No 8, Barrister Obinna Okwara Crescent/Plot 37 Chief Executive Quarters, Opposite Ahiajoku Convention Centre. Area B, New Owerri, Imo State. NDSP4 & MPP9 WORKS PROGRAMME IMPLEMENTATION IN THE NINE NIGER DELTA STATES EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME COMPONENT 4 (NDSP4) IN EDO STATE LEGACY BOOK

Upload: others

Post on 10-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

No 8, Barrister Obinna Okwara Crescent/Plot 37 Chief Executive Quarters, Opposite Ahiajoku Convention Centre. Area B, New Owerri, Imo State.

NDSP4 & MPP9 WORKS PROGRAMME IMPLEMENTATION IN THE NINE NIGER DELTA STATES

EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME COMPONENT 4 (NDSP4) IN EDO STATE

LEGACY BOOK

Page 2: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

EDO STATE MAP

ETSAKO WEST

IKPOBA OKHA

ESAN SOUTH EAST

Page 3: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 3

TABLE OF CONTENTS

FOREWORD 4

PROGRAMME OVERVIEW 5

WORKS CONTRACT OVERVIEW 8

PROGRAMME IMPLEMENTATION TEAM 10

DETAILS OF NDSP4 PROGRAMME IN EDO STATE

• STAKE HOLDERS TEAM 11

• PROJECT LIST 12 & 13

• PHOTOGRAPH OF IMPLEMENTED PROJECTS 14

Publication: NDSP4/012/09/2019

Page 4: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 4

FOREWORD

The NDSP4 Publication series is an attempt to bring some of our key reports and consultancy reports to our stakeholders and a wider audience.

The overall objective of the Niger Delta Support Programme (NDSP) is to mitigate the conflict in the Niger Delta by addressing the main causes of the unrest and violence: bad governance, (youth) unemployment, poor delivery of basic services. A key focus of the programme will be to contribute to poverty alleviation through the development and support given to local community development initiatives.

The NDSP4 aims to support institutional reforms and capacity building, resulting in Local Gov-ernment and State Authorities increasingly providing infrastructural services, income gener-ating options, sustainable livelihoods development, gender equity and community empow-erment. This will be achieved through offering models of transparency and participation as well as the involvement of Local Governments in funding Micro projects to enhance impact and sustainability. Specifically, 863 community projects are expected to be implemented as part of the EU support to community development in the Niger Delta.

By the end of August 2019, some 690 out of the 863 micro-projects had been completed and accepted.

In addition, under the NDSP4 Service Contract, 330 uncompleted projects were taken up un-der an addendum No.1 to the contract (mpp9) and successfully completed 302 by the end of December 2017; the remaining 28 were carried over to NDSP4 Works contract-2.

Kingsley FossuTeam Leader – NDSP4

Page 5: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 5

PROGRAMME OVERVIEW

NDSP Component 4 (NDSP4)NDSP4 is an extension of MPP9 and is building on its achievement, focussing on focal com-munities and capable and reform-minded Local Government authorities. This component is implementing micro-projects co-funded with Local Governments, which will contribute to building the capacity of local governments in service delivery to the poor and to strength-ening the partnership between Government authorities and communities. By implementing Micro-Projects in a wide range of communities, the programme aims to improve the delivery of social and economic services and to sensitise communities to demand good governance through the community participatory planning and development.

NDSP4 includes allowance for community-based action in support of conflict prevention/management or addressing other issues of relevance to the affected communities, including environmental improvements.

The Objective of NDSP Component 4 is to support local communities’ development initiatives and conflict alleviation by completing the 9th EDF MPP9 project, which has a financial short-fall. Expected results to be achieved are:

Result 1: Strengthened Community Governance through adoption of Community Development Action Plans by Communities and Local Government authorities.Result 2: Increased equitable access to basic infrastructure services by women and men.Result 3: Increased equitable access to income generating options and sustainable livelihood development by women and children.Result 4: Improved social cohesion among village communities.

