SCHEDULE OF RATES FOR BUILDING WORKS FOR PUBLIC WORKSDEPARTMENT IN FORCE FROM 01-06-2009
S.No. PARTICULARS UNIT QTY RATE AMOUNT
1 Surface dressing of the ground including removingvegetation and making up undulations and in-equalitiesnot exceeding 15 cms in depth/ height includingdisposal of rubbish upto 1.5 m lift and lead upto 50m (atleast 5m aa! from the dressed area".
(#tem no. 1.$" Sqm 1050.00 %.15 %&5'.50
2 xcavation for all t!pes and si)es of foundations*trenches and drains or for an! other purpose includingdisposal of excavated stuff upto 1.5 m lift and lead upto
50m (at least 5m aa! from the excavated area"*including dressing and leveling of pits.
#n all t!pes of soil
(#tem no. 1.1.1" +um ,'5.'0 11$.,0 ,'',.
xtra for ever! additional lift of 1.5 m or part thereof.
#n all t!pes of soil
(#tem no. 1..1" +um &50.$, 15.&0 5&5.$,
roviding and la!ing nominal mix cement concrete ithcrushed stone aggregate using concrete mixer infoundation* plinth and at ground level excluding cost ofform ork.
1%, (1 cement % coarse sand , graded stoneaggregate %0mm nominal si)e".
(#tem no. &.1.$" +um 1'%.%% $051.00 &5'',0.0&
! roviding and la!ing nominal mix reinforcement cementconcrete ith crushed stone aggregate using concretemixer in all orks upto floor five level excluding cost ofreinforcement and form ork.
11& (1 cement 1 coarse sand & graded stoneaggregate $0mm nominal si)e".
(#tem no. &.%.$" +um 1&.$, &$0.0 $01,$&1.0'
-
7/26/2019 Estimate guide
2/60
" roviding and fixing formork including centering*shuttering* strutting* staging* propping bracing etc.complete and including its removal at all levels* for
2oundations* footings* base of columns and plinth beamin an! shape and si)e.
(#tem no. $.1.1" Sqm '&.0, '&.,0 %'&.&0
+olumns* illars* iers and likes- rectangular or squarein shape
(#tem no. $.1." Sqm 1$15.00 1,&.50 $$$5$.50
Suspended floors* roofs* access platform* balconies(plain surfaces" and shelves (cast in situ"
(#tem no. $.1.," Sqm 1,&.1& 1%'.&5 $'05.
3eams* lintels* cantilevers 4 alls
(#tem no. $.1." Sqm 11%0.0 1&.'5 1550&.$1
Stair cases of all t!pes excluding spiral and folded platet!pe* including risers and landings
(#tem no. $.1.1" Sqm 1'.', 1&.,0 $'%,1.55
6 roviding and placing in position reinforcement for.+.+. ork including straightening* cutting* bending*binding etc. complete as per draings including cost ofbinding ire all complete
6hermo-7echanicall! treated bars
(#tem no. &.1%.1" 8g 1%00.00 %.,0 $,'&5$0.00
# roviding and filling in plinth ith sand/ +rusher dustand hard moorum under floor in la!ers not exceeding$0cm in depth consolidating each deposited la!er b!ramming and atering* including dressing etc.complete.
(#tem no. 1.1," cum 151'.5 &1.'5 %,0.1
$ 3rick ork ith modular ell burnt cla! bricks ofcrushing strength not less than $5 kg/sqcm and aterabsorption not more than $09 in foundation and plinthin
+ement 7ortar 1 (1 +ement +oarse Sand"
(#tem no. '.$.$" +um %,. $%'.0 1$0'%$.,,
S.No. PARTICULARS UNIT QTY RATE AMOUNT
-
7/26/2019 Estimate guide
3/60
9 roviding and la!ing damp proof course (upto 50mmthick" ith plain cement concrete 1$% (1 cement $coarse sand % graded crushed stone aggregate $0mmnominal si)e" including formork.
(#tem no. &.1'" +um $.'1 &&$1.'0 ,1.,%
10 :ppl!ing a coat of hot bitumen &0/%0 using ; 1.'kg/sqm on damp proof course after cleaning the surfaceith brushes and finall! ith a piece of cloth lightl!soaked in kerosene oil.
(#tem no. '.5.1" Sqm 5%.1% ',.,5 %$,.%
11 3rick ork ith modular ell burnt cla! bricks ofcrushing strength not less than $5 kg/sqcm and aterabsorption not more than $09 in Superstructure
+ement 7ortar 1 (1 +ement +oarse Sand"
(#tem no. '.5.1" +um %,.'$ $'01.$5 1&1%'5'.,0
12
-
7/26/2019 Estimate guide
4/60
S.No. PARTICULARS UNIT QTY RATE AMOUNT
1"
roviding and fixing aluminium ork for doors*indos* ventilators and partitions made out ofextruded aluminium standard sections (main sectionith minimum 1.5mm thickness" conforming to #S '&&*
#S 1$,5 mitred and =ointed mechanicall! includingaluminium cleats* neoprene eather stripping gasketbeveled edge beading* scres dul! fixed in all/ floorith fixing clips or hold fasteners or bolts and nuts asrequired aluminium sections shall be anodi)edtransparent or d!ed to approved shade according to #S1,,* minimum anodic coating shall be of grade :+-15.(>la)ing and panelling to be paid for separatel!
