experience sharing on building and construction of high ... fim foc to semi... · • generation of...

26
Experience sharing on Building and Construction of High-Tech Semiconductor Factory with 3D Facility Information Modeling (FIM) Minfa Lin 04- 23 - 2015

Upload: nguyenliem

Post on 15-Mar-2018

219 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Experience sharing on Building and

Construction of High-Tech

Semiconductor Factory with 3D

Facility Information Modeling (FIM)

Minfa Lin

04- 23 - 2015

Page 2: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Agenda

Semiconductor Industry Background

FIM Consideration and evaluation

Use of 3D FIM in UMC

Page 3: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

聯電未來--- CSR

永續與展望 經濟持續強化本業競爭力、透過發

展新能源事業提供公司長期成長動能,創造股東最大利益。

環保協助客戶產出低環境衝擊之綠色產品;主動因應氣候變遷問題,善盡地球公民責任。

社會扶助弱勢兒童教育、救助弱勢族群及協助災害救助,持續投入公益,帶動社會向善風氣。

3

Page 4: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

以人為本

與社會共榮

與地球共生息

Page 5: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Thanks

for

Your Attention

TEL : 0975-616468

E-mail :[email protected]

Facility Integration

林銘發 (Minfa Lin)

Page 6: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Industry Background What are the problem face by the industry?

According to International Technology Roadmap for Semiconductors

(ITRS) report, semiconductor industry is moving into 18-inch wafer

manufacturing process from 2014 and to start 14nm gate length process in

2017. Construction and setup of the factory is going to shorten to 9

months .

Data Source from : NTU I am Green Fim project

Page 7: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Nanotech

(<100nm)

L W

Channel

Gate oxide

Shrinking Gate Length

Data Source from : NTU I am Green Fim project

Page 8: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Expanding of Wafer Size

Data Source from : NTU I am Green Fim project

Page 9: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

9

Investment of

NT 100 ~ 300 Billion

to Build

a Plant in 9 ~12 month

To speed up the rate of return,

construction of factory and facilities need be shorten

in order to start the production as soon as possible.

Page 10: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Northern Taiwan: Fabs 6A, 8AB-8F, 8S

Southern Taiwan: Fab 12A

Sales/Support Office

Tokyo: UMCJ

Singapore:

Fab 12i

Fab (12 total: 1x6”, 7x8”, 5x12”) R&D

UMC – have setup 12 FAB worldwide

Page 11: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

FIM Consideration and Evaluation

No. Subject Item Conclusion

1 Objective FIM Efficiency Construction to reduce error,

improve quality and reduce cost

2 SW/HW

Selection

Market acceptance/

HW/SW popularity

Bentley BIM、 Autodesk BIM、 Tekla

Arch/Multi-threaded Application

3 User Training Diverse selection of

training courses

With many training unit worldwide

Support short-term on side service

4 Cost SW/HW Manpower

Training

Work around with the limited

resource

5 Hook

Improvement

Internal operation

and coordination

Trial on a project in CUB

6 Top

Management

Support

Leader Attitude and

determination

Provide benchmark Data to confirm

Fully support

Evaluation

Page 12: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Use of 3D FIM in Semiconductor

Benefit of FIM

Results of using of 3D in FAB

FAB FIM Planning to process

Page 13: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

親臨現場、達到有效溝通

FAB makes use of 3D FIM construction life cycle

• Easy to communicate with virtual reality

• Sharing of central database for a project

• Shorten the work schedule for project

• Generation of report at all stage

Benefit of FIM

Data Source from : NTU I am Green Fim project

Page 14: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Results of using of 3D in FAB

Page 15: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

引進 3D 初步成果報告總表

AREA Clash Count 預期 非預期 尚待解決 圖例

RF 160

0

MAU 35 0

TRUSS 10 0

RAP 331 0

SUB-FAB 200 0

VACUUMS Pipe 175 71 104 8=>6

LASER Beam 0 0 0 0

SUMMARY 911 71 104 8

Page 16: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Integrating the FAB and UB Buildings

Page 17: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

典型的半導體廠 PIPE Corridor Integrated

Page 18: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

典型的半導體廠 ELECTRICAL ROOM Integrated

DEMO 1

Page 19: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

FAB FIM Planning to process

PLAN -> DESIGN -> CONSTRUCT -> OPERATION

Data Source from : Autodesk UMC Report

Page 20: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Now the construction is still on going in Tainan

FAB FIM Planning to process DEMO2

DEMO3

DEMO1

DEMO4

Page 21: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

營建工程預防管制措施

預防異常原因,還是降低異常發生的機率

魏文王問名醫扁鵲說:「你們家兄弟三人,都精於醫術,到底哪一位最好呢?」

扁鵲答說:「我長兄治病,是治病於病情發作之前。由於一般人不知道他事先能剷除病因,所以他的名氣無法傳出去,只有我們家的人才知道。我中兄治病,是治病於病情初起之時。一般人以為他只能治輕微的小病,所以他的名氣只及於本鄉里。而我扁鵲治病,是治病於病情嚴重之時。一般人都看到我在經脈上穿針管來放血、在皮膚上敷藥等大手術,所以以為我的醫術高明,名氣因此響遍全國。」

扁鵲總結說:「我家醫術以長兄最好,中兄次之,我最差。」

文王說:「你說得好極了。」

【心得】

事後控制不如事中控制,事中控制不如事前控制,可惜大多數的事業經營者均未能體認到這一點,等到錯誤的決策造成了重大的損失才尋求彌補,有時是亡羊補牢,為時已晚。

你(妳)覺得誰醫術好?

千金難買早知道 - - 故

還是趕緊加入SEMI 推 FIM 好?

Page 22: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

Computer Hardware

As compare to 2004, the computing speed of

computers had increased greatly which is 10

time faster

{ 10 Core-(CPU+VGA) and >32G RAM }

Page 23: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

2D vs. 3D圖

2D 圖面

2D 圖

3D 圖

23

Page 24: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

2

4

典型的半導體廠3D管線圖

• 建築樓面底圖已關閉

Page 25: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project

碰撞檢查

建物/管線 能耗模擬

施工模凝

典型的工廠 BIM的運用範例

Page 26: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project