Supervisors, Foremen and Workers shall

    and Regulations

    undergo safety

    orientation induction

    to be conducted by the ESH S

    Department

    of

    Sinohydro

    as

    per

    requ

    irementsof Qata r Labour Laws and

    in compliance with the approved Proj

    ect Safety

    Panprior to work on site.

    Minimum

    personal protective equipments: helmet

    ,

    safety/reflectorized vest

    ,

    safety shoes

    ,

    su itable oth ing; etc.and

    must be worn at all times when worki ng inside project premises.

    Transport /Equipments

    Mechanical Hazards

    AII

    operators mus t have

    th

    ird part certificate and Qatari Driver s

    cense, registration and plate numbers shall be forwarded to ESH S

    Department for

    the

    issuance of gate pass . No Stickers

    ,

    No Entry

    Policy will be strictl y

    imp

    lemented

    on

    site.

    Heavy equipments shall undergo and pass internal safety inspection

    prior

    to mobilize on site.

    Operators and drivers to conduct regular inspection (walk around

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    16/28

    check

    prior and after operation and

    any

    defects to

    be

    found subject

    Hazards

    for immediately repair.

    Minimum o 30 KPH and maximum o 40 KPH are allowable speed

    limit inside project premises. Over speeding

    on

    site is strictly

    prohibited and violators will be dealt accordingly or subject for

    disciplinary action.

    Turn

    on head

    lights for service vehicles and rotating/revolving for

    heavy equipments while inside project premises and in ongoing

    operations.

    Riding outside service vehcles and heavy equpments while in

    motion is strictly prohibited.

    Rigging failure leading

    to

    material

    Ensure rigging activities

    to

    be carried out by a competent rigger rigger.

    Lifting operation

    falls

    Ensure

    proper

    signals to be given by

    competent rigger

    to the crane

    operator

    Crane

    overloads, failure of lifting

    Periodical inspection of

    lifting tools ackles by

    M

    E

    dept

    /

    third

    party

    tools

    II electronic

    safety devices

    of the crane

    to

    be in working conditions

    Personal

    injury

    by

    falling

    equipment

    Experienced welders

    / gas

    cutters to carry

    out the jobs .

    Electrical failure or o m p r e s s

    Electrical connections

    to be checked before use

    in

    case

    of

    welding

    gas failure

    resulting

    in

    burns

    ,

    Proper

    PPE to

    be wom during activity

    shocks

    Safety

    devices

    like flash back s t o r s

    to

    be fixed

    on

    lines

    Fire extinQuishers to be kept durinQ these activities

    Manual handling

    ,and use

    o

    hand

    tools

    Physical injury

    Assigned workers shall undergo hands on training for safe operating

    power tools

    procedures for hand power tools.

    Appropriate personal protective equipments (safety glass with

    side

    shields or face shields , ear plugs , respirator or dust masks, hand

    gloves, etc.) must be provided and must be worn at all times when

    operating and using

    hand

    power tools.

    Safety: Protecting our Health, Environment, Family and Business

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    17/28

    Excavations

    Struck by Accidents

    Electrocution and Property

    Damage

    Fall

    of equipments

    to

    excavated trench

    Fall of workers

    Safety: Protecting

    our

    Health, Environment, Family and Business

    Equipment working radius area must

    be

    free from any obstruction

    equipment

    ,

    construction materials and workers).

    Spotter

    or

    Flagman

    to be

    designated.

    Accomplished permits

    , underground utilit ies plan electrical ,

    telecommunications and water pipe lines).

    Area shall be properly identified

    with

    markings and safety signs prior

    to digging.

    Equipment must be setting up on stable and level ground and having

    a safe distance from the edge of excavation area.

    Provision of rigid railings

    ,

    concrete barriers

    ,

    plastic barriers

    ,

    safety

    nets

    ,

    directional arrow signs

    ,

    flashing lights and adequate

    informative safety signs in every excavation area.

    Workers are not allowed to stay near the unprotected edge ofthe

    shaft.

    Workers and equipment operator shall be hoisted down only wi th

    man basket

    ,

    which must have third

    e r t i f i t e

    and must be

    inspected and tagged.

    Workers hoisted down using excavator bucket is strictly prohibited.

    Supervisor

    or

    Foreman In-charge

    to

    discuss during ST RRT Card

    Meeti ng and 0sely

    monitor for

    strict compliance.

    Excavated materials shall be stacked away minimum 2-3 meters)

    from the edge of the tren hjpit and immediately shifted

    to

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    18/28

    fall

    of

    materials

    designated area.

    Provision and install ation

    of

    safety barriers surround

    the

    edge

    of the

    shaft

    to

    prevent

    from

    erosion

    of

    loosen materials.

    Backfilled unstable materials on top shall be removed away from the

    edge and properly protected.