2or shutter of doors* indos 4 ventilators includingproviding and making provision for fixing of fittingherever required including the cost of ?+/ neoprenegasket required (2ittings shall be paid for separatel!".
(#tem no. .%5.$" 8g 1$&.,% $0.10 &5''.5,
16 roviding and fixing gla)ing in aluminium door* indo*
ventilator shutters and partitions etc. ith ?+/neoprene gasket etc. complete. (+ost of aluminiumsnap beading shall be paid in basic item"
@ith float glass panes of % mm thickness
(#tem no. .%.1" Sqm 15%., %%.50 '&'.1
-
7/26/2019 Estimate guide
5/60
S.No. PARTICULARS UNIT QTY RATE AMOUNT
1# roviding and fixing &0mm thick factor! made panel?+ door shutter consisting of frame made out of 7.S.tubes of 1 gauge thickness and si)e of 1mm x 1mmfor st!les and 15x15mm for top 4 bottom rails. 7.S.frame shall have a coat of steel primers of approvedmake and manufacture . 7.S. frame covered ith 5mmthick heat moulded ?+ A+A channel of si)e &0mmthickness* '0mm idth out of hich 50mm shall be flatand $0mm shall be tapered in %5degree angle on eitherside forming st!lesB and 5mm thick* 5mm ide ?+sheet out of hich '5mm shall be flat and $0mm shallbe tapered in %5 degree on the inner side to form topand bottom rail and 115mm ide ?+ sheet out ofhich '5mm shall be flat and $0mm shall be tapered onboth sides to form lock rail. 6op* bottom and lock railsshall be provided either side of the panel. 10mm (5mmx $ " thick* $0mm ide cross ?+ sheet be provided asgap insert for top rail 4 bottom rail. paneling of 5mmthick both side ?+ sheet to be fitted in the 7.S. frame
elded/ sealed to the st!les 4 rails ith 'mm(5mmC$mm" thick x 15mm ide ?+ sheet beading oninner side* and =oined together ith solvent cementadhesive. :n additional 5mm thick ?+ strip of $0mmidth is to be stuck on the interior side of the A+A+hannel using ?+ solvent adhesive etc. complete asper 7anufacturerDs specification including & nos #S#marked stainless steel hinges of si)e 100x5,x1. mmcomplete. (for @.+. and bathroom door shutter".
3oth side re-laminated panel ?+ door shutter(#tem no. ,.15,.$" Sqm 1,.0 $5%.'0 %,%'$.,&
1$ roviding and fixing S.S. finished brass butt hinges ithnecessar! S.S. finished 7S scres complete
1$5x,5x5.50 mm (
-
7/26/2019 Estimate guide
6/60
$50x1x5mm
(#tem no. ,.,.$" ach 1$%.00 $,'.&0 &5$5.$0
21 roviding and fixing S.S. finished brass handle ithnecessar! S.S. finished 7S scres complete
1$5 mm
(#tem no. ,.&.1" ach 1$%.00 5.5 '&.0
22 roviding and fixing 150mm S.S. finished brass floordoor stoppers ith rubber cushion ith necessar! S.S.finished 7S scres to suit thickness of shutters.
(#tem no. ,." ach $.00 '.%5 %$5.0
2 roviding and fixing S.S. finished brass toer bolts(3arrel t!pe" ith necessar! S.S. finished 7S screscomplete
$00 x10mm(#tem no. ,.0.$" ach %1.00 $5.50 1051.50
150 x 10 mm
(#tem no. ,.0.&" ach $1.00 1%.15 %0''.15
2! roviding and fixing both side polished &0 mm thick:E#7 S:FG S6HF shelves fixed in alls in cementmortar 1& (1 cement & coarse sand" including
finishing complete.
(#tem no. .$5" Sqm 55.%% $,.55 105$.5
2" roviding and fixing 7.S. grill of approved pattern madeof 7.S. flats or square or round bars elded to steelframe of indos etc. including appl!ing a priming coatof red oxide )inc chromate primer..
(#tem no. .1" 8g &01.,0 0.'0 &,$51.$
26 roviding stainless steel railing/ grill made of S.S. flats*hollo S.S. pipe or square/ rectangular sections ofapproved design fixing in stair case* balcon! or otherplaces ith metal fasteners and stainless steel bolts etccomplete.
