etsav p iv_es1
DESCRIPTION
ETSAV P IV_ES1TRANSCRIPT
MULTIFUNCTIONAL METRO STATIONValencia
PROYECTOS IV - Taller HProf. Josè Manuel Barrera Puigdollers - Ana Maria Lozano
ETSAV 07 | 08
The new subway stop becomes the new gateway to the town of Paterna.The new building is configured as a concrete surface that through folding opera-tions organizes the different spaces of the station.From the entrance platform, a covered space hosts the ticket office and the access to the lines, toilets and facilities, municipal counters for basic citizens services; the path then underpasses the lines and getting out on surface it configures a large ramp that rises to form a large terrace with views over the sorrounding orange fields, with a panoramic cafè.Under the ramp cover are located the changing rooms, warehouses and facilities serving the bikeway and the urban gardens, while in the sorrounding areas there are the park, playgrounds, table tennis and bowls.Within the context of the new station are then introduced spaces and activities which are parallel at the classic train use. New types of spaces and activities are introduced within the context of the new station, creating parallel uses at the normal experience of train use.They reflect on type of use and user, waiting times and possible alternative activities, enhancing the potentialities of the station and making it a less marginal place, with a more complex and attractive urban role.
MULTIFUNCTIONAL METRO STATIONValencia
01 \ architecture * TERRITORIAL STRUCTURE
FIGURES
EMERGENCIES
GENERAL STRATEGY
rural pathway
abandoned factory
access to the (extra)urban existing routes
canalside pathway recovery
recuperacion fabrica abandonada porespacios publicos (aulas,talleres deartistas,actividades culturales...)
PROJECT IDEAS
DISTANCES
valencia
m
* PROGRAM* USES
1
5. reflexiones
estudiantesniños turistas jubiladostrabajadoresUSUARIOS
TIEMPO/ACTIVIDADES 5 min 15 min 30 min 60 min
6. estacion
huertos publicos(cultivacion / venda)
ping pong petanca bar / terraza
hormigon visto
madera
vidrio
plano general 1:2000
bar / terraza
depositos / vestuariostaquilla / wc
oficina
ping pong / petanca
bosque / parque
huerta urbana1
N
planta -1.00 m 1:500
planta +1.50 m 1:500
alzado este 1:300
alzado oeste 1:300
alzado norde 1:300
alzado sur 1:300
arboles
2007
2015TALLER H [ proyectos 4 ] alberto oss pegorar3 seccion 1 1:300
USERS children
5 mintable tennis
students
15 minbowls
tourists
30 mincafe/terrace
workers
60 minurban gardens(cultivation/sale)
pensioners
TIME/ACTIVITIES
offices
tickets / toilets
warehouse / lockers
bar / terrace
table tennis / bowls
urban gardens
wood / park
VEGETAL EVOLUTION
2007
2015 MASTERPLAN
5. reflexiones
estudiantesniños turistas jubiladostrabajadoresUSUARIOS
TIEMPO/ACTIVIDADES 5 min 15 min 30 min 60 min
6. estacion
huertos publicos(cultivacion / venda)
ping pong petanca bar / terraza
hormigon visto
madera
vidrio
plano general 1:2000
bar / terraza
depositos / vestuariostaquilla / wc
oficina
ping pong / petanca
bosque / parque
huerta urbana1
N
planta -1.00 m 1:500
planta +1.50 m 1:500
alzado este 1:300
alzado oeste 1:300
alzado norde 1:300
alzado sur 1:300
arboles
2007
2015TALLER H [ proyectos 4 ] alberto oss pegorar3 seccion 1 1:300