Management StructureThe MBNP, represented by the National Authorising Officer (NAO), is the FGN implementation agency and is supported by the following management structure:• National Project Steering Committee (PSC)• State Level Project Stakeholders Coordination Committee (SLPSCC)• Project Implementation Management Unit (PIMU): • Implementation Field Offices (IFOs)• Micro-Projects Implementation Committees (PICs)

Page 6: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 6

Funding ArrangementThe funding arrangement was based as follows:• Total EU Funding: €45,000,000.00 (for works/Services)• European Union: €25,905,000.00 (50% for works)• LGAs: €12,952,500.00 (25% for works)• Communities: €12,952,500.00 (25% in kind)• States: To facilitate, coordinate and monitor projects.

Micro Projects CategoriesMenu of proposed micro projects under NDSP-C4 include:• Basic Water Supply and Sanitation infrastructure, • Health Centres, • Educational Infrastructure, • Civic Centres/Town Halls and • Income Generating Infrastructure (Palm Oil Mills, Cassava Mills)• Open and Lock-up Markets, etc.

NDSP4 Achievement and Challenges So FarBelow are Achievements of NDSP4 since its inception in January 2014:• Completion of the 9th MPP9 project under NDSP4 Additional Services contract with over

90% completion rate.• Facilitated the successful selection of NDSP4 LGAs and communities with the support of

the nine ND States.• Sensitisation of key stakeholders on NDSP4 for awareness creation and seamless partici-

pation.• Establishment of SLPSCCs & PICs in the nine ND States and communities for programme

coordination, implementation and sustainability.• Successful procurement of works contractors (Lots 1 to 9) for construction of over 860

MPs via Works Contract 1 and Works Contract 2 in the nine ND States with high success in contract execution.

• Preparation and Implementation of Programme Estimate 1 to facilitate full participation of key stakeholders (Communities, CSOs, State and LGA officials, etc.) in NDSP4.

• Implementation of a robust visibility and communication action plan to create programme awareness and information dissemination via production and distribution of NDSP4 vis-

Page 7: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 7

ibility materials and promotional items (brochures, folders, jotters, Tee shirts and Caps, pens etc.).

• Development and regular update of NDSP4 website with mobile application software for upload of events and progress of work during field missions.

• Widening the scope of NDSP4 visibility via creation of NDSP4 Facebook account and Twit-ter handle.

• Capacity building of State, LGA and communities on procurement, project monitoring, management, operation and maintenance of water and agro processing mills.

• Commissioned study and publication of key stakeholders’ engagement on the sustaina-bility of provided micro projects facilities.

• Main challenge is late commencement of construction work and delay by LGAs in the dis-charge of their counterpart contribution.

Related Programmes/Donor Activities in NDThere are similar initiatives in the Niger Delta region funded by the EU and other international donor agencies that are targeted towards alleviating poverty and conflict. The donors and agencies include CIDA, UNDP, DFID, WHO, USAID etc.

1. Kingsley Fossu (Team Leader) Email: [email protected] Phone: 09031271414

Office Address:Project Implementation Unit (PIMU),

No. 8 Barrister Obinna Okwara Crescent, Plot37 Chief Executive Quarters, Area B, New Owerri, Imo State.Website: www.ndsp4.org Facebook: www.facebook.com/NDSP4

Twitter Handle: @EU-NDSP4

For Further Information, Please Contact:

2. Engr. Uwadiale, Oziegbe Wisdom (Chief Engineer) Phone: 08035439955 [email protected]

Page 8: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 8

NDSP4 WORKS CONTRACT & CONSTRUCTION PROGRESS.