(#tem no. .5%" 8g $5,.%, &,0.15 ,$1.1'
S.No. PARTICULARS UNIT QTY RATE AMOUNT
-
7/26/2019 Estimate guide
7/60
2# roviding and fixing in position collapsible steel shuttersith vertical channels $0x10x$mm and braced ith flatiron diagonals $0x5mm si)e ith top and bottom rails of6-iron %0x%0xmm ith &,mm steel pulle!s completeith bolts* nuts* locking arrangement stoppers* handles
including appl!ing a priming coat of red oxide )incchromate primer.
(#tem no. ." Sqm 1&.$ $&55.5 &$'%.,$
2$ mm thick cement plaster of mix
#n +ement mortar 1& (1 cement & fine sand"
(#tem no. 11.1.1" Sqm 1,05.0$ '5.%0 1&0,.55
29 1$mm thick cement plaster of mix
#n +ement 7ortar 15 (1 cement 5 fine sand"
(#tem no. 11.$.&" Sqm %&0., '$.0 &1&',.,%
0 1, mm thick cement plaster ith under la!er of 1$mmthick cement plaster 15 (1 cement 5 fine sand"
finished ith a top la!er of mm thick cement plaster1& (1 cement & fine sand".
(#tem no. 11.'" Sqm &$&&.&1 1$0.0 &00'.
1 roviding and la!ing vitrified floor tiles ith doublecharge/ multi charge printing ith ater absorption less
than 0.59 and conforming to #S 15$$ of approvedmake in all colours and shades and si)e mentionedbelo (C/- 10mm"* laid on $0mm thick cement mortar1% (1 cement % coarse sand" including grouting the
=oints ith hite cement and matching pigments etc.complete
Si)e 00x00mm
(#tem no. 1$.11.1" Sqm 10%0.1& 50.5 ,111.$
2 $5 mm thick 8H6: stone slab flooring over $0mm(average" thick base of cement mortar 1% laid over and
=ointed ith gre! cement slurr! mixed ith pigment tomatch the shade of the slab including grinding rubbingand polishing etc. complete (:rea of slab to be over0.$0 sq.m and upto 0.50 sq.m"
(#tem no. 1$.%5" Sqm 5',.01 5,%.5 &&'&&.55
S.No. PARTICULARS UNIT QTY RATE AMOUNT
-
7/26/2019 Estimate guide
8/60
8H6: stone slab $5mm thick in risers and treads ofsteps* skirting dado and pillar laid in 1$mm (average"thick cement mortar 1& (1 cement & coarse sand" and
=ointed ith gre! cement slurr! mixed ith pigment tomatch the shade of the slab including rubbing and
polishing complete. (single stone is to be used for riserand treads of steps and the idth of stone for skirtingand dado shall be equal to the height of skirting/ dadoith a minimum length of 1.0 7."
(#tem no. 1$.%" Sqm $$%.& 50.10 1%0&%.5
! roviding and fixing ceramic gla)ed all tilesconforming to #S 15$$ of approved make* colours*shades and si)e on all and dados over 1$ mm thickbed of cement 7ortar 1& (1 cement & coarse sand"
and =ointing ith gre! cement slurr! ; &.&kg per sqmincluding pointing in hite cement mixed ith matching
pigment complete(#tem no. 1$." Sqm &%., 5&$.&5 $10$1.
" roviding and la!ing rectified ceramic gla)ed floor tiles&00x&00mm conforming to #S 15$$ of approvedmake* colour* shade laid on $0 mm thick +ement 7ortar1% (1 cement % coarse sand" including pointing the
=oints ith hite cement mixed ith matching pigmentetc.* complete.
#n colours such as @hite* #vor!* >re!* 2ume ed 3ron*
(#tem no. 1$.,.$" Sqm 10&.5 ,50.$0 ,,&',.$
6 15 mm thick 7arble ork (machine cut* table rubbed 4polished" for kitchen platform* vanit! counters* indosills and similar locations of required si)e laid over
$0mm thick base cement mortar 1% (1 cement %coarse sand" including =oints treated ith hite cementmixed ith matching pigment including rubbing andpolishing to edge moulding to give high gloss finish.
Idaipur green marble
(#tem no. 1&.&.5" Sqm &1.$ 15$1.&0 %'555.,%
# xtra for fixing marble /granite stone in facia and dropsof idth upto 150 mm ith epox! resin based adhesiveinstead of cement mortar including cleaning etc.complete.
(#tem no. 1&.," 7etre 5$.10 $$,.$0 11,,.$$
S.No. PARTICULARS UNIT QTY RATE AMOUNT
-
7/26/2019 Estimate guide
9/60
S.No. PARTICULARS UNIT QTY RATE AMOUNT
$ xtra for making opening of required si)e 4 shape forash basins/ kitchen sink in kitchen platform* vanit!counters and similar location in marble/>ranite/stoneork including making necessar! holes for pillar taps
etc. including rubbing and polishing of cut edges etc.complete
(#tem no. 1&." ach '.00 $$,.$0 15'.%0
9 +ement concrete flooring ith cement concrete 1$% (1cement $ coarse sand % graded stone aggregate$0mm" finished ith a floating coat of neat cement..
