Estimate for construction of Bridge No. 142/1 on NH 37 Ref : Based on Tender Rate Item No. Particulars/Description of item Unit 1 2 3 4 5 A. Bridge No. 142/1 Foundation 1/12.10 Excavation for Structures (I) Ordenary Soil A. Manual means i) Upto 3m depth (with dewatering ) Cum ii) 3m to 6m depth (with dewatering ) Cum 568.62 64.00 iii) Above 6m depth (with dewatering ) Cum Pile Foundation 2/12.39 Cum 26.24 4,018.00 3/12.38 Cum 291.92 4,727.00 Case I : Using Concrete mixer 4/12.25 Metre 506.00 10,283.00 5/12.40 MT 65.61 46,223.00 6/12.37 MT 1,019.00 274.00 Total Quantity Rate in Rs. In Figures excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shorting and bracing, removal of stumps and other deleterious metter, dressing of sides and bottom and backfilling with approved material. as per MOSRT Clause No. 304 Levelling course for pile capas per drawing and tachnical specification MORTH Cement concrete for Reinforced concrete in pile cap complete as per drawing and technical specifications of MORTH Clouse No. 1100,1600 & 1700 as per specification and direction Pile Cap I) RCC M-35 grade Bored cast-in-situ M35 Grade RCC pile excluding reinforcement complete as per drawing and technical specification cl. No. 1100 & 1700 and removal of excavated earth with all lifts and lead upto 1000m.as per specification and direction (Pile Dia= 1200mm) (a) Supplying, fitting and placing un- coated TMT CRS (Fe-500) bar reinforcment in foundation complete as per drawing and technical specification of MORTH section Pile load test on single vertical pile in accordience with IS: 219 (part-IV) as per and technical specification of MORTH section no 1100.

Upload: bilal-ahmed-barbhuiya

Post on 17-Aug-2015

219 views

Category:

Documents


0 download

DESCRIPTION

bridge estimate

TRANSCRIPT

Estimate for construction of Bridge No. 142/1 on NH 37 Ref : Based on Tender RateItem No. Particulars/Description of item UnitRate in Rs.In Figures1 2 3 4 5A.Bridge No. 142/1Foundation1/12.10Eca!ation for "tructures I! "r#enar$ %oil&. 'anual meansi! Upto 3m #ept( )it( #e)atering ! *umii!3m to +m #ept( )it( #e)atering ! *um5+,.+2 +4.00iii! &-o.e +m #ept( )it( #e)atering ! *um#i$e Foundation2/12.3/*um 2+.24 4001,.003/12.3,*um 2/1./2 40121.00%ase & : 'sing %oncrete mier 4/12.25'etre50+.00 1002,3.005/12.40'2 +5.+1 4+0223.00+/12.31'2 1001/.00 214.002otal 3uantit$Eca!ationfor"tructures4art()or5in e6ca.ationoffoun#ationofstructuresasper #ra)ingan#tec(nicalspecification0inclu#ing settingout0constructionofs(ortingan#-racing0 remo.alofstumpsan#ot(er#eleteriousmetter0 #ressingofsi#esan#-ottoman#-ac5filling)it( appro.e# material. as per '"%R2 *lause No. 304(e!e$$ingcourseforpilecapasper#ra)ingan# tac(nical specification '"R27 no. 110008 1100 %ement concrete for Reinforce# concrete in pile cap complete as per #ra)ing an# tec(nical specifications of '"R27 *louse No. 110001+00 8 1100 as per specification an# #irection of engineer in c(arge.#i$e %a)I! R** *+3, gra#e9ore#cast:in:situ'35;ra#eR**pilee6clu#ing reinforcementcompleteasper#ra)ingan# tec(nicalspecificationcl.No.110081100an# remo.alofe6ca.ate#eart()it(allliftsan#lea# upto1000m.asperspecificationan##irectionof engineer in c(arge.Pile Dia< 12--mm!a!%uppl$ing0fittingan#placingun:coate#2'2 *R%Fe:500!-arreinforcmentinfoun#ation complete as per #ra)ing an# tec(nical specification of '"R27 section no 1+00 #i$e$oadtestonsingle.erticalpileinaccor#ience )it(I%=21/part:I>!asperan#tec(nical specification of '"R27 section no 1100.a! Initial an# Routine loa# testItem No. Particulars/Description of item UnitRate in Rs.In Figures1 2 3 4 52otal 3uantit$"u. "tructure1/13.57! R** ;ra#e '35 I! 7ig( upto 5.0 m *ase I = Using *oncrete mi6er II! 7ig( upto 10m *ase I = Using concrete mi6er *um 15/.0+ +0004.00,/13.+&!'2 31.10 4+0212.00//13.14*m. 2150040.00 1.00%uperstructure9. R** ;ra#e ':25*ase = I Using *oncrete mi6er For 2 9eam an# %la-02! 7ig(t a-o.e 10.0m*um 2,3.10 +0+43.00For T Beam and "$a./*om 14.14 10014.002! 7ig(t upto 5.0m to 10.0m11/14.2 a!'2 4,.0/ 4,02/2.0012/&na%?m 421.14 314.00Plain/Reinforce#cementconcretein%u-:%tructure completeasper#ra)ingan#tac(nical specificationsplasticiser'asterplastP@:1!/ e?u.alent0airentrainingan#)aterre#ucing plasticiser 'asterplast P&4!/e?u.alentconforming toI%:/103:1///an#asperspecificationan# #irection of 4ngineer in c(arge. %uppl$ing0fittingan#placingun:coate#T*T%R" 0Fe+,--! -ar reinforcment in su-:structure complete as per #ra)ing an# tec(nical specification %uppl$ing0fittingan#fi6inginpositiontruetoline an#le.elelastomeric-earingconformingtoIR*= ,3pt:III!sectionIAan#clause2005of'o7R2 specificationscompleteinclu#ingallaccessories asper#ra)ingan#tec(nicalspecificationasper '"R27 section 200002200.10/14.1 Furnis(ingan#placingReinforce#/Prestresse# cementconcreteinsuperstructureasper#ra)ing an#tec(nicalspecificationBcl.no.150001+008 1100 inclu#ing pro.i#ing plasticiser 'asterplast P@:1!0airentrainingan#)aterre#ucingplasticiser 'asterplastP&4!*onformingtoI%:/103:1///as per specification an# #irection of 4ngineer in c(arge 4. R** ;ra#e ':40 for cras( 9arrier!*ase I = Using concrete mi6er a! %uppl$ing0 fitting an# placing 2'2 *R% Fe:500! -arreinforcmentin%uper:structureinclu#ing splicingcompleteasper#ra)ingan#tec(nical specification a! 2&2&/%&I@9ituminous)earingcoat=:Pro.i#ing9ituminous )earingcoursecomprisingoftac5coat)it( -itumenemulsionasper &PCD%"RitemNo.5.2 8'"%R287specificationno.503D+mmt(ic5 mastic &sp(alt as per &PCD %"R I24' N". 