Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Upload: madeleine-martin

Post on 17-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsEverglades Protection Area Tributary Basins

February 28, 2006February 28, 2006

Third Annual Public Meeting on Implementation Progress

Page 2: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Introduction and Opening Remarks

Dean Powell

Long-Term Plan UpdateLong-Term Plan Update

Page 3: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Welcome!Welcome!

Welcome to the third annual public meeting on the Long-Term Plan for Achieving Water Quality Goals of the Everglades (Plan)

Today we will present progress of implementing the Plan and receive comments from the public

Page 4: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Basins Basins AddressedAddressed

#³ #³ #³

%U

&V#³

&V&V&V

%U

%U%U

$T

$T$T

#³#³

$T

$T

&V

&V

&V

$T$T

$T

%U

&V

%U

%U

$T%U

%U

$T

$T

%U

&V

%U

&V &V&V

$T

#³#³

L-8 Basin

S-5A Basin

S-6 BasinS-7 / S-2Basin

S-8 / S-3 BasinC-139 Basin

Feeder CanalBasin

L-28 Basin

C-51W Basin

STA 2

STA 3/4

Wellington/ACMEImprovement District

Basin (Basin B)

STA 1E

L a k e O k e e c h o b e e

A t

l a

n t

i c

O

c e

a n

S-3

S-236

S-4

S-352

S-351S-2

S-190

S-5A

ACME 1DSG-94D

S-6S-10E

G-94B

G-94A

STA 1W

STA 5

STA 6 - Section 2

STA 6

S-8

G-88North SpringsImprovement DistrictBasin

S-150

S-7

S-39

NSID 1

S-140

S-339

S-340

S-151

S-38S-1

44

S-1

45

S-1

46

G-64

S-143S-142S-34

North New RiverCanal Basin

S-337S-31

S-334G-69S-333S-346S-347

G-71

S-9

S-344

S-343A S-343B

S-14

M I A M I - D A D E

M O N R O E

C O L L I E R

B R O W A R D

H E N D R Y

P A L M B E A C H

S-332S-175

S-197

S-18C

B i

s c

a y

n e

B a

y

Everglades

National

Park

WaterConservation

Area 3B

WaterConservation

Area 3A

Water ConservationArea 2B

# G-123#

S-141

$TG-94C

C-11 West Basin

WaterConservation

Area 2A

Water ConservationArea 1

West PalmBeach

FortLauderdale

SOUTH FLORIDA WATER MANAGEMENT DISTRICT

ENVIRONMENTAL RESOURCE REGULATION DEPARTMENTEverglades Stormwater Program

P.O. Box 24680 / 3301 Gun Club RoadWest Palm Beach, Florida 33416-4680

ht tp://www.sfwmd.gov

THE RECIPIENT OF THE ENCLOSED INFORMATION HEREBY ACKNOWLEDGESTHE FOLLOWING:ANY INFORMATION, INCLUDING BUT NOT LIMITED TO SOFTWARE AND DATA,RECEIVED FROM THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD)IN FULFILLMENT OF A PUBLIC RECORDS REQUEST IS PROVIDED "AS IS"WITHOUT WARRANTY OF ANY KIND, AND THE SFWMD EXPRESSLY DISCLAIMS ALLEXPRESS AND IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FORA PARTICULAR PURPOSE. THE SFWMD DOES NOT WARRANT, GUARANTEE, ORMAKE ANY REPRESENTATIONS REGARDING THE USE, OR THE RESULTS OF THEUSE, OF THE INFORMATION PROVIDED TO YOU BY THE SFWMD IN TERMS OFCORRECTNESS, ACCURACY, RELIABILITY, TIMELINESS OR OTHERWISE. THEENTIRE RISK AS TO THE RESULTS AND PERFORMANCE OF ANY INFORMATIONOBTAINED FROM THE SFWMD IS ENTIRELY ASSUMED BY THE RECIPIENT.

Structures that discharge INTOthe EPA

Structures that dischage WITHINthe EPA

Structures that discharge FROMthe EPA

%U

$T&V Other SFWMD Structures

Everglades Protection Area (EPA) : Water ConservationAreas (WCA) 1, 2A, 2B, 3A and 3B,Loxahatchee National Wildlife Refugeand Everglades National Park

S-8 / S-3 Basin

S-7 / S-2 Basin

S-6 Basin

Urban and Tributary Basins

Stormwater Treatment Areas(STAs)

N

EW

S

5 0 5 10 Miles

S-5A Basin

C-51W Basin

C-139 Basin

ERRD/ESP REV. 04-JUN-2001 CMIES SAU x:\ever-gis\ecp\aprfi les\ECP-Basins-cm1.apr Basin Feasibili ty Studies (13 Basins)-L

Seven Everglades Construction Project (ECP) Basins

Six Everglades Stormwater Program (ESP) Basins

Page 5: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

ECP BasinsECP Basins

Seven ECP Basins S-5A, S-6, S-7, S-8, C-

139 & C-139 Annex, and C-51 West

Grouped into six STA-specific areas (STA-1E, STA-1W, STA-2, STA-3/4, STA-5, STA-6)

Page 6: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

ESP BasinsESP Basins

Six ESP Basins Acme Improvement

District, Basin B North Springs

Improvement District North New River

Canal C-11 West L-28 Feeder Canal

Page 7: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Revisions to the Long-Term Plan

February 28, 2006

Long-Term Plan Annual Update

Tracey Piccone, P.E.

