  • 8/10/2019 Estimate of Duct for OFC

    1/12

    PCC 1:2.5:5

    1 E/W 1 CUM

    2 PCC 1:3:6 1 CUM

    3 PCC 1:2.5:5 2 CUM

    2 CUM

    CUM

    DEDUCTION:-2

    NET QTY. CUM

    4 P/L RCC 1:1.5:3

    1 CUM

    Executive Engineer

    Nalagarh Division

    HPPWD Nalagarh

    0.15

    0.60

    0.40

    TYPICAL SECTION OF RCC DUCT ALONGWITH C.C. CHAMBER FOR LAYING OF OFC BY VARIOUS TELECOM AGENCIES

    1.60 1.60 1.20 3.07

    1.60

    0.

    20

    0.

    90

    0.

    20

    DETAIL OF QTY. FOR ONE CHAMBER

    CUM

    0.9 0.2 1.00 0.36

    0.113

    1.60 1.60 0.15 0.38

    1.30 0.20 1.00 0.52

    0.77

    1.30 1.30 0.10 0.17

    0.88

    3.14 0.30 0.20

    CC 1:3:6

    500 MM DIA HUME PIPE 500 MM DIA HUME PIPE

  • 8/10/2019 Estimate of Duct for OFC

    2/12

  • 8/10/2019 Estimate of Duct for OFC

    3/12

    S.No. Description of Item No Length Breadth Height Qty

    1 Excavation of earth work and disposal of

    all excavated earth upto a lead of 20

    mtr. and lift upto 1.50 mtr

    PCC Chambers 18 3.07 55.26

    Excavation for pipes

    0/0 to 4/200

    4200-(18X0.90)= 4183.80 MTR. 1 4183.80 0.60 1.00 2510.28

    Total 2565.54

    cum

    2 P/L PCC 1:3:6 18 0.38 6.84

    Total 6.84

    cum

    3 P/L PCC 1:2.5:5 18 0.77 13.86

    Total 13.86

    cum

    4 P/L RCC 1:1.5:3 18 0.17 3.06

    Total 3.06

    cum5 Providing tor steel reinforcement

    3.06 cum @ 90 kg/ cum 3.06 90.00 275.40

    kg

    Total 275.40kg

    or 0.275 MT

    6 P/L Hume pipe 500 mm dia with 1st

    class bedding

    0/0 TO 4/0

    4000-(17X0.90)= 3984.70 MTR. 1 4183.80 4183.80

    Total 4183.80

    Rmt

    7 P/L WBM G-I

    0/0 to 1/0 1 1000 0.60 0.10 60.00

    On T-junctions 12 10.00 0.60 0.10 7.20

    Total 67.20

    8 P/L WBM G-II cum

    0/0 to 1/0 1 1000 0.60 0.08 45.00

    On T-junctions 12 10.00 0.60 0.075 5.40

    Total 50.40

    cum

    9 P/L WBM G-III

    0/0 to 1/0 1 1000 0.60 0.08 45.00

    On T-junctions 12 10.00 0.60 0.075 5.40

    Total 50.40

    cum

    (qty as per drawing attached)

    DETAIL OF MEASUREMENT

    NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR

    LAYING OF OFC BY VARIOUS TELECOM AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO

    4/200

    (qty as per drawing attached)

    (qty as per drawing attached)

    (qty as per drawing attached)

  • 8/10/2019 Estimate of Duct for OFC

    4/12

    S.No. Description of Item No Length Breadth Height Qty

    1 2 3 4 5 6 7

    10 P/A tack/priming coat @1kg/sqm

    On T-junctions 12 10.00 0.60 72.00

    0/0 to 1/0 1 1000 0.60 600.00

    Total 672.00

    sqm

    11 P/L bitumen macadamOn T-junctions 12 10.00 0.60 0.05 3.60

    0/0 to 1/0 1 1000 0.60 0.05 30.00

    Total 33.60

    cum

    12 2 cm consolidated thick premix

    carpet

    On T-junctions 12 10.00 0.60 72.00

    0/0 to 1/0 1 1000 0.60 600.00

    Total 672.00

    sqm

    13 Providing seal coatcarpet

    On T-junctions 12 10.00 0.60 72.00

    0/0 to 1/0 1 1000 0.60 600.00

    Total 672.00

    sqm

  • 8/10/2019 Estimate of Duct for OFC

    5/12

    .No DESCRIPTION OF ITEMS Rates Unit Amount Rates Am

    1 Earthwork in excavation for structures as per drawing and technicalspecifications Clause 305.1 including setting out, construction of shoring and

    bracing, removal of stumps and other deleterious material and disposal upto a

    lead of 50 m, dressing of sides and bottom and backfilling in trenches with

    excavated suitable material. Ordinary soils2565.54 cum 128.15 Cum 328774 21.45

    2 Providing concrete for plain/reinforced concrete in open foundations completeas per drawings and technical specifications Clause 802, 803, 1202 & 1203(

