Evergreen Trails Master Plan!
Community Mee,ng #1 May 20, 2014
Today’s Mee,ng
• Introduc,ons • Study Area • Project Overview • Project Schedule • Opportuni,es and Priori,es • Next Steps
Project Partners • Great Outdoors Colorado Grant Funding • Downtown Evergreen Economic District • Jefferson County Transporta,on and Engineering
• Jefferson County Planning and Zoning • Jefferson County Open Space • Jefferson County Public Health • Evergreen Parks and Recrea,on District • Denver Mountain Parks
Project Team • Dean Dalvit, PE, AIA (DEED)-‐ Client Project Manager • Chris Vogelsang, PE-‐ Consultant Project Manager • Beth Vogelsang, AICP-‐ Planning and Community
Engagement • Mark Kopatz, RLA, ASLA-‐ Wayfinding and Trail Design • Will Kerns, AICP-‐ Planning and Mapping
Study Area
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Evergreen Trails Master Plan - Study Area
Meadow Dr.
Upper Bear Creek Rd.
Buffalo Park Rd.
Little Cub Creek Rd.
7474
73
Legend
Study Area Boundary
S. B
lue
Spru
ce R
d.
Downtown Evergreen
EvergreenHigh School
WulfRec Center
WilmotElementary
School
EvergreenPublic Library
EvergreenLakehouse
Hiwan Homestead
Museum
EvergreenGolf Course
Created: 5/15/2014Draft
GroceryStore
Brook Forest Rd.
0 0.2 0.4 0.6 0.80.1
MilesI
Project Overview
Exis,ng Plans and Studies – Evergreen Park and Recrea,on District Master Plan
(December 2011)
– Jefferson County Open Space Master Plan (April 2014)
– Evergreen Area Community Plan (November 2005 – currently being updated)
– Evergreen Area Community Plan Design Guidelines (October 2005)
– Jefferson County Bicycle and Pedestrian Master Plan (June 2012)
– Evergreen Area Trail Conceptual Alignment (April 2012)
– Proposed Evergreen Area addi,ons to Jefferson County Bicycle and Pedestrian Plan Maps
– Genesee Park and Trail Improvement Plan (2013)
– Denver Mountain Parks Master Plan (2008)
Project Goals
• Build on Exis,ng Studies and Concepts • Improve Safety and Connec,vity • Link Key Des,na,ons • Leverage Exis,ng Trail/Transporta,on System • Focus on Feasibility and Implementa,on
Project Schedule
Desired Outcomes
• Community support • Feasible, implementable, and fundable projects
• Wayfinding signage program • Poised for construc,on funding opportuni,es
Opportuni,es
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Evergreen Trails Master Plan - Existing, Proposed, and Conceptual Trails
Meadow Dr.
Upper Bear Creek Rd.
Buffalo Park Rd.
Little Cub Creek Rd.
7474
73S.
Blu
e Sp
ruce
Rd.
Downtown Evergreen
EvergreenHigh School
WulfRec Center
WilmotElementary
School
EvergreenPublic Library
EvergreenLakehouse
Hiwan Homestead
Museum
EvergreenGolf Course
Created: 5/15/2014
Conceptual Trail to Morrison
Pioneer Trailto Bergen Park
Dedisse TrailÞ
Þ
Conceptual Widened Shouldersto Conifer
Draft
Brook Forest Rd.
GroceryStore
LegendEvergreen Trails
Existing
FundedProposed Shared Use PathConceptual
Existing, Social Trail
Þ
Future Trails by Denver Mountain Parks
0 0.2 0.4 0.6 0.80.1
MilesI
Priori,es?
• High School to Library • High School to Evergreen Lake • Wilmot Elementary to Wulf Rec Center • Meadow Drive/Hiwan Homestead • Library to Downtown along 73 • Downtown Sidewalk Improvements • Bear Creek Trail in Downtown Area • Others?
Next Community Mee,ng
• Late July • Review Early Ac,on Project Informa,on • Provide Input to Conceptual Trail Plans
Contact Informa,on
• OV Consul,ng -‐ Chris Vogelsang, PE • 303-‐898-‐8042 • [email protected]