    Housekeeping is required before and after working

    Housekeeping

    Slipping /

    tripping

    hazards

    Working

    area

    must

    be free

    of

    any obstructed construction materials

    and safe access

    must

    be clearly

    identified

    .

    Workers to wear

    minimum

    personal protective equipment e.g

    Hand and foot

    injury

    safety hand gloves and safety shoes

    Forms, timbers and ply woods with

    protruding

    nails must be

    properly segregated and isolated.

    II

    rubbish materials must be put on designated trash cans and

    Environmental hazards

    regularly collected on site. Scattered

    of

    any rubbish materials on site

    is strictly prohibited.

    Rubbish materials must be disposed

    off

    to designated garbage

    disposal area.

    Construction Materials

    Hazardous material, inhalation,

    Wear g|oves

    and

    kept

    skicn

    clsov eprerod widhe

    esrefeevty

    r

    preocsasuibtioen

    Too|box

    tab

    skin

    infections Maintain MSDS of chemicals orovide safetv orecautions to workers

    Heat stress

    Proactive measures

    Hot work permit must be issued and signed by HSE department

    before work

    Heat stress checklist must be submitted every day in

    Temperature must be taken every 1

    hour

    Flag

    must

    be installed on site according

    to the

    heat stress table and

    must

    be visible

    to

    all employees.

    Safety: Protecting our Health

    ,

    Environment

    ,

    Family and Business

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    19/28

    Anticipate high heat days on the weather forecast and prepare

    for

    them in proactive measures.

    Begin drinking fluid early in the day

    Waiting until the hottest of the day

    to

    replenish

    Avoid alcohol and caffeine the night before and during the day

    Dress

    for

    conditions, Iightweight, loose 0thing is best, avoid

    layering 0thing underneath coveralls.

    Use sunscreen/ safety eye glasses

    ,

    cover your face and neck from

    the sun .

    Provide shaded areas

    for

    mini breaks and water stations cold

    water).

    Ensure water stations accessible so workers can take frequent

    breaks.

    First aid training to deal with heat stress wi ll be widely given to all

    employees.

    Note

    This Job Safety Analysis Worksheet will discuss to al l Sinohydro personne

    l/

    workers and Subcontractors involved pr i

    or

    to commence in every

    activity on site using Safety Task Analysis Risk Reduction Talk STARRT) Card Form. AII workers and personnel involved must be signed with

    signature affixed after the discussion and copy will be forwarded

    to

    Sinohydro Group HSE Department Office for file.

    Rev iwed by;

    .

    ,

    ,

    U-MHUKH

    i-

    -

    l

    onH

    U

    5

    {

    Safety: Protecting our Health, Environment, Family and Business

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    20/28

    PPENDIXB

    Risk ssessment

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    21/28

    Health and Safety Management System

    Risk Assessment

    Site:

    Doha

    Expressway

    package 6

    Industrial area -Qatar

    Activities

    Potential Hazard Risk Rating

    S

    L

    PR

    Mobilization

    Unfamiliar

    of

    6

    2 2

    ofmanpower

    site safety rules

    and regulations

    Mobilization

    Mechanical

    6

    2

    2

    of equipment,

    hazards

    servlce

    vehicles

    ,

    etc.

    Traffic hazards

    Activity:

    Landscaping

    Category

    H

    H

    Safety: Protecting our Health, Environment, Family and Business

    [ 2 1 1 2 1 2

    Hazard Control Residual Risk

    Emergency Action

    S

    L R

    Managers, Engineers ,

    Supervisors

    ,

    Foremen and

    3 3

    Site emergency response plan

    Workers shall undergo safety

    to be adhered to .

    orientationjinduction to be

    Transportation supervisor

    conducted by the

    ESH S

    responsible to action in the

    Department

    of

    Sinohydro

    as

    per

    case of unwanted even

    t.

    requirements of Qatar Labour

    Laws

    and in compliance with the

    Contact Emergency Dept.

    approved Project Safety

    First Aid

    Planprior to work on site.

    inimum personal protective

    equipment: helmet,

    safetyjreflectorized vest

    ,

    safety shoes

    ,

    suitable clothing;

    etc. and must be worn at all

    times when working inside

    project premises.

    3

    3 Site emergency response plan

    . Copy of Driver s License,

    to

    be adhered to.

    registration and plate

    Transportation supervisor

    numbers shall

    be

    forwarded

    responsible to action in the

    to ESH S Department

    case

    of

    unwanted event.

    assessment. No Stickers, No

    Entry policy will be strictly

    Contact Emergency Dept.

    Page 1

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    22/28

    2

    implemented on site.

    First Aid

    Heavy equipment shall

    undergo and pass internal

    safety inspection prior

    to

    mobilize on site.

    Operators and drivers

    to

    conduct regular inspection

    walk around check) pri or and

    after

    operation and any

    defects

    to

    be found subject

    for

    immediately repair.