    P.C.C grade M 10) (1:3:6) 6.84 cum 2928.35 Cum 20030 346.10

    3 Plain/reinforced cement concrete in substructure complete as per drawingsand technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

    (P.C.C grade M 15) 13.86 cum 2,997.70 Cum 41548 346.10

    4 Providing concrete for plain/reinforced concrete in open foundations completeas per drawings and technical specifications Clause 802, 803, 1202 & 1203

    (R.C.C. grade M 25 1:1/1/2:3) 3.06 cum 3,949.40 Cum 12085 367.05

    5 Supplying, fitting and placingTMT bar reinforcement in foundation complete asper drawings and technical specifications Clauses 1000 and 1202

    0.275 MT 64142.8 MT 17639 1,376.80

    6 Laying Cement Concrete Pipe NP2 (burried conduits) on first class bedding ofgranular material including fixing collar with cement sand mortar 1:2 but

    excluding excavation, protection works, backfilling, concrete and masonarywork in head wall and parapets

    4183.8 Rmt 756.30 Rmt 3164208 21.45

    7 Providing laying, spreading and compacting stone aggregates of specific sizesto water bound macadam specification including spreading in uniform

    thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages

    to proper grade and camper applying and brooming, stone screening /binding

    materials to fill-up the interstices of coarse aggregate, watering and compactly

    to the required density grading-I as per Technical Specification Clause 405

    (four hundred five) (A) By Manual Means, including carriage of all labour,

    equipments and materials to various locations through all modes of

    transportation in all leads, lifts and all incidental charges.

    67.2 cum 957.75 Cum 64361

    Total carried over

    3648645 1

    Labour Ra

    ABSTRACT OF COST

    Quantity

    AME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC BY

    ARIOUS TELECOM AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200

    Through Rate

  • 8/10/2019 Estimate of Duct for OFC

    6/12

    .No

    .

    DESCRIPTION OF ITEMS Rates Unit Amount

    (Rs.)

    Rates A

    3648645

    8 Providing laying, spreading and compacting stone aggregates of specific sizesto water bound macadam specification including spreading in uniform

    thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages

    to proper grade and camper applying and brooming, stone screening /binding

    materials to fill-up the interstices of coarse aggregate, watering and compactly

    to the required density grading-II as per Technical Specification Clause 405

    (four hundred five) (A) By Manual Means, including carriage of all labour,

    equipments and materials to various locations through all modes of

    transportation in all leads, lifts and all incidental charges.

    50.40 cum 1,015.70 Cum 51191.28

    9 Providing laying, spreading and compacting stone aggregates of specific sizesto water bound macadam specification including spreading in uniform

    thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages

    to proper grade and camper applying and brooming, stone screening /binding

    materials to fill-up the interstices of coarse aggregate, watering and compactly

    to the required density grading-III as per Technical Specification Clause 405

    (four hundred five) (A) By Manual Means, including carriage of all labour,

    equipments and materials to various locations through all modes of

    transportation in all leads, lifts and all incidental charges.

    50.40 cum 995.50 cum 50173.2

    10 Providing and applying primer coat with bitumen VG-10 on prepared surface ofgranular base including cleaning of road surface and spraying primer at therate of 10 kg/10 sqm using mechanical means as per Technical Specification

    Clause 502 (five hundred two) , including carriage of all labour, equipments

    and materials to various locations through all modes of transportation in all

    leads, lifts and all incidental charges.

    672.00 Sqm 70.05 sqm 47074

    Total carried over 3797083

    Quantity

  • 8/10/2019 Estimate of Duct for OFC

    7/12

    .No

    .

    DESCRIPTION OF ITEMS Rates Unit Amount

    Rs.