%0 mm thick
(#tem no. 1$.$.1" Sqm '0.$1 1'1.&5 1$15$&.1&
!0 roviding and appl!ing plaster of paris putt! overplastered all surface including scaffolding complete
Ipto $ mm thickness to make surface even and smoothin line and level.
(#tem no. 11.%1.1" Sqm %&0., %.'5 $01&51.&$
!1 roviding and appl!ing plaster of paris putt! overplastered ceiling surface including scaffolding complete.
Ipto $ mm thickness to make surface even and smoothin line and level.
(#tem no. 11.%$.1" Sqm 1,05.0$ 51.%0 $'',.05
!2 roviding and appl!ing $mm thick read! mix exterior
grade putt! (3irla all care* :lltek Superfine @/ of(F+J"* E.8. all putt!" on alls to make the surfacesmooth and even.
(#tem no. 1%.10" Sqm &$&&.&1 %$.5 1&'00.,%
! @all painting ith acr!lic premium emulsion (plastic"paint ($nd top most approved branded qualit!" to give aneven shade.
Hn ne ork (6o or more coats"
(#tem no. 1%.'.1" Sqm 11$.00 &'.%5 $$,,%.%$
!! ainting ne exterior surface (to or more coats" ith
7#I7 6K6IG paint as per manufacturerAsspecifications to give protective and decorative finishincluding cleaning ashing of surface etc. completeith
Hn ne ork (6o or more coats "
-
7/26/2019 Estimate guide
10/60
S.No. PARTICULARS UNIT QTY RATE AMOUNT
(#tem no. 1%.1$.1" Sqm &$&&.&1 '&.50 $&'%,.5,
!" 7aking 50mm thick plinth protection of plain cementconcrete 1& (1 cement & coarse sand gradedcrushed stone aggregate $0mm nominal si)e" over
'5mm bed of dr! brick ballast %0mm nominal si)e ellrammed and consolidated and grouted ith sandincluding finishing the top smooth.
(#tem no. 1%.1$.1" Sqm 1''.1% 1,.05 &$5.0
!6 roviding arrangement of ain @ater
-
7/26/2019 Estimate guide
11/60
S4> E//,,+ A88%%. E//,,+ E?,4%7, E//,,+
C.G.S%&%, A+'. M&+%. Bo&+( C.G.S%&%, A+'. M&+%. Bo&+( C.G.S%&%, A+'. M&+%. Bo&+(
-
7/26/2019 Estimate guide
12/60
DETAILS OF MEASUREMENTS
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
1 Surface dressing of the groundincluding removing vegetation and
making up undulations and in-equalities not exceeding 15 cms indepth/ height including disposal ofrubbish upto 1.5 m lift and lead upto50m (at least 5m aa! from thedressed area".
$ xcavation for all t!pes and si)es offoundations* trenches and drains orfor an! other purpose includingdisposal of excavated stuff upto 1.5 mlift and lead upto 50m (at least 5maa! from the excavated area"*including dressing and leveling of pits.
1x1 1 '0.00 15.00 1050.00
To%&' 10"0.00 S
#n all t!pes of soil2or +olumns 1x$ $ $.10 $.%0 $.50 ',1.$0
1x10 10 1.,0 $.10 $.50 %.50
To%&' $#".#0 C4
xtra for ever! additional lift of 1.5 mor part thereof.
#n all t!pes of soil
2or +olumns 1x$ $ $.10 $.%0 1.00 &1$.%,1x10 10 1.,0 $.10 1.00 &'.,0
To%&' "0.2$ C4
&roviding and la!ing nominal mixcement concrete ith crushed stoneaggregate using concrete mixer infoundation* plinth and at ground levelexcluding cost of form ork.
1%, (1 cement % coarse sand , gradedstone aggregate %0mm nominal si)e".
2or +olumns 1x$ $ $.10 $.%0 0.15 %.,'
1x10 10 1.,0 $.10 1.15 %&.%'
2or Inder floor
Jecture 6heater 1x1 1 .00 11.10 0.15 .
>ents 6oilet 1x1 1 &.&0 5.$0 0.15 $.5'
Store 1x1 1 &.&0 %.00 0.15 1.,
Staircase # 1x1 1 &.&0 .00 0.15 $.'
I.>.Jab 1x1 1 10.&0 .00 0.15 .$'
-
7/26/2019 Estimate guide
13/60
.>.+lass oom 1x1 1 %.'0 &.&0 0.15 $.&&
antr! 1x1 1 1.,5 &.&0 0.15 0.$
Jab 6echnician oom 1x1 1 &.&0 $.50 0.15 1.$%
.>. Jab 1x1 1 &.&0 .00 0.15 $.'
+hambers for :ssistant rofessor 1x1 1 .,0 .00 0.15 .1$:ssociate rofessor oom 1x1 1 &.&0 .00 0.15 $.'