1) Overview of NDSP4 Works Contracts (Works Contract-1 & Works Contract-2)The NDSP4 works contracts are construction contracts comprising buildings and water projects. They are micro projects of basic standards. Building project; The walls are made of sand Crete block and the surface is rendered with cement-sand mortar finishing. The roof structural members are wood cov-ered with long span aluminium roofing sheets finished with wooden fascia boards. The ceiling sheets are cements fibre materials. The windows are made of aluminium casement and the doors are made of metals with transom. The floor is finished with cement / sand mortar screeded on a concrete damp proof course (DPC) except health center buildings which are finished with tiles. The walls and ceilings are painted with emulsion paint. Water project; The water project is a basic standard motorized bore-hole powered by solar energy. The tank stand is a steel structure with base plate bolted to concrete foundation footing with anchor bolts. The water tanks are plastic tanks with in-let and out-let units for water supply and distribution services. The solar power system is automatic in operation with the CU200 panel. This system is protected against thunder by proper earthing system. The water distribu-tion point is constructed with block and concrete structure with three battery taps units. The projects types include; solar powered motorised borehole, school block, health post, civic center, market stall, cassava mill and palm oil mill.

NDSP4 Works Contract 1 (WC1) & Works Contract 2 (WC2); A total of 863 numbers of community pro-jects were planned to be implemented as part of the EU support to community development in the Niger Delta. Of these, 579 projects were awarded in 9 Lots in the first tranch as Works Contract -1 (WC1). A total of 254 projects were also awarded in 8 Lots for the second tranch as Works Contract – 2 (WC2) except in Cross River State where a balancing 30 projects are yet to be awarded under WC2. These have been achieved through offering models of transparency and participation as well as the involvement of States in coordination and Local Governments in funding Micro projects to enhance impact and sustainability.

Outstanding MPP9 construction completion activities; Micro Projects Programme in the Nine Niger Delta States (MPP9) was the preceding programme before NDSP4. The outstanding part of uncom-pleted works in MPP9 was awarded to the consultant as addendum to their contract to provide su-pervision activities for the remaining MPP9 projects that were not completed during the life span of the programme. When the addendum contract (NDSP4-Addendum No.1) ends in June 2017, there were still residual of MPP9 construction activities not completed. The NDSP4 main part has technically provided supervision services for the MPP9 residual works since June 2017. The works done on the residual of MPP9 construction completion activities are clearly outlined.

MPP3, MPP6 and MPP9 Inventory Documentation: Additional activities of inventory documentation of MPP3, MPP6 and MPP9 have been added to NDPS4 assignment as part of its deliverables. Experts have been fully mobilized to site on the 18th June 2019 to commence these activities in the Nine Niger Delta States. The result of this assignment will provide detailed data of all completed projects under Micro Projects Programme in the Three Niger Delta States (MPP3 – Bayelsa, Delta & Rivers), Micro Pro-

WORKS CONTRACT OVERVIEW

Page 9: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 9

jects Programme in the Six Niger Delta States (MPP6 – Abia, Akwa-Ibom, Cross River, Edo, Imo & Ondo) and Micro Projects Programme in the Nine Niger Delta States (MPP9 - Abia, Akwa-Ibom, Bayelsa, Cross River, Delta, Edo, Imo, Ondo & Rivers State)

Page 10: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 10

S/N STATE NAMES OF EXPERTS DESIGNATION OF EXPERTS

1 All States Kingsley Fossu Key Expert – 1 (Team Leader)

2 All States Engr. Uwadiale, Oziegbe Wisdom

Key Expert – 2 (Chief Engineer)

3 All States Engr. Ibrahim Musa Key Expert – 3

4 All States Engr. Prosper Erah Coordinating Engineer

5 All States Mr. Henry Akinsulire Account & Contract Officer

6 Edo Engr. Benjamin Oseghale Non-Key Expert (NKE)

Engr. Ekhator Felix Rural Infrastructure Engineer (RIE)

Mr. Adegbusi Olaoye Project Assistance (PA)

IMPLEMENTATION TEAM

Page 11: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 11

STAKE HOLDERS

EDO STATE

S/N DESIGNATION DURATION NAMES /MINISTRY/ DEPT.

