  • MP Equi Tools Site Scope PR Estm QUTReceiv,

    PO

    Start

    Work

    OPN:14\120001 Technical Replacing Damage racks GSI 22-Nov-14 25-Nov-14 21-Dec-04 Waiting waiting PO

    OPN:14\120002 Technical Construction Of New Trench Aminat 18-Sep-14 21-dec-14 On progress Under study

    OPN:14\120003 workshop Shed Floor For HCL Storage Aminat 08-Dec-14 10-Dec-14 On progress Under study

    OPN:14\120004 workshop Integral Orifice Pipe Spool Aminat 08-Dec-14 12-Dec-14 22-Dec-14 Waiting waiting PO

    OPN:14\120005 Technical Sump Area Barrication Aminat 18-Sep-14 18-Dec-14 Waiting waiting PO

    OPN:14\120006 Technical Lab Partician & Kitchen Wall Particioan Aminat 12-Sep-14 14-Sep-14 21-Dec-14 Waiting waiting PO

    OPN:14\120007 Technical Recoating by epoxy in drumming area Aminat 12-Sep-14 15-Dec-14 21-Dec-14 Waiting waiting PO

    OPN:14\120008 workshop Fume Collector Aminat 18-Sep-14 11-Dec-14 22-Dec-14 Waiting waiting PO

    OPN:14\120009 Technical New Manhole Cover Work GSI 25-Nov-14 25-Nov-14 22-Dec-14 Waiting waiting PO

    OPN:14\120010 Technical Installation Of Air Curtain Aminat 30-Sep-14 01-Oct-14 22-Sep-14 Waiting waiting PO

    OPN:14\120011 Technical Hazardous Area Identification Work Aminat 30-Nov-14 20-Nov-14 On progress Under study

    OPN:14\120012 Technical Road Excavation &Related Electrical Aminat 15-Oct-14 18-Oct-14 waiting waiting PO

    OPN:14\120013 Technical Tank painting Aminat 18-Dec-14 21-Dec-14 On progress Under study

    OPN:14\120014 Technical Gravel Shifting Work Aminat 11-Jan-14 15-11-14 Complet

    OPN:14\120015 Technical Painting Services Aminat 02-Dec-14 03-Dec-14 Cancal

    OPN:14\120016 Technical labeling pipeline Aminat 03-Sep-14 15-10-14 Online on progress (inside port)

    OPN:14\120017 workshop porta cabin Aminat 23-Jun-14 23-Jun-14 waiting waiting PO

    OPN:14\120018 Technical Repair of 10 HDPE Pipe GSI 23-Dec-14 25-Dec-14 Closed

    OPN:14\120019 workshop Car Parking Cover Aminat 02-Dec-14 03-Dec-14 15-Dec-14 Waiting waiting PO

    OPN:14\120020 Technical installation of flue duct Aminat 03-Dec-14 06-Dec-14 On progress Under study

    OPN:14\120021 manpower shutdown technical Services Aminat 30-Nov-14 30-Nov-14 02-Dec-14 Complet

    OPN:14\120022 workshop Magnetic Drilling Services Aminat 23-Nov-14 23-Dec-14 24-Dec-14 Closed

    OPN:14\120023 workshop Fabrication of flue duct Aminat 20-Nov-14 22-Nov-14 Closed Design needed

    OPN:14\120024 Manpower Manpower inquiry (labor&painter) Aminat 27-Dec-14 29-Dec-14 29-Dec-14 On progress

    OPN:14\120025 Technical Catalyst Replacement JANA 03-Jan-15 On progress

    OPN:14\120026

    OPN:14\120027

    RFQS Tracking

    SITE VIST

    DATE

    RECEIVED

    DATECLIENTWORK DISCRIBTIONCategory S\N

    Third

    PartyStatus Remarks

    Work start

    date

    RequirmentsQUOTATION

    DATE

    Current Status

  • skarameR etaD tegraT snoitca tsaL sutatS noitcA / ssergorP / sliateD sevitcejbO / seitivitcA .oN

    4102/21/03 1

    4102/21/13 + afom 2

    3

    4102/21/13 + 4

    5 +

    + + 00045102/1/01

    4102/21/13 6

    05 7

    4102/21/925102/1/01

    8

    9

    001 41-rpA

    01

    /+

    + 5102/10/03 +

    -

    (

    ) ()

    11

    21

    4102/21/13 31

    41

    seussI noitcA - 5102 rof RG WTE

    /

  • Date:

    SL.#

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    December 31, 2014

    Averag

    e

    Poor

    Completion of w ork at the required level

    Completion of the required w ork in a timely manner

    Diligence and respond to the w ork pressure

    Arrangement and system in the w ork

    Entrepreneurship and innovation in the w ork

    Ability to w ork w ithout supervision

    Interest to development and improve the standard of w ork

    Accept guidance and criticism of Leaders

    Cooperation w ith colleagues

    Ability to take greater responsibility

    Ability to make decisions

    Bad

    Remarks

    Evaluation Factors

    Ability to observe the rules and w orking methods

    Compliance of procedures and w orking methods

    Exce

    llent

    Very G

    ood

    Good

    Flexibility and ability to adapt

    Loyalty to the company and maintain its interests

    Respect for others

    Appearance

    Personal conduct

    Maintaining the company's property

    Compliance of company Policies & Procedures

    Evaluation Rating Direct Supervisor Recommendation

    Excellent

    Very Good

    Good

    Average

    Poor

    Bad

    Direct Supervisors Signature

    90 - 100 Excellent

    Rating Evaluation

    5 0

    Total

    1 0 0

    75 89 Very Good 4 0 0

    55 74 Good 3 0 0

    0

    Evaluation Standards

    00 24 Bad 0 0 0

    Grand Total 0

    40 54 Average 2 0 0

    25 39 Poor

  • SL.# EVALUATION RATING REMARKS

    1 EXCELLENT (EX)ADDED VALUE IN IMPROVEMENTS AND EXCEED THE

    EXPECTATIONS

    2 VERY GOOD (V.G) MEET THE ABOVE REQUIREMENTS

    3 GOOD (G) MEET THE MINIMUM REQUIREMENTS

    4 AVERAGE(A) NEED IMPROVEMENTS IN VARIOUS AREAS

    5 POOR (P) NOT AT ALL MEET THE REQUIREMENTS

    6 BAD (B) VERY POOR PERFORMANCE

  • Excellent: Top Performer, clearly & consistently exceeds all his job requirements & very significantly

    contributes to the Company/Department results.

    Very Good:High Performer; exceeds most of his job requirements & significantly contributes to

    company/ department results.

    Good: Consistently meets all his job requirements.

    Average (A)

    Does not meet all his job requirements. Falls short in some of his job requirements.

    Needs more help from supervisor. NEED IMPROVEMENTS IN VARIOUS AREAS

    Poor:Does not meet most of his job minimum requirements. Needs corrective coaching and

    close supervision.

  • Thank You