Page 1: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Excavator X63 Verification

Page 2: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

• This Webinar is LISTEN only

Questions will be answered in writing at the end of the

Webinar.

QUESTIONS?

Page 3: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Last Week Webinar Update

Correction on installation informationNo software termination for bucket sensorHardware termination on bucket sensorCAN filter for GX60

7010-0916

Bucket Termination

CAN Isolator

Page 4: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Reference Material

7010-0697 Excel Verification

Page 5: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Excavator X63 VerificationWebinar September 11th, 2009

• Verification Excel Work Sheets

•TS-1 Calibration Verification

• MC-A1 Position Verification

Page 6: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Excel Verification Work Sheet

Page 7: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verification

No Verification(Rotation error)

Graphics only

Not critical

Page 8: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Start 3DMC and enter simulation mode.

TS-1 Calibration and Implement Length Verification

Page 9: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

TS-1 Calibration and Implement Length Verification

In Simulation

Set Level String

Match Elevation

Page 10: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Antenna Measurements (using GPS)

Compare GPS measured distance to the physical measured distance to adjust Main/Aux Antenna position

RTK Solution (Single point localization )

Planner Surface

Rover with Pocket 3D

Page 11: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Main Antenna to Boom Length

Position the machine directly North

Mark bucket location and record Northing value

Rotate 180o

Position the machine directly North

Mark bucket location and record Northing value

Page 12: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Main Antenna to Boom Length

Subtract the two Northing values to get a GPS distance•15.50’

Using a tape or Rover measure the actual distance•15.30’

Subtract the two values and divide by 2•(15.50-15.30 = .20)/2 = .10

If the GPS measured(Northing) value is larger shorten the length in 3D-MCIf the tape measured value is larger lengthen the length in 3D-MC

Page 13: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Excel Verifying Main Antenna to Boom Length

Page 14: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Aux Antenna to Boom Length

Rotational Heading

Page 15: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Aux Antenna to Boom Length

Position the machine directly North

Curl the bucket in and record:•3DMC Easting of a bucket corner (position screen)•Easting with Rover and Pocket 3D

Extend the bucket to its fullest and record:•3DMC Easting of the same corner (position screen)•Easting with Rover and Pocket 3D

Page 16: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Aux Antenna to Boom Length

Curled bucket Easting:•3DMC 520.35•Rover 520.38

Extended bucket Easting:•3DMC 520.36•Rover 520.51

The difference in curled position•520.38 - 520.35 = .03

The difference in extended position•520.51 – 520.36 = .15

Measured distance from curled to extended•20’

Page 17: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Aux Antenna to Boom Length

Determine the Aux antenna correction amount using this formula:

A(Distance Between Antennas) C(Ext Easting – D (Curl Easting) X B (Curl To Ext Distance)

=

7.5 .15 - .03 X 20

= X=.045

Rover Easting's larger (decrease)3DMC Easting’s larger (Increase)

Curled bucket Easting:•3DMC 520.35•Rover 520.38

Extended bucket Easting:•3DMC 520.36•Rover 520.51

Page 18: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Excel Verifying Aux Antenna to Boom Length

Page 19: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Main Antenna Offset

Position the machine directly North

Curl the bucket in and record:•3DMC Easting of a bucket corner (position screen)•Easting with Rover and Pocket 3D

Extend the bucket to its fullest and record:•3DMC Easting of the same bucket corner (position screen)•Easting with Rover and Pocket 3D

Page 20: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Main Antenna Offset

Curled bucket Easting:•3DMC 520.35•Rover 520.38

Extended bucket Easting:•3DMC 520.48•Rover 520.51

The difference in curled position•520.38 - 520.35 = .03

The difference in extended position•520.51 – 520.48 = .03

If Rover Easting's are larger (increase)

If 3DMC Easting’s are larger (decrease)

Page 21: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Excel Verifying Main Antenna Offset

Page 22: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Verifying Main Antenna Height

•If 3DMC elevations are higher than the rover increase the antenna height•If 3DMC elevations are lower than the rover decrease the antenna height.

Record several 3DMC bucket elevations and corresponding survey rover elevations

Subtract the elevations and find the average

Page 23: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Excel Verifying Main Antenna Height

Page 24: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Testing Machine Sensors for Accuracy

Page 25: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Elevation/Position Errors

Wedge errors or Inconsistent elevation errorsPerform Elevation Accuracy Verification to check machine and sensor calibration

Overall bias between machine and roverPerform Main Antenna Height Verification

Northing Errors:Perform Main Antenna to Boom Length Verification

Rotational Errors: (curled to extended)Perform Aux Antenna to Boom Length Verification

Easting Errors:Perform Main Antenna Offset Verification

Page 26: Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

• Address to download all TU-Live Webinars: ftp://TUlive+topconuniversity.com:[email protected]/

– Recorded Webinar– PP Presentation; Introduction to Paver System

Five– Webinar Q & A

• Additional requests for TU staff:

Email: [email protected]

Questions?