    Turn on head lights

    for

    service

    vehicles and

    rotating/revolving

    for

    heavy

    equipment while inside

    project premises and in

    ongoing operations.

    Riding outside service vehicles

    and heavy equipment while in

    motion is strictly prohibited.

    Failure

    of

    Damageto

    6

    2

    2 H

    3

    3

    Site emergency response plan

    lifting

    equipment and

    lllifting equipment is to be

    to be adhered to.

    equipment

    injurv/death to

    certified and inspected

    Transportation supervisor

    personnel regularly

    as

    per

    i

    fting responsible

    to

    action in the

    Regulations.

    case of unwanted event.

    A copy of certification/ third

    Contact Emergency Dept.

    party certificate is

    to

    be

    First Aid

    retained on site

    for

    record

    keeping and reference.

    Safety: Protecting our Health, Environment, Family and Business

    Page 2

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    23/28

    3

    Qualified Singer / Signaller,

    Rigger/Operator to carry out

    visual inspection prior

    to

    use

    Third party certificate

    for

    lifting equipment.

    Tool box talks

    Close Supervision

    Excavation

    6 3

    8

    H

    Equipment working radius

    3

    3

    Site emergency response plan

    Works

    Struck by

    area must

    be

    free from any

    to

    be

    adhered to.

    Accidents

    obstruction equipment,

    Transportation supervisor

    construction materials and

    responsible

    to

    action in the

    workers).

    case

    of unwanted event.

    Spotter

    or

    Flagman to be

    Electrocution

    designated

    Contact Emergency Depart.

    and Property

    First Aid

    Damage

    Accomplished permi ts,

    underground utilities plan

    Fall

    of

    electrical

    ,

    equipment to

    telecommunications and

    excavated

    w ter pipe lines).

    trench

    Area shall be properly

    identified with markings and

    Fall of

    workers

    safety signs pri or

    to

    digging

    Equipment must

    be

    setting up

    Erosion

    or

    fall

    of

    on stable and level ground

    excavated

    and having a safe distance

    materials

    from the edge

    of

    excavation

    area.

    Provision of rigid railings,

    concrete barriers, plastic

    barriers, safety nets,

    . Safety: Protecting our Health, Environment, Family and Business

    Page 3

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    24/28

    4

    directional a rrow signs

    flashing lights and adequate

    informative safety signs in

    every excavation area.

    Workers are

    not

    allowed to

    stay near the unprotected

    edge of

    th

    shaft.

    Workers and equipment

    operator shall be hoisted

    down only with man basket

    and riding standing or a

    worker hoisted down using

    excavator bucket is strictly

    prohibited.

    Supervisor

    or

    Foreman In-

    charge

    to

    discuss during

    ST RRT

    Card

    Meeting and

    closely monitor for strict

    compliance.

    Provision and installation

    of

    safety net surround t he edge

    of the shaft

    to

    prevent from

    erosion of loosen materials.

    Backfilled unstable materials

    on

    top

    shall be removed away

    from t he edge and properly

    protected.

    Manual

    Personnel injuries

    3 6 M

    II

    persons shall

    be

    instructed

    3

    1

    3

    Site emergency response plan

    handling

    on correct manual techniques.

    to

    be

    adhered to.

    Transportation supervisor

    Safety: Protecting our Health Environment Family and Business

    Page 4

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    25/28

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    26/28

    Risk rating score:

    1>4

    5>1

    12>

    L Low risk

    no

    furth r

    action required

    M= Medium risk shall be reduced

    6

    H High risk not acceptable shall be reduced by means of additional controls

    Safety: Protecting our Health Environment Family and Business

    Page 6

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    27/28

    PPENDIXC

    Copy

    of

    Material pproval

  • 8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0

    28/28

    . . ,

    v

    SINOHYDRO GROUP

    LlMITED

    Doha Expressway

    Package

    6

    East Industrial

    Road

    Interchanges

    at

    Intersection

    with Street

    10 and Street

    23

    Contract No. C2011/085

    Document No.

    EXW P006 0

    000-MQ-SHC-MS-00096

    Material

    Submittal for

    Precast

    Concrete

    Paving lock

    for Footway

    and

    ~ d S c p e

    O

    Revlslon

    J R E E I

    l I f 1

    2 ~ u

    24-Jun-12

    I

    Resubmittal

    as

    per Engineer's Representative's Comments

    Date I Reason

    for

    Issue

    Reviewed by

    Contractor Check Llst

    Checked by Approved by

    Consultant Comments

    p p r o v e d

    A P p r

    w C o m m e

    R e s u b m i

    Date

    . V? I

    z..

    Tel

    :

    974 4460.

    6109

    Fax'

    9 7 4 4 4 6 6 1 0 7 .

    wwwslnohydro.com