Everglades Restoration: Update on Progress and Activities
Shannon Estenoz
Director, Office of Everglades Restoration Initiatives
U.S. Department of the Interior
Florida Keys National Marine Sanctuary Advisory Council
Everglades Restoration
EVERGLADES NATIONAL
PARK
Florida Bay
Biscayne Bay
Foundation Projects ► Kissimmee River ► C-111 South Dade ► C-51/STA-1E ► Modified Water Deliveries
1st Generation CERP ► Site 1 Impoundment ► IRL-South ► Picayune Strand
2nd Generation CERP ► C-43 Reservoir ► Broward County WPA ► C-111 Spreader Canal ► Biscayne Bay Coastal Wetlands
Kissimmee Restoration: Looking east at Phase II/III railroad bridge construction progress.
October 3, 2012
Kissimmee Restoration: Montsdeoca Run - Phase I restoration area
October 3, 2012
Steps to Complete Modified Waters and C-111 South Dade Projects
G-3273 and S-356 operational testing Northern Detention
Area and C-111 South Dade constructed (Contract 8) Combined
operational plan for Modified Waters and C-111
BIG CYPRESS NATIONAL PRESERVE
WCA 1
LAKE OKEECHOBEE
EVERGLADES NATIONAL
PARK
WCA 2
WCA 3A
3B
COMPREHENSIVE EVERGLADES RESTORATION PLAN 68 Components
30+ year implementation
► Storage
► STAs for water quality
► Seepage management
► Removing barriers to flow
► Revised operations
Surface ASR
EVERGLADES NATIONAL
PARK
Florida Bay
Biscayne Bay
CENTRAL EVERGLADES
Reduce undesirable discharges to east and west coast estuaries
Deliver “new” sources of clean water to the Central Everglades and ENP
Restore habitat in the central Everglades
Too Dry
Healthy
Too Dry; No Flow
Too Dry
10
NORTHERN WCA 3A PROBLEMS TOO DRY, TOO OFTEN
MIAMI CANAL IS AN UNNATURAL HABITAT
A RIVER THAT DOES NOT FLOW
With Flow Without Flow
LAKE OKEECHOBEE
St. Lucie Estuary
Caloosahatchee Estuary
Gulf of Mexico
Florida Bay
Biscayne Bay
EVERGLADES AGRICULTURAL
AREA
EVERGLADES NATIONAL
PARK
WCA 3
WCA 1
WCA 2
CENTRAL EVERGLADES PLANNING PROJECT (CEPP)
PROPOSES TO:
Move water south from Lake Okeechobee through Everglades Agricultural Area (EAA)
Improve benefits to the Caloosahatchee and St Lucie estuaries
Store and treat flows with proposed flowage equalization basin (FEB) in the EAA
Send treated water south through Water Conservation Area 3A (WCA 3) and a flowway portion of 3B, and into Everglades National Park and Florida Bay
WCA 3A
WCA 2
WCA 1
I-75
WCA 3B
SPATIAL PERSPECTIVE North of the Redline
Combination of features to increase water deliveries downstream and improve estuarine benefits
South of the Redline Features and their locations to best restore
sheetflow in northern Water Conservation Area 3A
Greenline/Blueline Features to best restore sheetflow through southern
WCA-3A and 3B
Configuration of conveyance features to best restore flows to Everglades National Park
Yellowline Features to best compliment rest of project and
manage seepage to the eastern urban area without impacting the water supply
S-333
L-30
L-33
L-28
L-5
Tamiami Trail
L-67 Ext
EVERGLADES AGRICULTURAL
AREA
WATER CONSERVATION
AREAS
EVERGLADES NATIONAL
PARK
L-29
With CEPP planning terminology
TENTATIVELY SELECTED PLAN (Alt 4R)
Construct A-2 FEB and integrate with A-1 FEB operations Lake Okeechobee operation refinements within LORS
DISTRIBUTION/CONVEYANCE
SEEPAGE MANAGEMENT
STORAGE AND TREATMENT
DISTRIBUTION/CONVEYANCE
Increase S-333 capacity to 2,500 cfs Two 500 cfs gated structures in L-67A, 0.5 mile spoil removal west of
L-67A canal north and south of structures Construct ~8.5 mile levee in WCA 3B, connecting L-67A to L-29 Remove ~8 miles of L-67C levee in Blue Shanty flowway (no canal back fill) One 500 cfs gated structure north of Blue Shanty levee and 6,000-ft gap
in L-67C levee Remove ~4.3 miles of L-29 levee in Blue Shanty flowway, divide structure
east of Blue Shanty levee at terminus of western bridge Tamiami Trail western 2.6 mile bridge and L-29 canal max stage at
9.7 ft (FUTURE WORK BY OTHERS) Remove entire 5.5 miles L-67 Extension levee, backfill L-67 Extension canal Remove ~6 mile Old Tamiami Trail road (from L-67 Ext to Tram Rd)
Increase S-356 pump station to ~1,000 cfs Partial depth seepage barrier south of Tamiami Trail (along L-31N) G-211 operational refinements; use coastal canals to convey seepage
FEB Pump
Note: System wide operational changes and adaptive management considerations will be included in project
Gated Structure Levee Removal
STA Backfill
Seepage Barrier Levee Divide
Diversion of L-6 flows, Infrastructure and L-5 canal improvements Remove western ~2.9 miles of L-4 levee (west of S-8 3,000 cfs capacity) 360 cfs pump station at western terminus of L-4 levee removal Backfill Miami Canal and Spoil Mound Removal ~1.5 miles south of S-8 to I-75
WCA 3A
WCA 1
I-75
S-333
L-30
L-33
C-2
L-28
S-356
S-335
EVERGLADES AGRICULTURAL
AREA
WCA 3A
S-8 L-5
NOT TO SCALE
L-4
Old Tamiami Trail Removal
WCA 2
EVERGLADES NATIONAL
PARK
Tamiami Trail S-334
L-29
WCA 3B
WATER CONSERVATION
AREAS
Canal Improvement
L.O. WATER FLOW
G-211 L-67 Ext 8.5
SMA
C-11
1 SD
A-1 A-2
`
Questions?