    Rates A

    3797083 1

    11 Providing and laying bituminous macadam with hot mix plant using crushedaggregates of grading as per Table 500.4 premixed with bituminous binder,

    transported to site upto a lead of 1000 m laid over a previously prepared

    surface with paver finisher to the required grade, level and alignment and

    rolled to achieve the desired compaction as per Technical Specification 33.60 cum 5,882.75 cum 197660

    12 Providing and Laying and rolling of open graded premix carpet 20 (twenty)millimeters thickness composed of 13.2 mm to 5.6 mm (thirteen point two

    millimeters to five point Six millimeters) aggregates either using penetration

    grade bitumen S-Ninety (S-90) to required line, grade and level to serve as

    wearing course on a previously prepared base, including mixing in a suitable

    plant, laying and rolling with a three wheel 80-100 kN( Eighty to one hundred

    kN) static roller capacity, finished to required level and grades to be followed

    by seal coat of type B as per Technical Specification Clause 508 (Five

    hundred Eight), including carriage of all labour, equipments and materials to

    various locations through all modes of transportation in all leads, lifts and all

    incidental charges. 672.00 Sqm 125.20 sqm 84134

    13 Providing and laying seal coat sealing the voids in a bituminous surface laid tothe specified levels, grades and cross fall using TypeA, TypeB and Type -

    C as per Technical Specification Clause 510 (five hundred ten) By Manual

    Means, bitumen S-Ninety (S-90), including carriage of all labour,

    equipments and materials to various locations through all modes of

    transportation in all leads, lifts and all incidental charges. 672.00 Sqm 47.30 sqm 31786

    Total 4110664 1Add @ 20% Labour Enhancement Rs. 180248/- 30,688

    Add extra cost of material as per annexure 'B' 538810

    Add extra cost of carriage material as per annexure 'A' 386936

    5067098

    Add 3% contingency charges 152012.93

    GRAND TOTAL 5219110

    say Rs 52.19 lacs

    Executive Engineer

    Nalagarh Division

    HPPWD Nalagarh

    Quantity

  • 8/10/2019 Estimate of Duct for OFC

    8/12

  • 8/10/2019 Estimate of Duct for OFC

    9/12

    64,142.80

  • 8/10/2019 Estimate of Duct for OFC

    10/12

    S NO DESCRIPTION OF ITEMS QTY UNIT MARKET RATE AMOUNT

    1 CEMENT 6.19 MT 5900 36521

    2 SAND 15.18 CUM 525 7970

    3 AGGRGATE 40 mm & Below 73.19 CUM 725 53063

    4 TOR STEEL 294 KG 48 14112

    5 G-I 89.37 CUM 780 69709

    6 G-II 67.03 CUM 800 53624

    7 G-III 67.03 CUM 850 56976

    8 BITUMEN 5.07 MT 44500 225615

    9 RCC Hume Pipe 500 MM dia 4183.8 RMT 700 2928660

    TOTAL 3446248

    EXTRA COST OF MATERIALNAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBE

    AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0

  • 8/10/2019 Estimate of Duct for OFC

    11/12

    ANNEXURE-B

    S. No. Description of Items

    HPSR 2009 AMOUNT DIFFERENCE 1 PCC 1:3:6 (40 mm nominal size) 6.84 cum

    4900 30331 6190

    300 4554 3416 2 PCC 1:2.5:5 (20 mm nominal size) 13.84 cum

    440 32204 20859

    45 13230 882 3 PCC 1:1.5.:3 (20 mm nominal size) 3.06 cum

    400 35748 33961

    430 28823 24801 4 PROVIDING TOR STEEL 0.28 MT

    440 29493 27482

    43940 222776 2839 5 PROVIDING 500 MM HUME PIPE 4183.80 RMT

    600 2510280 418380

    6 P/L WBM G-I 67.20 CUM

    2907439 538810 7 P/L WBM G-I 50.40 CUM

    8 P/L WBM G-I 50.40 CUM

    9 P/A TACK COAT 672.00 SQM

    Executive Engineer 10 BM 50 MM THICK 33.60 cum

    Nalagarh Division

    HPPWD Nalagarh 11 2 CM PC 672.00 SQM

    12 SEAL COAT 672.00 SQM

    TOTAL

    C

    NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT

    AGENCIES ON BAD

    Unit

    FOR LAYING OF OFC BY VARIOUS TELECOM

    TO 4/200

  • 8/10/2019 Estimate of Duct for OFC

    12/12

    Sand C.A. 40

    mm &

    cement BITUMEN G-I G-II G-III RCC PIPES

    500 MM

    STEEL

    3.215 6.088 30.10

    6.505 12.318 69.20

    1.438 2.723 24.48

    0.294

    1743

    89.376

    67.032

    67.032

    672

    33.60 2956.8

    19.44 981.12

    4.032 456.96

    15.190 74.169 123.78 5066.88 89.376 67.032 67.032 1743 0.294

    CUM CUM BAGS KG CUM CUM CUM NOS MT

    6.19 MT 5.07 MT

    MT

    ONSUMPTION OF MATERIAL

    00 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC BY VARIOUS TELECOM

    DI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200

    Consumption of material