Telephone: 01295 252363 Email: [email protected] Website: www.hawkins-group.co.uk Hawkins Projects Ltd were awarded the project for this prestigious Volvo Truck & Bus facility in Banbury, Oxfordshire. The building was designed by our in house Hawkins design team, working closely with the client and structural engineer to produce drawings in line with the structural requirements. As principal contractor Hawkins Projects were responsible for the full site set up, welfare and health and safety for everyone on site. Work undertaken by Hawkins Projects Ltd included:- Installation of Foundations Drainage installation Design, fabrication and installation of the structural steel frame to BS EN 1090-2 CE marked to execution class 2 Installation of an insulated roofing and cladding system Installation of 3 roller shutter doors, pits and ducts required for the running of the workshop Complete décor and installation of all utilities required for the offices including: open plan office area, 2 meeting rooms, staff canteen, kitchenette and toilet and shower facilities. Client: Cherwell Valley Silos Duration: 16 Weeks Location: Banbury, Oxfordshire Contract Value: £950,000 External Refurbishment Works

Upload: dinhnhi

Post on 26-Sep-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Telephone: 01295 252363

Email: [email protected]

Website: www.hawkins-group.co.uk

Hawkins Projects Ltd were awarded the project for this

prestigious Volvo Truck & Bus facility in Banbury, Oxfordshire.

The building was designed by our in house Hawkins design

team, working closely with the client and structural engineer

to produce drawings in line with the structural requirements.

As principal contractor Hawkins Projects were responsible for

the full site set up, welfare and health and safety for everyone

on site.

Work undertaken by Hawkins Projects Ltd included:-

• Installation of Foundations

• Drainage installation

• Design, fabrication and installation of the structural

steel frame to BS EN 1090-2 CE marked to execution

class 2

• Installation of an insulated roofing and cladding

system

• Installation of 3 roller shutter doors, pits and ducts

required for the running of the workshop

• Complete décor and installation of all utilities

required for the offices including: open plan office

area, 2 meeting rooms, staff canteen, kitchenette and

toilet and shower facilities.

Client: Cherwell Valley Silos

Duration: 16 Weeks

Location: Banbury, Oxfordshire

Contract Value: £950,000