2
Computer Subsystems
• e2e
• Monitor and Control
• Correlator
![Page 3: EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11](https://reader036.vdocuments.mx/reader036/viewer/2022082612/56649e6a5503460f94b67ea4/html5/thumbnails/3.jpg)
3 EVLA Advisory Committee2002 June 10-11
Gareth Hunt
Proposal Preparation and
SubmissionObservation Preparation
ObservationScheduling
Monitor and Control System
Antenna Feed Receiver IF System
Local Oscillator
Fiber Optics Transmission
System
Correlator
Image PipelineData Archive Data Post-Processing
Figure 3.1. Principal EVLA Subsystems
NRAO Data Management Group (e2e project)
Canadian Partner
EVLA Project
Primary data flow
Control and monitor flow
![Page 4: EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11](https://reader036.vdocuments.mx/reader036/viewer/2022082612/56649e6a5503460f94b67ea4/html5/thumbnails/4.jpg)
4 EVLA Advisory Committee2002 June 10-11
Gareth Hunt
Barry Clark’sView
![Page 5: EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11](https://reader036.vdocuments.mx/reader036/viewer/2022082612/56649e6a5503460f94b67ea4/html5/thumbnails/5.jpg)
Gareth Hunt EVLA Advisory Committee2002 June 10-11
5
Progress summaryM&C
• M&C has critical deadlines to meet in 2003– First antenna outfitting in April 2003
• The major effort has been to specify and acquire a M&C Interface Board (MIB) for the antennas
• The RFI requirements of the MIB have placed very tight constraints on the options– Presently one chip and one RTOS
• Limited success in hiring has placed a huge burden on the staff
![Page 6: EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11](https://reader036.vdocuments.mx/reader036/viewer/2022082612/56649e6a5503460f94b67ea4/html5/thumbnails/6.jpg)
Gareth Hunt EVLA Advisory Committee2002 June 10-11
6
Progress summaryM&C (Good News)
• The antenna MIB chip has been selected– Several chips delivered– A prototype board has been assembled
• The RTOS order was placed last week
• One position filled– One other offer made
![Page 7: EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11](https://reader036.vdocuments.mx/reader036/viewer/2022082612/56649e6a5503460f94b67ea4/html5/thumbnails/7.jpg)
Gareth Hunt EVLA Advisory Committee2002 June 10-11
7
Progress summaryM&C (Bad News)
• Overall design not yet in place• Detailed plan for test antenna software not yet
available• Strategy for operating three antennas in 2004 not
developed– Need to look at other Telescope control systems
• Three positions still unfilled– Four offers declined
![Page 8: EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11](https://reader036.vdocuments.mx/reader036/viewer/2022082612/56649e6a5503460f94b67ea4/html5/thumbnails/8.jpg)
Gareth Hunt EVLA Advisory Committee2002 June 10-11
8
Correlator
• MIB– Less stringent RFI requirements – in a screened
room– Will probably use a more standard chip and
real-time Linux for MIB
• Initial design documents for back-end data processing are complete
• NRAO computer staffing complete
![Page 9: EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11](https://reader036.vdocuments.mx/reader036/viewer/2022082612/56649e6a5503460f94b67ea4/html5/thumbnails/9.jpg)
Gareth Hunt EVLA Advisory Committee2002 June 10-11
9
e2e
• Test data archive (Storage Area Network) installed
• Prototype pipeline tested• PDR for EVLA is July 18-19, 2002• One position filled• One offer declined• Two other offers (NVO, ALMA) accepted