14.5 8 '"%R287 specification no. 51582102 an# 2 la$ers of 25mm t(ic5 &sp(altic concrete consisting of close gra#e#premi6surfacing*;P%!materials)it( t$pe:a aggregates as per &PCD %"R item no. 5.11 8'"%R287specificationno.5120inclu#ingall lea# 8 lift complete as #irecte#.Item No. Particulars/Description of item UnitRate in Rs.In Figures1 2 3 4 52otal 3uantit$13/14.22metre 2/.+0 100141.0014/14.+Rm +2.4, 10211.0015/14./Nos ,.00 50,,,.001+/13./*um 110.40 ,1/.0011/14.10*um 25.5+ 401+/.001,/13.,Nos 3+.00 ,2.001//14.11*um 12.1, ,003+.0020/14.1+%?m 141./4 2+.00Pro.i#ingan#la$ingofa"tri)"ea$E)ansion 1ointcateringtoma6imum(oriEontalmo.ement upto 10mm0 complete as per appro.e# #ra)ing an# tec(nicalspecificationsclauseNo2+01to-e installe#-$t(emanufacturer/supplierort(eir aut(orise#representati.eensuringcomplianceto t(e manufacturers inrtructions for installation*onstruction of pre cast R%% rai$$ing of '30 gra#e0 aggregatesiEenote6cee#ing12mm0truelinean# gra#e0 tolerance of .ertical R** post not to e6cee# 1in500centertocenterspacing-et)een.ertical postnottoe6cee#2000mmlea.inga#e?uate space-et)een.erticalpostfore6pansion0 *ompleteasper#ra)ingan#tec(nical specificationsclausesofsection21030150001+00 81100of'o%R287specificationofRoa#san# 9ri#ge Cor5s for superstructure )or5s.Pro.i#ing2rainage")outscompleteasper #ra)ingan#tec(nicalspecificationsclauses2105 of '"R27 specification of Roa#s an# 9ri#ge Cor5s for superstructure )or5s.Bac3Fi$$ing-e(in#a-utment0)ing)allan#retirn )allcomplete as per #ra)ing an# clauseno 2+01 of 'o%R287 %pecification &! ;ranular 'aterialPcc'15;ra#e$e!e$ingcourse-elo)approc( sla-completeinclu#ingallaccessoriesasper #ra)ingan#tec(nicalspecificationsasper '"%R27 section 2100Pro.i#ing4ee)5o$esin-ric5 masorn$/plain/Reinforce#concretea-utment0)ing )all/return)all)it(100m#ia&*pipe0e6ten#ing t(roug(t(efull)i#t(oft(estructure)it(slopeof 1>=207to)ar#s#rra)ingforce0completeasper appro.e# #ra)ing an# tec(nical specification clause 210+ 8 2200 of '"R27 %pecification.R**a))roc5s$a.inclu#ingreinforcementan# form)or5completeasper#ra)ingan#tec(nical specificationsclauses150001+000110082104of '"R27specificationofRoa#san#9ri#geCor5s for superstructure )or5s.Painting on *oncrete surface Pro.ing an# appl$ing 2 coats of )ater -ase# cement paint to unplastere# concretesurfaceaftercleaningt(esurfaceof#irt0 #ust0oil0grease0enfflorescencean#appl$ingpaint F of 1 liter for 2 s?.m.!Item No. Particulars/Description of item UnitRate in Rs.In Figures1 2 3 4 52otal 3uantit$2+/&nna Rm +1.2, 10341.00Tota$ 6 Rs."a7 Rs.46ecuti.e 4ngineer0 PCD;u)a(ati N7 Di.ision0 ;u)a(atiHand Rai$Pro.i#ingan#fi6ing(an#railo.ert(ecras(-arrier consisting of '% -ase plate0 em-e#e# fastener an# nuts0 '%.erticalplatesan#pipeetc.ass(o)nint(e#ra)ing an#asperspecifications0&llt(erailingcomponentsas mantione#a-o.eto-e(ot#ipgal.anis(e#)it(aEinc coatingofatleast115gm/s?mt(et(ic5nesst(eplatesto -eas s(o)nint(e#ra)ings an#pipe to-e +5N9(ea.$ class)it(a)eig(tnotlesst(an1.2/Gg/man# conforming to I%= 11+1:1/1/. Item to inclu#e all inci#ental )or5sre?uire#tocompletet(e)or5as#irecte#-$t(e 4ngineer:in:c(arge.'anagements(all-ema#efort(e lengt( of t(e pipe onl$Estimate for construction of Bridge No. 142/1 on NH 37 Ref : Based on Tender Rate&mount+Bridge No. 142/1Foundation3+03/1.+,105044,.3/1031/0/24.155020301/,.00300320,02.2421/020+.00&mount+/540/+/.5,1014402,0.312150040.0010,,00+33.301030414.1/203220145./31510130.1+&mount+3000113.+01/0412.0,410104.005,10,11.+010+055/.+420/52.001020100.0,30,4+.34&mount+,20544.1+18/722/298.9818/722/29946ecuti.e 4ngineer0 PCD;u)a(ati N7 Di.ision0 ;u)a(atiA.sract :f %ost Name of ;or3: Estimate for construction of 'nder)ass on