Estimate for construction of Bridge No. 141/2 on NH 37 Ref : Based on Tender Rate Item No. Particulars/Description of item Unit 1 2 3 4 5 A. Bridge No. 141/2 Foundation 1/12.10 Excavation for Structures (I) Ordenary Soil A. Manual means i) Upto 3m depth (with dewatering ) Cum ii) 3m to 6m depth (with dewatering ) Cum 2727.92 64.00 iii) Above 6m depth (with dewatering ) Cum 2/12.8 Cum 220.14 3633.00 3/12.8 H. RCC Grade M 35 Cum 552.57 4678.00 Case I-Using Concrete Mixer 4/12.40 T 80.35 46223.00 5/13.5 q) RCC Grade M35 I) High 5m to 10m Cum 279.68 6004.00 Case I : Using Concrete mixer 6/13.6(A) MT 55.40 46272.00 7/12.4 Cum 501.63 3093.00 Total Quantit y Rate in Rs. In Figures Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shorting and bracing, removal of stumps and other deleterious metter, dressing of sides and bottom and backfilling with approved material. as per MOSRT Clause Plain/Reinforced cement concrete in open foundation complete as per drawing and tachnical specification (A) PCC Grade M15 Open Foundation Plain/Reinforced cement concrete in open foundation complete as per drawing and tachnical specification Supplying, fitting and placing un-coated TMT CRS (Fe-500) bar reinforcment in foundation complete as per drawing and technical specification Plain/Reinforced cement concrete in Sub- Structure complete as per drawing and tachnical specification nO. 1500, 1700,& 2200 including providing plasticiser(Masterplast PL-1)/ equvalent, air entraining and water reducing plasticiser (Masterplast PAE)/equvalent conforming to IS-9103-1999 and as per specification and direction of Engineer Supplying, fitting and placing un-coated TMT CRS (Fe-500) bar reinforcment in sub- structure complete as per drawing and technical specification PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placced in foundation and compected by vibration including curing for 14 days)

Upload: bilal-ahmed-barbhuiya

Post on 17-Aug-2015

213 views

Category:

Documents


0 download

DESCRIPTION

estimate of a bridge

TRANSCRIPT

Estimate for construction of Bridge No. 141/2 on NH 37 Ref : Based on Tender RateItem No. Particulars/Description of item UnitRate in Rs.AmountIn Figures123 4 5 A.Bridge No. 141/2Foundation1/12.1! Eca!ation for "tructures "I# $r%enar& 'oilA. (anual meansi# Upto 3m %ept) "*it) %e*atering # +umii#3m to m %ept) "*it) %e*atering # +um2,2,.-2 4.!! 1,45..-iii# A/o0e m %ept) "*it) %e*atering # +um2/12..+um 22!.14 333.!! ,--,.2.243/12..1. R++ 2ra%e ( 35+um 552.5, 4,..!! 25.4-22.4+ase I3Using +oncrete (i4er4/12.4!5 .!.35 4223.!! 3,14!.,.2-5/13.56# R++ 2ra%e (35I# 1ig) 5m to 1!m+um 2,-.. !!4.!! 1,-2!2.1122+ase I 7 Using +oncrete mi4er /13."A#(5 55.4! 42,2.!! 2533,1.2..,/12.4+um 5!1.3 3!-3.!! 1551541.5-5otal 8uantit&Eca!ationfor"tructures"9art)*or:in e4ca0ationoffoun%ationofstructuresasper %ra*ingan%tec)nicalspecification;inclu%ing settingout;constructionofs)ortingan%/racing; remo0alofstumpsan%ot)er%eleteriousmetter; %ressingofsi%esan%/ottoman%/ac:filling*it) appro0e% material. as per ($'R5 +lause No. 3!4Plain/Reinforce%cementconcreteinopen foun%ationcompleteasper%ra*ingan%tac)nical specification "A# P++ 2ra%e (15$pen Foun%ation Plain/Reinforce%cementconcreteinopen foun%ationcompleteasper%ra*ingan%tac)nical specification 'uppl&ing;fittingan%placingun3coate%5(5+R' "Fe35!!# /ar reinforcment in foun%ation complete as per %ra*ing an% tec)nical specification Plain/Reinforce%cementconcretein'u/3'tructure complete as per %ra*ing an% tac)nical specification n$.15!!;1,!!;emec)anicall&mi4e%; placce%infoun%ationan%compecte%/&0i/ration inclu%ing curing for 14 %a&s#Item No. Particulars/Description of item UnitRate in Rs.AmountIn Figures123 4 5 5otal 8uantit&./14.1 "?#For so)id s)a* "u+er "tructure 1# 1ig)t upto 5m2# 1ig)t 5m to 1!m+um 3,1..! 3-,.!! 23,.4!4.!3# 1ig)t a/o0e 1!m 9. R++ 2ra%e (34! "for +ras) ?arrier#+ase I7 Using concrete (i4erFor T&*eam , s)a*- 2# 1ig)t 5m to 1!m+um 22.2 ,!14.!! 15.31.43-/14.2 "a#5 34.2. 4.2-2.!! 15554.341!/ana'6m 4-3.5! 3,4.!! 1.45-.!!11/14.1.Rm 4.5! .,.!! 55-21.5!Rm 4.5! 243.!! 15,3.5!Rm 4.5! 22!.!! 141-!.!!Rm 4.5! -.!! 5.!.5!Furnis)ingan%placingReinforce%/Prestresse% cementconcreteinsuperstructureasper%ra*ing an%tec)nicalspecificationinclu%ingpro0i%ing plasticiser"(asterplastP=31#;airentrainingan% *aterre%ucingplasticiser"(asterplastPA9# conformingtoI'3-1!331---an%asper specification an% %irection of 9ngineer in c)arge.?. R++ 2ra%e (325+ase I 7 Using concrete mi4er "a# 'uppl&ing; fitting an% placing 5(5 +R' "Fe35!!# /arreinforcmentin'uper3structureinclu%ing splicingcompleteasper%ra*ingan%tec)nical specification "a# 5A5A/'AI=?ituminous*earingcoat73Pro0i%ing?ituminous *earingcoursecomprisingoftac:coat*it) /itumenemulsionasper AP@D'$RitemNo.5.2 $$ *e)o2 Raft:3-..!J12.-J!.1K '1.342 $um"!.5L1.!#/2J1.,J3-..K '(.74' $um"!.5L1.3#/2J2.15J3-..K /3.43(7' $um1.3J!.3J3-..K 1'.'22 $um1.J!.3J3-..K 18.1(4 $um22(.144 $um3. R$$ in foundation: # & 3'$ut off 2a))2J3-..J!.25J1.5K 28./' $um2J12.4J!.25J1.5K 8.3 $umRaft ")a*3-..J12.-J1.!K '13.42 $um''2.'7 $um4. Reinforcement in Foundation %T#T $R" /(.(( Nos21. "ign *oard2J1.2J1..K 4.32 "=m2J1.3J!.5K 1.08 "=m22. Bou)der A++ron3J!.45J3-.3!K '3.('' $um5J!.45J3-.3!K //.42' $um3.5J!.45J3-.3!K 01./87' $um2(3.3/ $um23. $oncrete for $ras3 Barrier 2J!.24!J4,K 22.02 $um24. Hand Rai) for $ras3 Barrier 2J4,K 84 Rm94ecuti0e 9ngineer; P@D2u*a)ati N1 Di0ision; 2u*a)ati