Experience sharing on Building and
Construction of High-Tech
Semiconductor Factory with 3D
Facility Information Modeling (FIM)
Minfa Lin
04- 23 - 2015
![Page 2: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/2.jpg)
Agenda
Semiconductor Industry Background
FIM Consideration and evaluation
Use of 3D FIM in UMC
![Page 3: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/3.jpg)
聯電未來--- CSR
永續與展望 經濟持續強化本業競爭力、透過發
展新能源事業提供公司長期成長動能,創造股東最大利益。
環保協助客戶產出低環境衝擊之綠色產品;主動因應氣候變遷問題,善盡地球公民責任。
社會扶助弱勢兒童教育、救助弱勢族群及協助災害救助,持續投入公益,帶動社會向善風氣。
3
![Page 4: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/4.jpg)
以人為本
與社會共榮
與地球共生息
![Page 5: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/5.jpg)
Thanks
for
Your Attention
TEL : 0975-616468
E-mail :[email protected]
Facility Integration
林銘發 (Minfa Lin)
![Page 6: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/6.jpg)
Industry Background What are the problem face by the industry?
According to International Technology Roadmap for Semiconductors
(ITRS) report, semiconductor industry is moving into 18-inch wafer
manufacturing process from 2014 and to start 14nm gate length process in
2017. Construction and setup of the factory is going to shorten to 9
months .
Data Source from : NTU I am Green Fim project
![Page 7: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/7.jpg)
Nanotech
(<100nm)
L W
Channel
Gate oxide
Shrinking Gate Length
Data Source from : NTU I am Green Fim project
![Page 8: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/8.jpg)
Expanding of Wafer Size
Data Source from : NTU I am Green Fim project
![Page 9: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/9.jpg)
9
Investment of
NT 100 ~ 300 Billion
to Build
a Plant in 9 ~12 month
To speed up the rate of return,
construction of factory and facilities need be shorten
in order to start the production as soon as possible.
![Page 10: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/10.jpg)
Northern Taiwan: Fabs 6A, 8AB-8F, 8S
Southern Taiwan: Fab 12A
Sales/Support Office
Tokyo: UMCJ
Singapore:
Fab 12i
Fab (12 total: 1x6”, 7x8”, 5x12”) R&D
UMC – have setup 12 FAB worldwide
![Page 11: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/11.jpg)
FIM Consideration and Evaluation
No. Subject Item Conclusion
1 Objective FIM Efficiency Construction to reduce error,
improve quality and reduce cost
2 SW/HW
Selection
Market acceptance/
HW/SW popularity
Bentley BIM、 Autodesk BIM、 Tekla
Arch/Multi-threaded Application
3 User Training Diverse selection of
training courses
With many training unit worldwide
Support short-term on side service
4 Cost SW/HW Manpower
Training
Work around with the limited
resource
5 Hook
Improvement
Internal operation
and coordination
Trial on a project in CUB
6 Top
Management
Support
Leader Attitude and
determination
Provide benchmark Data to confirm
Fully support
Evaluation
![Page 12: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/12.jpg)
Use of 3D FIM in Semiconductor
Benefit of FIM
Results of using of 3D in FAB
FAB FIM Planning to process
![Page 13: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/13.jpg)
親臨現場、達到有效溝通
FAB makes use of 3D FIM construction life cycle
• Easy to communicate with virtual reality
• Sharing of central database for a project
• Shorten the work schedule for project
• Generation of report at all stage
Benefit of FIM
Data Source from : NTU I am Green Fim project
![Page 14: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/14.jpg)
Results of using of 3D in FAB
![Page 15: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/15.jpg)
引進 3D 初步成果報告總表
AREA Clash Count 預期 非預期 尚待解決 圖例
RF 160
0
MAU 35 0
TRUSS 10 0
RAP 331 0
SUB-FAB 200 0
VACUUMS Pipe 175 71 104 8=>6
LASER Beam 0 0 0 0
SUMMARY 911 71 104 8
![Page 16: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/16.jpg)
Integrating the FAB and UB Buildings
![Page 17: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/17.jpg)
典型的半導體廠 PIPE Corridor Integrated
![Page 19: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/19.jpg)
FAB FIM Planning to process
PLAN -> DESIGN -> CONSTRUCT -> OPERATION
Data Source from : Autodesk UMC Report
![Page 20: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/20.jpg)
Now the construction is still on going in Tainan
FAB FIM Planning to process DEMO2
DEMO3
DEMO1
DEMO4
![Page 21: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/21.jpg)
營建工程預防管制措施
預防異常原因,還是降低異常發生的機率
魏文王問名醫扁鵲說:「你們家兄弟三人,都精於醫術,到底哪一位最好呢?」
扁鵲答說:「我長兄治病,是治病於病情發作之前。由於一般人不知道他事先能剷除病因,所以他的名氣無法傳出去,只有我們家的人才知道。我中兄治病,是治病於病情初起之時。一般人以為他只能治輕微的小病,所以他的名氣只及於本鄉里。而我扁鵲治病,是治病於病情嚴重之時。一般人都看到我在經脈上穿針管來放血、在皮膚上敷藥等大手術,所以以為我的醫術高明,名氣因此響遍全國。」
扁鵲總結說:「我家醫術以長兄最好,中兄次之,我最差。」
文王說:「你說得好極了。」
【心得】
事後控制不如事中控制,事中控制不如事前控制,可惜大多數的事業經營者均未能體認到這一點,等到錯誤的決策造成了重大的損失才尋求彌補,有時是亡羊補牢,為時已晚。
你(妳)覺得誰醫術好?
千金難買早知道 - - 故
還是趕緊加入SEMI 推 FIM 好?
![Page 22: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/22.jpg)
Computer Hardware
As compare to 2004, the computing speed of
computers had increased greatly which is 10
time faster
{ 10 Core-(CPU+VGA) and >32G RAM }
![Page 23: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/23.jpg)
2D vs. 3D圖
2D 圖面
2D 圖
3D 圖
23
![Page 24: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/24.jpg)
2
4
典型的半導體廠3D管線圖
• 建築樓面底圖已關閉
![Page 25: Experience sharing on Building and Construction of High ... FIM FOC to SEMI... · • Generation of report at all stage Benefit of FIM Data Source from : NTU I am Green Fim project](https://reader031.vdocuments.mx/reader031/viewer/2022030422/5aaa46357f8b9a9a188df9c6/html5/thumbnails/25.jpg)
碰撞檢查
建物/管線 能耗模擬
施工模凝
典型的工廠 BIM的運用範例