1 GOVERNORS 2014 – 2016

2016 - Till Date

Comrade Adams Oshiomole

Mr Godwin N. Obaseki

2 DEPUTY GOVERNORS 2014 – 2016

2016 – Till Date

Dr Pius Odubu

Mr Philip Shaibu

3 COMMISSIONERS 2014 – 2016

2016 – June 2019

July 2019 – Till Date

Mr Lawrence Aghedo

Hajia Mariam Abubakar

Princess Otse M. Omorogbe

4 PERMANENT SECRETARIES 2014 – 2015

2015 – 2016

2017 – Till Date

Mr C.O. Odigie

Comrade Yusuf Imodu

Mrs Vera Obadan

5 DESK OFFICERS 2014 – July 2017

July 2017 – Nov. 2017

Nov. 2017 – Till Date

Mr K.O. Ogbodu

Malam Usman Binanu

Mr K.O Ogbodu

Page 12: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 12

NDSP4 PROJECTS COMPLETED DATA BASE FOR EDO STATE

S/N Project ID Community Project LGA State Status

1 1 Usogun School block Etsako West Edo Completed

2 2 Uguye Akpekpe, Auchi Health centre Etsako West Edo Completed

3 3 Sabo Iyakpi School block Etsako West Edo Completed

4 4 Ugieda School block Etsako West Edo Completed

5 5 Idegun Health centre Etsako West Edo Completed

6 6 Amah Awain Water Etsako West Edo Completed

7 7 Elele Uzairue Town hall Etsako West Edo Completed

8 8 Iyuku Uzairue Open Market Etsako West Edo Completed

9 9 Afowa Uzairu School block Etsako West Edo Completed

10 10 Iyora Uzairue School block Etsako West Edo Completed

11 11 Ayogwiri Uzairue Health centre Etsako West Edo Completed

12 12 Osuali Health centre Etsako West Edo Completed

13 13 Ughiekhai/ Egbogio School block Etsako West Edo Completed

14 14 Iyamoh Open Market Etsako West Edo Completed

15 15 Apana Health centre Etsako West Edo Completed

16 16 Ikabigbo Water Etsako West Edo Completed

17 17 Aviele School block Etsako West Edo Completed

18 18 Ugbenor Town hall Etsako West Edo Completed

19 19 Agbede School block Etsako West Edo Completed

20 20 Ikholo Town hall Etsako West Edo Completed

21 21 Afa school Hall School block Etsako West Edo Completed

22 22 Idanirace Mix Market Etsako West Edo Completed

23 23 Imeke-Uzairue School block Etsako West Edo Completed

24 1 Iselu School block Esan South East Edo Completed

25 2 Idu-Mujie Town hall Esan South East Edo Completed

26 3 Okede Open Market Esan South East Edo Completed

27 4 Uzebu Health centre Esan South East Edo Completed

28 5 Asaboro camp Okaigben Health centre Esan South East Edo Completed

29 6 Oria School block Esan South East Edo Completed

30 7 Onoghlo Health centre Esan South East Edo Completed

31 8 Illushi Open Market Esan South East Edo Completed

32 9 Ubiaja- Ekobeko Health centre Esan South East Edo Completed

33 10 Oghu School block Esan South East Edo Completed

34 11 Agadaga School block Esan South East Edo Completed

35 12 Ugboha School block Esan South East Edo Completed

36 13 Okuesan Health centre Esan South East Edo Completed

37 14 Ulloshi Water Esan South East Edo Completed

38 15 Ohodua School block Esan South East Edo Completed

Page 13: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 13

39 16 Ifeku Inland Town hall Esan South East Edo Completed

40 17 Idumu-Oniha Town hall Esan South East Edo Completed

41 18 Uriwa Civic Centre Esan South East Edo Completed

42 19 Olenokhua School block Esan South East Edo Completed

43 20 Idu-Mugho Health centre Esan South East Edo Completed

