existing bicycle network

1
Existing On Road Bike Lane Climbing Lane Sharrow Sharrow One Way Wide Curb Lane Existing Off Road Connector Path Shared Use Path Railroads Parks Rivers/Streams University/College Neighborhood Business District Cincinnati City Limits Cincinnati Bicycle Transportation Program ELM ST PLUM ST W 2ND ST W 3RD ST E 5TH ST W 9TH ST E 2ND ST W 5TH ST EGGLESTON AV MEHRING WY E PETE ROSE WY BROADWAY RACE ST E MEHRING WY Bailey Bridge John Roebling Bridge E 4TH ST E 6TH ST E 3RD ST E COURT ST E 8TH ST JOE NUXHALL WY W 7TH ST E CENTRAL PKWY GARFIELD PL § ¨ ¦ 71 § ¨ ¦ 4 Taylor-Southgate Bridge Purple People Bridge Existing Bicycle Network ° September 2012 Facility Existing Miles Bike Lanes 9.67 Climbing Lanes 0.80 Sharrows 4.09 Sharrow one Way 1.08 Wide Curb 4.25 Shared Path 20.91 Connector Path 0.26

Upload: jordan-kellogg

Post on 18-Mar-2016

226 views

Category:

Documents


1 download

DESCRIPTION

Existing bicycle network

TRANSCRIPT

Page 1: Existing bicycle network

Existing On RoadBike LaneClimbing LaneSharrowSharrow One WayWide Curb Lane

Existing Off RoadConnector PathShared Use Path

RailroadsParksRivers/StreamsUniversity/CollegeNeighborhood Business DistrictCincinnati City Limits

Cincinnati Bicycle Transportation Program

ELM ST

PLUM ST

W 2ND STW 3RD ST

E 5TH ST

W 9TH ST

E 2ND ST

W 5TH ST

EGGLESTON AV

MEHRING WY

E PETE ROSE WY

BROADWAY

RACE ST E MEHRING WY

Bailey Bridge

John Roebling Bridge

E 4TH ST

E 6TH ST

E 3RD ST

E COURT ST

E 8TH ST

JOE NUXHALL WY

W 7TH ST

E CENTRAL PKWY

GARFIELD PL

§̈¦71

§̈¦471

Taylor-Southgate

Bridge

Purple People

Bridge

Existing Bicycle Network

°

September 2012

Facility Existing MilesBike Lanes 9.67Climbing Lanes 0.80Sharrows 4.09Sharrow one Way 1.08Wide Curb 4.25Shared Path 20.91Connector Path 0.26