Long-Term Plan Update Long-Term Plan Update

Page 8: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

First minor revision to the Plan was approved on April 15, 2004 Integration with CERP by providing unused funds to

assist with Bolles & Cross Canal project surveying workMajor revisions to Part 2 of the October 27, 2003

version of the Plan were submitted to FDEP in November 2004 Modification of STA Enhancements Addition of STAs on Compartments B and C (Acceler8) Addition of the Regional Feasibility Study (Acceler8) Addition of recreational facilities at all STAs FDEP approved revisions in December 2004

Approved Revisions to Approved Revisions to PlanPlan

Page 9: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Additional major revisions to Part 2 were submitted to FDEP in November 2005Revisions to STA Enhancements

• STA-1W Cell 1 enhancements schedule revised (1-yr extension from FY06 to FY07)

• G-304 automation schedule revised (1-yr extension from FY05 to FY06)

• STA-3/4 Cell 1B SAV conversion method revised

FDEP approved revisions in December 2005

Approved Revisions to Approved Revisions to PlanPlan

Page 10: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Current proposal to add Acme Basin B Project to LTP Originally a CERP project with undetermined plan for

addressing runoff Discharges now planned to be treated in STA-1E Project goals consistent with the LTP goals Adding to LTP will allow project completion by

12/2006 (original schedule) and will provide dedicated funding source

Project includes canal improvements, pump stations and a detention area

Capital cost estimate: $27 million (approx.)

Page 11: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Current proposal to revise following LTP components: Process Development and Engineering (PDE)

components • ECP Operations Monitoring• Analysis and Interpretation• PSTA Investigations• PSTA Demonstration Project STA-3/4• Hydrologic and Hydraulic Assessment• Internal Measurements• Comparative Analysis• Lake Okeechobee Long-Term Trends• Determine Water Quality Relationships in EPA• Adaptive Implementation

ECP Compliance Monitoring

Page 12: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Proposed revision to ECP Operations Monitoring

Additional interior monitoring associated with the expanded treatment areas for STA-2 and STA-5

Page 13: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Proposed revisions to Analysis and Interpretation Change to annual reporting of monthly mass-in

mass-out Add baseline sediment cores for expanded treatment

areas Sediment cores for all STAs every 3 years Use either annual vegetation maps or aerial maps Eliminate routine annual vegetation sampling

• Perform on as-needed basis Use Adaptive Implementation for STA optimization Add five years to this project to evaluate expanded

treatment areas

Page 14: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Proposed revision to PSTA Investigations PSTA field scale project ended FY04 – reduced

funding needed in FY05 and FY06 Add two years and $100,000 per year for tracking

of related PSTA projects to incorporate results from USACE PSTA project in STA-1E

Proposed revision to PSTA Demonstration Project STA-3/4 Add one year to operation and monitoring phase

• Slow start due to delay in telemetry installation

Page 15: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Proposed revision to Hydrologic and Hydraulic Assessment, Internal Measurements, and Comparative Analysis Date of second tracer dependent upon

completion of STA-2 Cell 3 internal levee Approximate completion date: 2009

earliest to 2011 latest Extend completion dates out accordingly

for these three projects

Page 16: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Proposed revision to Lake Okeechobee Long-Term Trends Plan recommended activity in FY04 and

FY09 Proposed revision is to conduct ongoing

coordination with Lake Okeechobee staff in FY06 through FY09

Incorporate results into STA performance projections and analyses

Page 17: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Proposed revision to Determine Water Quality Relationships in EPA Extend completion date by 2 years (from

FY05 to FY07) District to work with FDEP, DOI

consultants, and others to determine relationships

District to provide funding for soil reflux study to provide information for updating & calibrating model(s)

Page 18: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed Revisions to PlanProposed Revisions to Plan

Proposed revision to Adaptive Implementation Add Real Time Monitoring of Phosphorus at

STA Structures ($150k over 6 years) Add Strategies for Vegetation Management

in STAs ($1.2 million over 5 years) Miscellaneous activities in FY06

• STA-1W Cell 5 drawdown and enhancements

Page 19: Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals

Proposed revision to ECP Compliance Monitoring Additional compliance monitoring

associated with the expanded treatment area for STA-5

Proposed Revisions to PlanProposed Revisions to Plan