44 21 Idenwe Ewato Open Market Esan South East Edo Completed

45 22 Id-Owemen Mix Market Esan South East Edo Completed

46 1 Ogbekpen School block Ikpoba - Okha Edo Completed

47 2 Oka Ne-Ubo Ogor School block Ikpoba - Okha Edo Completed

48 3 Obagienebuosa School block Ikpoba - Okha Edo Completed

49 4 Umelu School block Ikpoba - Okha Edo Completed

50 5 Ohovbe School block Ikpoba - Okha Edo Completed

51 6 Obayantor 1 Town hall Ikpoba - Okha Edo Completed

52 7 Avbiama Mix-Market Ikpoba - Okha Edo Completed

53 8 Evbo Amufi Health centre Ikpoba - Okha Edo Completed

54 9 Evbuoriaria Health centre Ikpoba - Okha Edo Completed

55 10 Ugbekun Health centre Ikpoba - Okha Edo Completed

56 11 Evborhan / Oka-Useni Water Ikpoba - Okha Edo Completed

57 12 Obaretin Water Ikpoba - Okha Edo Completed

58 13 Uhie Health centre Ikpoba - Okha Edo Completed

59 14 Oregbeni Open Market Ikpoba - Okha Edo Completed

60 15 Evbomoma Town hall Ikpoba - Okha Edo Completed

61 16 Utezi School block Ikpoba - Okha Edo Completed

62 17 Okhiri Eresonye Health centre Ikpoba - Okha Edo Completed

63 18 Okhiri 2 Water Ikpoba - Okha Edo Completed

64 19 Idogbo School block Ikpoba - Okha Edo Completed

65 20 Evbomoma Water Ikpoba - Okha Edo Completed

66 21 Obazagbon Town hall Ikpoba - Okha Edo Completed

Total No. of projects 66

Page 14: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 14

No. 1COMMUNITY: USOGUNPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 3COMMUNITY: SABO - IYAKPIPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 5COMMUNITY: IDEGUNPROJECT TYPE: HEALTH POSTLGA / STATE: ETSAKO WEST, EDO STATE

No. 2COMMUNITY: UGUYE AKPEKPE AUCHI/ISANIPROJECT TYPE: HEALTH POSTLGA / STATE: ETSAKO WEST, EDO STATE

No. 4COMMUNITY: UGIEDAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No.6COMMUNITY: AMAH AWAINPROJECT TYPE: WATER SCHEMELGA / STATE: ETSAKO WEST, EDO STATE

( ETSAKO WEST )

COMMUNITIES/PROJECTS – EDO STATE

Page 15: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 15

No. 7COMMUNITY: ELELE UZAIRUEPROJECT TYPE: CIVIC CENTRELGA / STATE: ETSAKO WEST, EDO STATE

No. 9COMMUNITY: AFOWA UZAIRUEPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 11COMMUNITY: AYOGWIRI UZAIRUEPROJECT TYPE: HEALTH POSTLGA / STATE: ETSAKO WEST, EDO STATE

No. 8COMMUNITY: IYUKU - UZAIRUEPROJECT TYPE: OPEN MARKETLGA / STATE: ETSAKO WEST, EDO STATE

No. 10COMMUNITY: IYORA UZAIRUEPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 12COMMUNITY: OSUALI/OMEMIPROJECT TYPE: HEALTH POSTLGA / STATE: ETSAKO WEST, EDO STATE

( ETSAKO WEST )

COMMUNITIES/PROJECTS – EDO STATE

Page 16: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 16

No. 13COMMUNITY: EGBOGIOPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 15COMMUNITY: APANAPROJECT TYPE: HEALTH POSTLGA / STATE: ETSAKO WEST, EDO STATE

No. 17COMMUNITY: UBIANE AVIELEPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 14COMMUNITY: 1YAMOHPROJECT TYPE: OPEN MARKETLGA / STATE: ETSAKO WEST, EDO STATE

No. 16COMMUNITY: IKABIGBOPROJECT TYPE: WATER SCHEMELGA / STATE: ETSAKO WEST, EDO STATE

No. 18COMMUNITY: UGBENORPROJECT TYPE: CIVIC CENTRELGA / STATE: ETSAKO WEST, EDO STATE

( ETSAKO WEST )