-
7/26/2019 Estimate guide
14/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
+hha==a
+olumns above .J. upto >round1x1 1 &.&0 0.$0 0.&0 0.$0
2loor Slab
1x$ $ 0.$0 0.%0 %.00 1.,%
1x10 10 0.&0 0.0 %.00 '.$0
3eams at lintel level
:long K axis 1x$ $ $.0 0.$0 0.&0 0.&1
1x$ $ $.,0 0.$0 0.&0 0.&%
1x$$ $$ &.&0 0.$0 0.&0 %.&
1x, , &.$5 0.$0 0.&0 1.5
1x$ $ &.$0 0.$0 0.&0 0.&,
1x1% 1% &.10 0.$0 0.&0 $.0
1x1 1 &.00 0.$0 0.&0 0.1,
:long L axis 1x$x$ % &.55 0.$0 0.&0 0.,5
1x$ $ &.%0 0.$0 0.&0 0.%1
1x& & $.,0 0.$0 0.&0 0.501x1$x$ $% $.'0 0.$0 0.&0 &.,
1x1 1 $.10 0.$0 0.&0 0.1&
1x1 1 &.&0 0.$0 0.&0 0.$0
1x$x$ % 1.%0 0.10 0.$0 0.11
1x$ $ $.$0 0.10 0.$0 0.0
1x1 1 $.$0 0.0 0.10 $.51
1x& & 1.&0 0.0 0.10 0.$&
1x10 10 $.0 0.0 0.10 1.'%
1x1 1 $.'0 0.0 0.10 0.1
1x& & $.0 1.$0 0.10 1.0%
antr! latform 1x1 1 &.&0 0.,0 0.10 0.$
I.>.Jab latform 1x$ $ .00 0.,0 0.10 0.
1x1 1 10.&0 0.,0 0.10 0.,$
Joft for antr! 1x1 1 &.&0 0.0 0.10 0.$0
Joft for Store 1x1 1 %.00 0.,0 0.10 0.&$
1x1 1 1.50 0.,0 0.10 0.1$
>round floor Slab beams
:long K axis 1x$ $ $.0 0.$0 0.&0 0.&1
1x$ $ $.,0 0.$0 0.&0 0.&%
1x$, $, &.&0 0.$0 0.&0 5.5%
1x, , &.$5 0.$0 0.&0 1.51x$ $ &.$0 0.$0 0.&0 0.&,
1x1% 1% &.10 0.$0 0.&0 $.0
1x1 1 &.00 0.$0 0.&0 0.1,
:long L axis 1x$x$ % &.55 0.$0 0.&0 0.,5
1x$ $ &.%0 0.$0 0.&0 0.%1
1x1 1 1.'0 0.$0 0.&0 0.10
1x1 1 $.,0 0.$0 0.&0 $.
1x1$x$ $% $.'0 0.$0 0.&0 &.,
1x1 1 $.10 0.$0 0.&0 0.1&
-
7/26/2019 Estimate guide
15/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
o
1x1
1
&.&0
0.$0
0.&0
0.$0
1x&&
.000.&00.0
&.$%
>round 2loor Slab
Jecture 6heater1x1
1.00&.550.1$
$.5
1x11
.00&.%$0.1$
$.%
1x11
.00&.5'0.1$
$.5'
-
7/26/2019 Estimate guide
16/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
2irst 2loor Slab
1x1
1
&.&0
0.$0
0.&0
0.$0
1x$x$%
1.%00.100.$0
0.11
1x$$
$.$00.100.$0
0.0
+hha==a
1x1
1$.$00.00.10
$.51
1x&&
1.&00.00.10
0.$&
1x1010$.00.00.10
1.'%
1x11
$.'00.0
-
7/26/2019 Estimate guide
17/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
+hha==a
+orridor 1x1
1x1
1
1
&.&0
&.&0
5.'0
%.,0
0.1$
0.1$
$.$
1.0
1x1% 1% &.&0 $.,0 0.1$ 15.5$
1x1 1 &.&0 $.50 0.1$ 0.
