Estimate made easy
Designed by Er. Navin, Executive Engineer, CPWD
Preparing estimate for large building is a tedious job and it
takes lots of time in working out details measurement and finally
getting estimate. My little endeavor is to cut this time to very less (sayone tenth) so that one can easily even check as well as reframe
estimate if some items changed at advanced stage. This will be aHandy tool for ivil !ngineer using "#$ %&&'.
These programs also have fair degree of accuracy so the basic
problem of "eviation during eecution as well as !tra item alsominimied. *nd thus in fructuous work load of offices can be cut
down.
+ormally one working day is suffice to prepare any estimateof large building.
This #oftware onsist of ,ive ecel files
Data2007.xls, inter_flr!.xls, inter_flr2.xls,
inter_flr".xls, inter_flr#.xls
$dule used in Prgramming-
!. D%&%2002'Enter data in blue cell nly. Calculates fr (rund)lr and *f f +uilding.
%. $ain - !nter#elect data for basic item selected if it is to
be used else make it blank by deleting this. Never use cutcmmand.
+. data - ,irst of *ll hange #ies of door/ window/ventilator as per *rchitectural "rawing. Then change #ies of
olumn/ 0eams / ,ooting/ if re1uired for your project asthese values will be used in further calculations and the same
will be available in all stage after where it will re1uired.
C' DW' !nter "#$ ode of "oor n 2indow3s frame/ shutteraccordingly
D' $isc- Miscellaneous data which are in +os like 2 Pan/
0asin/ Towel $ail/ 45 Pipes etc. which have no links withmeasurment or which are not considered in main item/ to be
entered along with "#$ ode/ 1uantity in this sheet.E' Nn c-edule tem'6ou an also enter +on #cheduleitem in #ub Head %7.& and 1uantity in 8Misc9 2orksheet
)' final estimate- This sheet will give you final result. #o nochange re1uired in this sheet.
%. 5nter:floor;
-
7/25/2019 Estimate made easy.docx
2/2
items f flr.
%. Plan' enter + if some floor is not re1uired at this levelelse leave it blank. hange code of ,looring/ =ocation of
2all whether !ternal or internal / Type of wall whether ,/
H/ P for ,ull/ Half/ Plaster accordingly.
+' Dr /ind/- ' !nter "#$ ode of "oor n 2indow3s
frame/ shutter accordingly.
5f same data to be used for second floor n third ,loor thenclick on 0utton provided for this else enter or edit data now
in inter floor%.ls and inter:floor>.ls files.
". %fter cmleting all t-ese stes cme bac1 t s-eet23 f
data20023 t-ere is t-ree lin1s
a. %ssign l. N.lick to assign sl. +o. for which 1uantity is
more than ero on page "#$.
b. Preare estimate- lick to prepare final estimate. lick
delete old sheet when asked.
c. Print &ec-nical anctin- click to print final T# in Properformat..
,or any help or suggestion please mail me to
navinandit4ya-.cm
?r call &>@>;%@'B/ %@'