COMMUNITIES/PROJECTS – EDO STATE

Page 17: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 17

No. 21COMMUNITY: AFASHIOPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 22COMMUNITY: IDANIRACEPROJECT TYPE: MIX MARKETLGA / STATE: ETSAKO WEST, EDO STATE

No. 19COMMUNITY: AGBEDEPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

No. 20COMMUNITY: IKHOLO-UZAIRUEPROJECT TYPE: OPEN MARKETLGA / STATE: ETSAKO WEST, EDO STATE

No. 23COMMUNITY: UZAIRUEPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ETSAKO WEST, EDO STATE

( ETSAKO WEST )

COMMUNITIES/PROJECTS – EDO STATE

Page 18: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 18

No. 24COMMUNITY: ISELUPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 26COMMUNITY: OKEDEPROJECT TYPE: OPEN MARKETLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 28COMMUNITY: ASABORO CAMP OKAIGBENPROJECT TYPE: HEALTH POSTLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 25COMMUNITY: IDU MUJIEPROJECT TYPE: CIVIC CENTRELGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 27COMMUNITY: UZEBUPROJECT TYPE: HEALTH POSTLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 29COMMUNITY: ORIAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ESAN SOUTH EAST, EDO STATE

COMMUNITIES/PROJECTS – EDO STATE

( ESAN SOUTH EAST )

Page 19: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 19

No. 30COMMUNITY: ONOGHOLOPROJECT TYPE: HEALTH POSTLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 32COMMUNITY: EKOBEKO-UKPAJAPROJECT TYPE: HEALTH POSTLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 34COMMUNITY: AGADAGAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 31COMMUNITY: ILLUSHIPROJECT TYPE: MIX MARKETLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 33COMMUNITY: OGHUPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 35COMMUNITY: UGBOHAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ESAN SOUTH EAST, EDO STATE

( ESAN SOUTH EAST )

COMMUNITIES/PROJECTS – EDO STATE

Page 20: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 20

No. 36COMMUNITY: OKHUESANPROJECT TYPE: HEALTH POSTLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 38COMMUNITY: OHORDUAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 40COMMUNITY: IDU ONIHAPROJECT TYPE: CIVIC CENTRELGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 37COMMUNITY: ULOSHIPROJECT TYPE: WATER SCHEMELGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 39COMMUNITY: IFEKU - ISLANDPROJECT TYPE: CIVIC CENTRELGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 41COMMUNITY: URIWAPROJECT TYPE: CIVIC CENTERLGA / STATE: ESAN SOUTH EAST, EDO STATE

COMMUNITIES/PROJECTS – EDO STATE

( ESAN SOUTH EAST )

Page 21: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 21

No. 42COMMUNITY: OLENOKHUAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 44COMMUNITY: IDI-IWE EWATOPROJECT TYPE: OPEN MARKET STALLSLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 43COMMUNITY: IDU - MUGHOPROJECT TYPE: HEALTH POSTLGA / STATE: ESAN SOUTH EAST, EDO STATE

No. 45COMMUNITY: ID - OWEMHENPROJECT TYPE: MIX MARKETLGA / STATE: ESAN SOUTH EAST, EDO STATE

( ESAN SOUTH EAST )

COMMUNITIES/PROJECTS – EDO STATE

Page 22: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 22

No. 46COMMUNITY: OGBEKPENPROJECT TYPE: EDUCATION BLOCKLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 48COMMUNITY: OBAGIENOVBOSAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 50COMMUNITY: OHOVBEPROJECT TYPE: EDUCATION BLOCKLGA / STATE: IKPOBA-OKHA, EDO STATE

No.47COMMUNITY: OKANEVBOGORPROJECT TYPE: EDUCATION BLOCKLGA / STATE: IKPOBA-OKHA, EDO STATE

No.49COMMUNITY: UMELUPROJECT TYPE: EDUCATION BLOCKLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 51COMMUNITY: OBAYANTOR-1PROJECT TYPE: CIVIC CENTRELGA / STATE: IKPOBA-OKHA, EDO STATE