1x1 1 &.&0 1.50 0.1$ 0.5
ro=ections ith slab 1x11 11 0.0 0.0 0.15 0.5
1x& & %.10 0.0 0.15 1.11
1x1$ 1$ 1.&0 0.0 0.1$ 1.1$
S4> To 1!.$" C4
S,o/( F'oo+
+olumns above first floor slab uptosecond floor slab
1x$ $ 0.$0 0.%0 %.00 1.,%
1x10 10 0.&0 0.0 %.00 '.$0
3eams at lintel level
:long K axis 1x$ $ $.0 0.$0 0.&0 0.&1
1x$ $ $.,0 0.$0 0.&0 0.&%1x$$ $$ &.&0 0.$0 0.&0 %.&
1x, , &.$5 0.$0 0.&0 1.5
1x$ $ &.$0 0.$0 0.&0 0.&,
1x1% 1% &.10 0.$0 0.&0 $.0
1x1 1 &.00 0.$0 0.&0 0.1,
:long L axis 1x$x$ % &.55 0.$0 0.&0 0.,5
1x$ $ &.%0 0.$0 0.&0 0.%1
1x& & $.,0 0.$0 0.&0 0.50
1x1$x$ $% $.'0 0.$0 0.&0 &.,
1x1 1 $.10 0.$0 0.&0 0.1&
1x1 1 &.&0 0.$0 0.&0 0.$0
1x$x$ % 1.%0 0.10 0.$0 0.11
1x$ $ $.$0 0.10 0.$0 0.0
1x1 1 $.$0 0.0 0.10 $.51
1x& & 1.&0 0.0 0.10 0.$&
1x10 10 $.0 0.0 0.10 1.'%
1x1 1 $.'0 0.0 0.10 0.1
1x& & $.0 1.$0 0.10 1.0%
antr! latform 1x1 1 &.&0 0.,0 0.10 0.$
Joft for antr! 1x1 1 &.&0 0.0 0.10 0.$0
Joft for Store 1x1 1 %.00 0.,0 0.10 0.&$1x1 1 1.50 0.,0 0.10 0.1$
Second 2loor Slab beams
:long K axis 1x$ $ $.0 0.$0 0.&0 0.&1
1x$ $ $.,0 0.$0 0.&0 0.&%
1x$, $, &.&0 0.$0 0.&0 5.5%
1x, , &.$5 0.$0 0.&0 1.5
1x$ $ &.$0 0.$0 0.&0 0.&,
1x1% 1% &.10 0.$0 0.&0 $.0
1x1 1 &.00 0.$0 0.&0 0.1,
-
7/26/2019 Estimate guide
18/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
:long L axis 1x$x$ % &.55 0.$0 0.&0 0.,5
1x$ $ &.%0 0.$0 0.&0 0.%1
1x1 1 1.'0 0.$0 0.&0 0.10
1x1 1 $.,0 0.$0 0.&0 $.
1x1$x$ $% $.'0 0.$0 0.&0 &.,
1x1 1 $.10 0.$0 0.&0 0.1&
1x1 1 &.&0 0.$0 0.&0 0.$0
1x& & .00 0.&0 0.0 &.$%
Second 2loor Slab
Jecture 6heater 1x1 1 .00 &.55 0.1$ $.5
1x1 1 .00 &.%$ 0.1$ $.%
1x1 1 .00 &.5' 0.1$ $.5'
>ents 6oilet 1x1 1 &.&0 5.$0 0.1$ $.0
Store 1x1 1 &.&0 %.00 0.1$ 1.5,
I.>.Jab 1x$ $ &.$5 .00 0.1$ %.,
1x1 1 &.$0 .00 0.1$ $.&0
.>.+lass oom 1x1 1 %.'0 &.&0 0.1$ 1.,
antr! 1x1 1 1.,5 &.&0 0.1$ 0.'&
Jab 6echnician oom 1x1 1 &.&0 $.50 0.1$ 0.
.>. Jab 1x1 1 &.&0 .00 0.1$ $.&,
+hambers for :ssistant rofessor 1x$ $ &.$5 .00 0.1$ %.,
:ssociate rofessor oom 1x1 1 &.&0 .00 0.1$ $.&,
To 16.1! C4
S%&+
+olumns above Second floor slabupto top
1x$ $ 0.$0 0.%0 0.0 %.%
1x10 10 0.&0 0.0 0.0 1.$
1x$x 1$ 0.$0 0.%0 1.0 1.5%
2rom .J. to >.2. Slab Jevel
@aist slab $x1 $ %., 1.50 0.15 $.11
-
7/26/2019 Estimate guide
19/60
$x1 $ %.&$ 1.50 0.15 1.%
Janding $x1 $ 1.50 &.&0 0.15 1.%
$x1 $ 0.,0 1.50 0.15 0.&
Steps $x$x0.5 $ 1.50 0.&0 0.15 1.'&
2rom >.2. Slab Jevel to 2.2.Slab Jevel
@aist slab $x1
$x1
$
$
%.,
%.&$
1.50
1.50
0.15
0.15
$.11
1.%
Janding $x1 $ 1.50 &.&0 0.15 1.%
$x1 $ 0.,0 1.50 0.15 0.&
Steps $x$x0.5 $ 1.50 0.&0 0.15 1.'&
2rom 2.2. Slab Jevel to 6errace 2loorSlab Jevel
@aist slab $x1 $ %., 1.50 0.15 $.11
$x1 $ %.&$ 1.50 0.15 1.%
Janding $x1 $ 1.50 &.&0 0.15 1.%$x$ % 0.,0 1.50 0.15 0.'$
Steps $x$x0.5 $ 1.50 0.&0 0.15 1.'&
Stair toer slab beams $x% , $.'0 0.$0 0.&0 1.&0
$x& &.&0 0.$0 0.&0 1.1
Stair toer slab $x$ % $.0 &.&0 0.15 5.'%
+hha==a 1x1 1 &.&0 0.0 0.10 0.$0
S4> To 9.2$ C4
G+&/( To%&' 6:A1.B2$CDC4EF;
5 roviding and fixing formorkincluding centering* shuttering*strutting* staging* propping bracingetc. complete and including itsremoval at all levels* for
M 2oundations* footings* base ofcolumns and plinth beam in an!shape and si)e.
