Explora FDG-4 Troubleshooting Chuck Rector August 01, 2011

Upload: crector12

Post on 06-Sep-2014

569 views

Category:

Technology


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Explora power point d

Explora FDG-4 Troubleshooting

Chuck Rector

August 01, 2011

Page 2: Explora power point d

Troubleshooting the two most common faults with the Explora FDG-4 Chemistry Module

Two Most Common Faults:

1. Failed PIT (Reaction Vessel PIT and Trap Column PIT)2. Low Volume Additions (Vacuum Add Water, Vacuum Add ACN, Pump

Add Water)

Definitions:

PIT = Pressure Integrity Test

MVP = Modular Valve Positioner

Page 3: Explora power point d
Page 4: Explora power point d
Page 5: Explora power point d

Plumbing Schematic

Page 6: Explora power point d

Reaction Vessel PIT

Pressure Integrity Test of the Reaction Vessel

-- Pressure the Reaction Vessel and associated tubing with pressurized nitrogen

-- Close nitrogen supply and “isolation valves” and the system must hold pressure (minimum of 30 seconds & >200kPa)

Page 7: Explora power point d

Simplified Plumbing DiagramReaction Vessel PIT

V8

V14

V3V6

V15V16

V7

MVP2 MVP1

N2 In

N2 cross-connect (4-way)

N2 manifold (5-way)

Pressure Transducer

Vent Trap

Reaction Vessel

Dip Tube

CLOSEDOPEN OPEN

CLOSED CLOSED

CLOSEDCLOSED

Page 8: Explora power point d

V8

V14

V3V6

V15V16

V7

MVP2 MVP1

N2 In

N2 cross-connect (4-way)

N2 manifold (5-way)

Pressure Transducer

Vent Trap

Reaction Vessel

Dip Tube

CLOSEDOPEN OPEN

CLOSED CLOSED

CLOSEDCLOSED

Page 9: Explora power point d

V14

V15V16Pressure Transducer

Vent Trap

Reaction Vessel

Dip Tube

CLOSEDOPEN

CLOSED

Check the following:

• N2 supply pressure• Rx Vessel cap, including o-ring & tubing• Vent Trap cap, including o-ring & tubing• Entire path for leaks (snoop)

Page 10: Explora power point d

Pump Addition

-- Micro Pump (Lee Pump) is used to add Kryptofix solution to the Reaction Vessel

-- While the pump itself is only used to add K-222, the other aqueous reagents (H2O and HCl) are added thru the pump (using vacuum system)

-- For this reason, we can check the operation of the Lee Pump using water

-- Additions are checked by taring an empty vessel, performing an add, and weighing the vessel

Page 11: Explora power point d
Page 12: Explora power point d

Reaction Vessel

MVP5 MVP4 MVP6 MVP7

V14

H2O

MVP1

Lee Pump

Page 13: Explora power point d

Low Pump Addition Troubleshooting

--

Page 14: Explora power point d
Page 15: Explora power point d
Page 16: Explora power point d