COMMUNITIES/PROJECTS – EDO STATE

( IKPOBA-OKHA )

Page 23: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 23

No. 52COMMUNITY: AVBIAMAPROJECT TYPE: MIXED MARKETLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 54COMMUNITY: EVBUORIARIAPROJECT TYPE: HEALTH POSTLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 56COMMUNITY: EVBORHA OKA/USENIPROJECT TYPE: WATER SCHEMELGA / STATE: IKPOBA-OKHA, EDO STATE

No. 53COMMUNITY: EVBO-AMUFIPROJECT TYPE: HEALTH POSTLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 55COMMUNITY: UGBEKUNPROJECT TYPE: HEALTH POSTLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 57COMMUNITY: OBARETINPROJECT TYPE: WATERLGA / STATE: IKPOBA-OKHA, EDO STATE

COMMUNITIES/PROJECTS – EDO STATE

( IKPOBA-OKHA )

Page 24: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 24

No. 58COMMUNITY: UHIEPROJECT TYPE: HEALTH POSTLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 60COMMUNITY: EVBOMOMAPROJECT TYPE: CIVIC CENTRELGA / STATE: IKPOBA-OKHA, EDO STATE

No. 62COMMUNITY: UKHIRI-ERESOYENPROJECT TYPE: HEALTH POSTLGA / STATE: IKPOBA-OKHA, EDO STATE

No.59COMMUNITY: OREGBENIPROJECT TYPE: OPEN MARKET STALLSLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 61COMMUNITY: UTEZIPROJECT TYPE: EDUCATION BLOCKLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 63COMMUNITY: UKHIRI-2PROJECT TYPE: WATERLGA / STATE: IKPOBA-OKHA, EDO STATE

COMMUNITIES/PROJECTS – EDO STATE

( IKPOBA-OKHA )

Page 25: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 25

No. 64COMMUNITY: IDOGBOPROJECT TYPE: EDUCATION BLOCKLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 66COMMUNITY: OBAZABONPROJECT TYPE: CIVIC CENTERLGA / STATE: IKPOBA-OKHA, EDO STATE

No. 65COMMUNITY: EVBOMOMA-EGESOSIPROJECT TYPE: WATERLGA / STATE: IKPOBA-OKHA, EDO STATE

COMMUNITIES/PROJECTS – EDO STATE

( IKPOBA-OKHA )

Page 26: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019EDO STATE

Page 26

1. DescriptionofLGAsContribution

S/No.FacilitytobeConstructed DescriptionofWorks DetailsofActivities ProjectsConcerned

1. FenceinProject

TheLGAshallConstructaperimeterfencearoundtheprojectwherenecessary.TheConstructionofthefenceincludesthefollowingprocesses:

• ExcavationofFoundation;0.45mwidex0.60mdeep

• Blindingandcastingoffoundationconcrete;0.15mthick(350kg/m3)

• Constructionoffencewallwith0.15mthickcement/sandblocksupto1.8mabovegroundlevel.

• Construction,installationandfinishingofsteelentrancegatesof3.0mwideforallprojectsand1.20mwideforborehole/watertower

AllProjects

2.ConstructionofToilets

TheLGAshallundertaketheconstructionofPourFlushToiletsforprojectswheretoiletfacilityarerequiredtocomplimentthemainactivityandfunctionoftheproject.Theconstructionoftoiletsinvolvesthefollowing:

• Construction of a simple building withCement/sand blocks, timber roof trusses andAlu-zinc roofing sheets with overall dimensions6.0mx3.30m.Thebuildingcomprisesofnotlessthan4unitsofsquattoilets,2noeachformenand women separated with central hand washlobby.

• ExcavateFoundation;0.45mx0.60m• Blindandcastconcretestrip foundation;0.15m

thick(350kg/m3)• Foundation and structural walls; 0.15m full

masonry blocks and finished trowelled cementplaster.

