ewr p1- integral bridges package

2
Package Langford Lane Highway Structures (Gagle Brook Bridge and Roman Town Bridge) College Farm Highway Structures (Langford Brook South bridge and Merton Ditch Bridge) Brookfurlong Farm Bridge Scope of Work 3D grillage modelling in LUSAS including Sub structure (Piles/ Pad foundation) Loads calculation as per Euro codes (including thermal, earth pressure based on K* coefficient subject to strain ratcheting as per PD 6694-1:2011, vehicle loads, creep and shrinkage) Analysing piled foundation by Equivalent Cantilever method (using flexibility matrix provided by Geotechnical team) Pre-tensioned beam design Structural elements capacity check as per Eurocodes Checking of F003 drawings (GA, Layout and RC drawings) Checking of Materials and Workmanship specification Form F003 document including Design Risk assessment BLR Team Somnath Chakraborty Sadheesh Sekar Suprabhat Jakati Somnath Chakraborty Sadheesh Sekar Suprabhat Jakati Bodhi Rudra Somnath Chakraborty Sadheesh Sekar Bodhi Rudra UK Team David Steer Xiao Zhang Cherrine Kong Philip Liew David Steer Xiao Zhang Sebastian Lewandowski Nick Gorst David Steer Sebastian Lewandowski George Symons Nick Gorst UK Feedback- Overall Rating 4.5/5 5/5 5/5 EWR-P1- Integral Bridges Independent Category II Check

Upload: somnath-chakraborty

Post on 13-Sep-2015

230 views

Category:

Documents


0 download

TRANSCRIPT

PackageLangford Lane Highway Structures (Gagle Brook Bridge and Roman Town Bridge)College Farm Highway Structures (Langford Brook South bridge and Merton Ditch Bridge)Brookfurlong Farm Bridge

Scope of Work 3D grillage modelling in LUSAS including Sub structure (Piles/ Pad foundation) Loads calculation as per Euro codes (including thermal, earth pressure based on K* coefficient subject to strain ratcheting as per PD 6694-1:2011, vehicle loads, creep and shrinkage) Analysing piled foundation by Equivalent Cantilever method (using flexibility matrix provided by Geotechnical team) Pre-tensioned beam design Structural elements capacity check as per Eurocodes Checking of F003 drawings (GA, Layout and RC drawings) Checking of Materials and Workmanship specification Form F003 document including Design Risk assessment

BLR TeamSomnath ChakrabortySadheesh SekarSuprabhat JakatiSomnath ChakrabortySadheesh SekarSuprabhat JakatiBodhi RudraSomnath ChakrabortySadheesh SekarBodhi Rudra

UK TeamDavid SteerXiao ZhangCherrine KongPhilip LiewDavid SteerXiao ZhangSebastian LewandowskiNick Gorst

David SteerSebastian LewandowskiGeorge SymonsNick Gorst

UK Feedback-Overall Rating4.5/55/55/5

EWR-P1- Integral Bridges Independent Category II Check

Xiao Zhang