Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And GFSv2 forced with Bias corrected CFSv2 forecasted SST. INITIAL CONDITION 05 June 2013. Working group on Extended Range Prediction Ministry of Earth System Sciences, India. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/1.jpg)
Extended range prediction during 2013 season
Using Ensemble Prediction System based in CFSv2
AndGFSv2 forced with Bias corrected CFSv2 forecasted SST
Working group on Extended Range Prediction Ministry of Earth System Sciences, India
INITIAL CONDITION 05 June 2013
![Page 2: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/2.jpg)
• Ocean and Atmospheric Initial conditions (IC) are obtained from NCEP.
• Technique was developed to perturb ICs to generate 11 members. (Abhilash et al., 2013)
• Model has been integrated for 45 days for each 11 ICs at five day intervals starting from 16th May (Eg: 16May, 21May, 26May, 31May, 05Jun........etc). Climatology has been calculated from 10-year hindcast.
• Bias correction in daily forecasted SST from CFSv2 for each lead time has been done by removing the daily mean bias for corresponding lead time (model climatology-observed climatology) from forecasted daily SST. (Sahai et al., 2013; Abhilash et al., 2013)
Strategy: Ensemble Prediction using CFS/GFSv2 (T126)
![Page 3: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/3.jpg)
FORECAST FROM CFSv2(T126) And
Bias Corrected GFS2(T126) Based on IC 05 June 2013
![Page 4: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/4.jpg)
Daily evolution of rainfall and wind at 850hPaCFS forecast based on IC=05 June 2013
![Page 5: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/5.jpg)
Daily evolution of rainfall and wind at 850hPaGFS forecast forced with bias corrected CFS forecasted SST
based on IC=05 June 2013
![Page 6: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/6.jpg)
Daily evolution of vorticity at 850hPaCFS forecast based on IC=05 June 2013
![Page 7: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/7.jpg)
Daily evolution of vorticity at 850hPaGFS forecast forced with bias corrected CFS forecasted SST
based on IC=05 June 2013
![Page 8: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/8.jpg)
CFS forecast based on IC=05 June 2013
Actual Anomaly
![Page 9: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/9.jpg)
GFSbc forecast based on IC=05 June 2013
Actual Anomaly
![Page 10: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/10.jpg)
CFS-GFSbc Forecast Over Homogenous RegionsMZI, CEI, NEI, NWI & SPI
![Page 11: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/11.jpg)
CFS
![Page 12: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/12.jpg)
GFSbc
![Page 13: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/13.jpg)
CFS GFSbc
MISO monitoring and forecast for next 25 days
![Page 14: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/14.jpg)
Inferences from the present analysis
• The low level cross-equatorial flow has strengthened both in CFSv2 and GFSbc. Both CFSv2 and GFSbc show that rainfall over monsoon zone of India (MZI) would start to intensify from 13th Jun onwards. This intensification of rainfall is likely due to the formation of a system over BOB.
• Monsoon trough would be over MZI around 13th Jun both in CFSv2 and GFSbc.
• CFSv2 indicates rainfall over west coast during P1 (6-10 Jun) and over west coast and MZI during P2 (11-15June), P3( 16-20 Jun) and P4 (21-25Jun). Positive anomalies are seen over west coast and MZI during P2 (11-15 June).
• GFSbc indicates rainfall over west coast during P1 (6-10 Jun); over west coast and MZI during P2 (11-15June), P3( 16-20 Jun) and over west coast and part of north-west India and north-east India during P4 (21-25Jun). Positive anomalies are seen over west coast and MZI during P2 (11-15 June).
![Page 15: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/15.jpg)
• CFSv2 shows the above normal condition over MZI (during P1-P4), CEI (during P1, P2 and P4), NWI (during P2 and P3) and SPI (during P1, P2 and P4). Near normal conditions are seen over CEI (during P3), NEI (during P1-P3), NWI (during P4). Below normal conditions are seen over NEI (during P4), NWI (during P1) and SPI (during P3).
• GFSbc shows the above normal condition over MZI (during P1 and P2), CEI (during P1, P2 and P4), NWI (during P2 and P4) and SPI (during P1 and P3). Near normal conditions are seen over MZI (during P3 and P4), CEI (during P3), NEI (during P1-P4) and NWI (during P3). Below normal conditions are seen over NWI (during P1) and SPI (during P2 and P4).
Inferences from the present analysis
![Page 16: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/16.jpg)
• Real time forecast for MISO shows that fresh evolution of MISO is eminent with a prominent northward propagation from both CFSv2 and GFSbc.
• However GFSbc shows stronger amplitude than that in CFSv2.
Inferences from the present analysis
![Page 17: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/17.jpg)
CFS-GFSbc Forecast VerificationOver Homogenous RegionsMZI, CEI, NEI, NWI & SPI
![Page 18: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/18.jpg)
CFS, CEI
![Page 19: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/19.jpg)
GFSbc , CEI
![Page 20: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/20.jpg)
CFS, MZI
![Page 21: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/21.jpg)
GFSbc , MZI
![Page 22: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/22.jpg)
CFS, NEI
![Page 23: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/23.jpg)
GFSbc , NEI
![Page 24: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/24.jpg)
CFS, NWI
![Page 25: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/25.jpg)
GFSbc , NWI
![Page 26: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/26.jpg)
CFS, SPI
![Page 27: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/27.jpg)
GFSbc , SPI
![Page 28: Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And](https://reader030.vdocuments.mx/reader030/viewer/2022032709/5681323c550346895d98a817/html5/thumbnails/28.jpg)
For 16May IC (OBS is for 20 days only)
For 21May IC (OBS is for 15 days only)
MISO F/C verification