• Roofing;hardwoodtrussesandcoveringinAlu-zincroofingsheets

• Doors;solidcoreflushdoorsonhardwooddoorframeandfittedwithappropriatelocks.

• Plumbing; Twyford or similar make ceramicsquattoiletpansfittedonthefloorandplumbedtoSoakaway/septictankpitswithPVCpipesandaccessories.

• Constructseptictankof2.10mx3.60mx2.89mandfinishtodrawingsdetails

ConstructionProjects

3.WaterSupply(BoreholewithHandPump)

The LGA shallundertake the drillingand installation ofborehole with handpump for the supply ofwater to projects thatrequire water tocomplement function.The borehole isconstruction shallincludethefollowings:

• Conduct geophysical survey (field work,interpretation and report) for the location ofboreholeatasuitablesite.

• Drillingofboreholeinsedimentaryformation• (0-60m).• Supply and install 110mm diameter UPVC

casings of 10 bar and 110mm diameter UPVCscreensof10barpressurerating;slotsize0.5.

• Conduct water quality analysis (biological,chemical and physical) and boreholedisinfection.

• Install to designed depth an appropriate handpump on a concrete plate form withbucket/users'standwithdraintroughstowastechannel.

Healthcentres,Agroprocessingandmarkets

4.ConstructionofDryingPlatform

TheLGAshall constructa drying platform forwarehouseprojectsandthe drying platformshall be constructed as

• The drying platform shall be constructed ofreinforcedconcrete3.0mx6.0m

• Excavatefoundation0.45mx0.45m• Blindandcastfoundationconcrete/beam0.15m

thickx0.25m(350kg/m3)

AgroProcessing

Page 27: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 EDO STATE

Page 27

follows: • Fillandcompactwithgoodqualitylaterite• Cast 0.10m thick concrete with BRC

reinforcement

5.SupplyofFurniture

The LGAs shall supplyfurnitureforusebytheSchool pupils andTeachers. Suchfurniture shallbemadeof seasonedhardwoodand finished inappropriate woodpolish. The items shallinclude the followingand shall be approvedby the Local EducationAuthority:

• School Desk: 1.2m long double seaterwritingdeskwithintegralbenchunit.

• TeachersTable:1.4x0.7x0.9msize• Teachers Chair; 0.45 X 0.45m back chair

with seat and back rest finished in foamandleathercovering.

School ClassroomBlocks

6.SupplyofEquipment

The LGA shall supplymedical equipment tothe specification andapprovaloftheMinistryof Health: PrimaryHealth CareDepartment. Themedical equipmentshall include thefollowing basic andminimum numbers ofitems:

Patients’Requirements• Beds• Dripstand• Bedsidelocker• Deliverybed• Waitingchairs

StaffRequirements• Consultingtables• ConsultingChairs• Examinationbed• Treatmentkit

HealthCentres

7.AccommodationforStaff

TheLGAshallundertaketheprovisionofresidentialaccommodationforstationnursesatthehealthpostaswellasheadteachersattheprojects.Theaccommodationshallcomplywiththefollowingminimumspecifications:

• Separatelivingandsleepingrooms• Kitchenette• Toilet

HealthCentresandSchoolProjects

8.ConstructionofIncineratorPit

TheLGAshallundertaketheconstructionofanincineratorforagroprocessingprojects.Theincineratorshallbeconstructedinthefollowingmanner:

• Incineratorsize;0.9x1.35m• Walls to be of laterite brick units, 2.70m

high and with base window for fire andanother at 0.9m for filling of waste forburning.

• Roof to be reinforced concrete restingdirectly on the walls with windowsunderneath.

AgroProcessingMills

Page 28: EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME ... · Mr C.O. Odigie Comrade Yusuf Imodu Mrs Vera Obadan 5 DESK OFFICERS 2014 – July 2017 July 2017 – Nov. 2017 Nov. 2017 –

FUNDED BY EU

EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME COMPONENT 4 (NDSP4) IN EDO STATE

LEGACY BOOK

PRODUCED BY