Extreme Light Infrastructure-Nuclear Physics (ELI-NP) - Phase II
Project co-financed by the European Regional Development Fund through the Competitiveness Operational Programme“Investing in Sustainable Development”
Extreme Light Infrastructure-Nuclear Physics
ELI-NP
ELI – NP Project Implementation Team
www.eli-np.roELI-NP @ FR NuPECC meeting, Oct 14th , 2019
An ESFRI Landmark Project:
ELI–Beamlines, Prague, CZ
ELI–Attosecond, Szeged, HU
ELI–Nuclear Physics, Magurele, RO
The world’s most advanced Laser Research Infrastructure
Extreme Light Infrastructure (ELI)
Gerard Mourou(Nobel 2018)
1024W~ 10% of Sun’s total
power on 1 cm2
ELI
Scientific program
• Nuclear Physics experiments to characterize laser – target int.
• Photonuclear reactions
• Exotic Nuclear Physics and astrophysics
• QED and fundamental physics
• Applied Research
Potential Nuclear Photonics Applications
C. Barty (Lawrence Livermore National Laboratory
Bucharest-Magurele National Physics Institutes
LasersPlasma
OptoelectronicsMaterial Physics
Theoretical PhysicsParticle PhysicsEarth Physics
NUCLEAR
Tandem accelerators
Cyclotrons
γ – Irradiator
Advanced Detectors
Biophysics
Environmental Phys.
Radioisotopes
ELI-NP
ELI-NP
BUCHARESTring rail/road
SMART Facility, SMART BuildingSpecial building and all infrastructures fully operational
10 ha, total built area: 33000 m2
Office BuildingGuest HouseCanteen
HPLS VEGALaboratoriesExperiments
Geotermal System
Antivibration Platform
+310 MEur
Commissioned10 oct
ELI–NP High Power Laser System
Confirmed: May 2018 – 3 PW, 2019:February – 7 PW , March 10 PW
2 x 10 PW = 20 000 000 000 MW =
10% Sun Power on earth
2x 10 PW/min, 2x 1 PW/1 Hz, and 2x 0.1 PW/10 Hz outputs All bottle necks (front-end, pump lasers, large crystals and
gratings) solved Both front-ends + all 48 pump lasers operational 1 PW and 0.1 PW amp operational: 4J/10Hz, 39J/1Hz All vacuum vessels in final position
HPLS commissioned, as scheduled Preparatory:
Maintenance and operation
THALES FRTHALES RO
Laser Beam Transport System
E6-QED
f=30 m sphericalmirror
0.5 GeV proton beam dump
20 GeV electron beam dump
E7-Laser-gamma
E1-Nuclear physics
DM
1 PW auxiliary beam
Cleanroom
10 PW 10 PW
HM
By Thales – December 2017 Starts installing by the end of 2018 LBTS estimated commissioning 2019
Experiments&Labs
Labs operational: Target laboratory Detectors Optics Dosimetry Electronic, Mechanical, HVAC
Interaction Chambers and PW Optics: In manufacturing process, as
scheduled
Provider – Lyncean Technologies Inc.
Signature of the VEGA System Contract
04/10/2019
Electron
Storage Ring
Transport
Modulator/
Klystron
LINAC
Module
Analyzer
Station
Analyzer
Station
Optical Cavity &
Interaction Point
Collimator
Photogun
g-rays
Gamma–rays from
Inverse Compton Scattering
Variable Energy GAmma-ray
(VEGA)
System
fx
Collider Luminosity
Thomson scattering
cross section 10-25 cm2
Main Parameters of VEGA System
→ f : maximize collision frequency – electron storage
ring at high rep rate: f= f0*nb ≈ 35.7 MHz
→ σe,l : control source size – optimize size of e-beam
and laser waist
Preparations for User Access
Lasers System commissioned
•LBTS and Experimental Chambers, on schedule.
•Early experiments at 100 TW will start in Dec. 2019.
•Commissioning experiments were discussed within TDRs
and approved by ISAB.
•Proposals for Day 1 experiments were discussed within
1st Users workshop.
ELI-NP implemented by IFIN-HH – sustainability period according with EC Decision Various experimental set-ups made available to user’ access gradually depending on the readiness Transition period (till steady state): operated by ELI-NP
- service level agreement- access policy governed by ELI-ERIC- gradual integration
Open Access
• Technical and Scientific Description: rump up period 2019-2023, available gradually to the users
VEGA System – by 2022
Intermediate system – DL after 38 months
Full system – DL after 41 months
Experimental Setups on schedule
Human Resources
0
50
100
150
200
250
2011 2012 2013 2014 2015 2016 2017 2018
13
Expected to staff 324 scientists, technicians and
support staff, by 2023
185, Continuous process to hire: Senior
Researchers 41; Assistants Researchers 33;
Engineers, Physicist, Technicians 44; Support 56
Senior Researchers hiring almost to the end
Junior open
Engineers market supply limited
PhD students –for the period working at
ELI-NP, hired Researchers Assistants will benefit of net 1000 Eur/month in addition to
their fellowship
No change of graduate school
Collaboration:
With Doctoral Schools of Politehnica University of Bucharest, University of Bucharest, West University from Timisoara, TU Darmstadt
With more than 60 internationally renowned universities and research institutions
Project co-financed by the European Regional Development Fund through the Competitiveness Operational Programme“Investing in Sustainable Development”
Thank you!