2ootings 1x$x$ 1$% 1.,0 0.50 111.0
1x$x$ 1$% $.10 0.50 1&0.$0
1x$x10 $0 1.50 0.%5 1&.50
1x$x10 $0 1.,0 0.%5 1.$0+olumns up to >.J. 1x$x$ 1$% 0.$0 1.,5 %5.,,
1x$x$ 1$% 0.%0 1.,5 1.'
1x$x10 $0 0.&0 1.0 11.%0
1x$x10 $0 0.0 1.0 $$.,0
+olumns from >.J. to .J. 1x$x$ 1$% 0.$0 1.05 $.0%
1x$x$ 1$% 0.%0 1.05 5$.0,
1x$x10 $0 0.&0 1.05 .&0
1x$x10 $0 0.0 1.05 1$.0
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
20/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
linth beams
:long K axis
1x$x$
%
$.00.&0
&.1$
1x$x$%
$.,00.&0
&.&
1x&%x$&,
&.&00.&0
&'.$
1x1%x$
$,&.100.&0
$.0%
1x1x$$
&.000.&0
1.,0
:long L axis
1x$x$x$
,
&.55
-
7/26/2019 Estimate guide
21/60
M Suspended floors* roofs* accessplatform* balconies (plain surfaces"and shelves (cast in situ"
+hha==a
1x1 1 $.$0 0.0 $5.0,
1x& & 1.&0 0.0 $.&%
1x10 10 $.0 0.0 1'.%0
1x1 1 $.'0 0.0 1.$
1x& & $.0 1.$0 10.%%
0.00
antr! latform 1x1 1 &.&0 0.0 1.,
I.>.Jab latform 1x$ $ .00 0.0 '.$0
1x1 1 10.&0 0.0 .1,
Joft for antr! 1x1 1 &.&0 0.%0 1.&$
Joft for Store 1x1 1 %.00 0.0 $.%0
1x1 1 1.50 0.0 0.0
>round 2loor oof SlabJecture 6heater 1x1 1 .00 &.55 $1.&0
1x1 1 .00 &.%$ $0.5&
1x1 1 .00 &.5' $1.%&
>ents 6oilet 1x1 1 &.&0 5.$0 1'.1
Store 1x1 1 &.&0 %.00 1&.$0
I.>.Jab 1x$ $ &.$5 .00 &.00
1x1 1 &.$0 .00 1.$0
.>.+lass oom 1x1 1 %.'0 &.&0 15.51
antr! 1x1 1 1.,5 &.&0 .11
Jab 6echnician oom 1x1 1 &.&0 $.50 ,.$5
.>. Jab 1x1 1 &.&0 .00 1.,0+hambers for :ssistant rofessor 1x$ $ &.$5 .00 &.00
:ssociate rofessor oom 1x1 1 &.&0 .00 1.,0
-
7/26/2019 Estimate guide
22/60
1x1 1 $.'0 0.0 1.$
1x& & $.0 1.$0 10.%%
antr! latform 1x1 1 &.&0 0.0 1.,
Joft for antr! 1x1 1 &.&0 0.%0 1.&$Joft for Store 1x1 1 %.00 0.0 $.%0
1x1 1 1.50 0.0 0.0
2irst 2loor oof Slab
Jecture 6heater 1x1 1 .00 &.55 $1.&0
1x1 1 .00 &.%$ $0.5&
1x1 1 .00 &.5' $1.%&
>ents 6oilet 1x1 1 &.&0 5.$0 1'.1
Store 1x1 1 &.&0 %.00 1&.$0
I.>.Jab 1x$ $ &.$5 .00 &.00
1x1 1 &.$0 .00 1.$0
.>.+lass oom 1x1 1 %.'0 &.&0 15.51
antr! 1x1 1 1.,5 &.&0 .11
Jab 6echnician oom 1x1 1 &.&0 $.50 ,.$5
.>. Jab 1x1 1 &.&0 .00 1.,0
+hambers for :ssistant rofessor 1x$ $ &.$5 .00 &.00
:ssociate rofessor oom 1x1 1 &.&0 .00 1.,0
-
7/26/2019 Estimate guide
23/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
Second 2loor oof Slab
Jecture 6heater 1x1 1 .00 &.55 $1.&0
1x1 1 .00 &.%$ $0.5&
1x1 1 .00 &.5' $1.%&
>ents 6oilet 1x1 1 &.&0 5.$0 1'.1
Store 1x1 1 &.&0 %.00 1&.$0
I.>.Jab 1x$ $ &.$5 .00 &.00
1x1 1 &.$0 .00 1.$0
.>.+lass oom 1x1 1 %.'0 &.&0 15.51
antr! 1x1 1 1.,5 &.&0 .11
Jab 6echnician oom 1x1 1 &.&0 $.50 ,.$5
.>. Jab 1x1 1 &.&0 .00 1.,0
+hambers for :ssistant rofessor 1x$ $ &.$5 .00 &.00
:ssociate rofessor oom 1x1 1 &.&0 .00 1.,0
-
7/26/2019 Estimate guide
24/60
1x1x$ $ $.10 0.&0 1.$
1x1x$ $ &.&0 0.&0 1.,
$x$x$ , 1.%0 0.$0 $.$%
$x$ % $.$0 0.$0 1.'
