EXCAVATION SUPPORT | TIEBACKS | SOIL NAILING SHOTCRETE | SOLDIER PILES & LAGGING Project Report THREE BALLPARK CENTER - ATLANTA, GEORGIA Owner: Braves Development Company General Contractor: Brasfield & Gorrie, LLC Design/Build Specialty Contractor: Schnabel Geostructural Design & Construction For more informaon on this project or any other of our projects please contact Schnabel at: (703) 742-0020 or visit our website at www.schnabel.com The Three Ballpark Center project is a 13-Story above ground office complex, with 3 below ground parking levels. To allow for excavaon of the below ground parking levels, Schnabel designed and constructed a temporary soil nail wall, and both temporary and permanent eback walls. The temporary soil nail wall consisted of drilled and grouted bars and a temporary reinforced shotcrete facing. The eback walls were installed by first drilling and seng soldier piles to their design toe depth. Timber lagging was then installed to support the soil between the soldier piles. At the temporary walls, temporary ebacks were installed through temporary steel wales. At the permanent walls, double corrosion ebacks were installed through the soldier piles. The ebacks had to navigate through a network of proposed and exisng ulies. A permanent reinforced shotcrete facing was installed on the face of the permanent eback wall. The permanent wall also had be designed to support surcharge loading from an adjacent above ground pedestrian bridge.

Upload: others

Post on 27-Dec-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXCAVATION SUPPORT | TIEBACKS | SOIL NAILING SHOTCRETE

EXCAVATION SUPPORT | TIEBACKS | SOIL NAILING SHOTCRETE | SOLDIER PILES & LAGGING

Project Report

THREE BALLPARK CENTER - ATLANTA, GEORGIA

Owner: Braves Development Company General Contractor: Brasfield & Gorrie, LLCDesign/Build Specialty Contractor:Schnabel Geostructural Design & Construction

For more information on this project or any other of our projectsplease contact Schnabel at:

(703) 742-0020 or visit our website at www.schnabel.com

The Three Ballpark Center project is a 13-Story above ground office complex, with 3 below ground parking levels. To allow for excavation of the below ground parking levels, Schnabel designed and constructed a temporary soil nail wall, and both temporary and permanent tieback walls. The temporary soil nail wall consisted of drilled and grouted bars and a temporary reinforced shotcrete facing. The tieback walls were installed by first drilling and setting soldier piles to their design toe depth. Timber lagging was then installed to support the soil between the soldier piles. At the temporary walls, temporary tiebacks were installed through temporary steel wales. At the permanent walls, double corrosion tiebacks were installed through the soldier piles. The tiebacks had to navigate through a network of proposed and existing utilities. A permanent reinforced shotcrete facing was installed on the face of the permanent tieback wall. The permanent wall also had be designed to support surcharge loading from an adjacent above ground pedestrian bridge.