>round floor Slab beams:long K axis 1x$x$ % $.0 0.&0 &.1$
1x$x$ % $.,0 0.&0 &.&
1x$,x$ 5 &.&0 0.&0 55.%%
1x,x$ 1 &.$5 0.&0 15.0
1x$x$ % &.$0 0.&0 &.,%
1x1%x$ $, &.10 0.&0 $.0%
1x1x$ $ &.00 0.&0 1.,0
:long L axis 1x$x$x$ , &.55 0.&0 ,.5$
1x$x$ % &.%0 0.&0 %.0,
1x1x$x$ $ 1.'0 0.&0 1.0$
1x1x$ &$ $.,0 0.&0 $.,,
1x1$x$x$ %, $.'0 0.&0 &,.,,1x1x$ $ $.10 0.&0 1.$
1x1x$ $ &.&0 0.&0 1.,
1x&x$ .00 0.0 $1.0
S4> To #!."0 S
F+8% F'oo+
3eams at lintel level
:long K axis 1x$x$ % $.0 0.&0 &.1$
1x$x$ % $.,0 0.&0 &.&
1x$$x$ %% &.&0 0.&0 %&.5
1x,x$ 1 &.$5 0.&0 15.0
1x$x$% &.$0 0.&0 &.,%
1x1%x$ $, &.10 0.&0 $.0%
1x1x$ $ &.00 0.&0 1.,0
:long L axis 1x$x$x$ , &.55 0.&0 ,.5$
1x$x$ % &.%0 0.&0 %.0,
1x&x$ $.,0 0.&0 5.0%
1x1$x$x$ %, $.'0 0.&0 &,.,,
1x1x$ $ $.10 0.&0 1.$
1x1x$ $ &.&0 0.&0 1.,
$x$x$ , 1.%0 0.$0 $.$%
$x$ % $.$0 0.$0 1.'
2irst floor Slab beams
:long K axis 1x$x$ % $.0 0.&0 &.1$1x$x$ % $.,0 0.&0 &.&
1x$,x$ 5 &.&0 0.&0 55.%%
1x,x$ 1 &.$5 0.&0 15.0
1x$x$ % &.$0 0.&0 &.,%
1x1%x$ $, &.10 0.&0 $.0%
1x1x$ $ &.00 0.&0 1.,0
:long L axis 1x$x$x$ , &.55 0.&0 ,.5$
1x$x$ % &.%0 0.&0 %.0,
1x1x$x$ $ 1.'0 0.&0 1.0$
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
25/60
1x1x$ &$ $.,0 0.&0 $.,,
1x1$x$x$ %, $.'0 0.&0 &,.,,
1x1x$ $ $.10 0.&0 1.$
1x1x$ $ &.&0 0.&0 1.,
1x&x$ .00 0.0 $1.0
S4> To #!."0 S
Second 2loor Slab
3eams at lintel level
:long K axis 1x$x$ % $.0 0.&0 &.1$
1x$x$ % $.,0 0.&0 &.&
1x$$x$ %% &.&0 0.&0 %&.5
1x,x$ 1 &.$5 0.&0 15.0
1x$x$ % &.$0 0.&0 &.,%
1x1%x$ $, &.10 0.&0 $.0%
1x1x$ $ &.00 0.&0 1.,0
:long L axis 1x$x$x$ , &.55 0.&0 ,.5$
1x$x$ % &.%0 0.&0 %.0,1x&x$ $.,0 0.&0 5.0%
1x1$x$x$ %, $.'0 0.&0 &,.,,
1x1x$ $ $.10 0.&0 1.$
1x1x$ $ &.&0 0.&0 1.,
$x$x$ , 1.%0 0.$0 $.$%
$x$ % $.$0 0.$0 1.'
Second floor Slab beams
:long K axis 1x$x$ % $.0 0.&0 &.1$
1x$x$ % $.,0 0.&0 &.&
1x$,x$ 5 &.&0 0.&0 55.%%
1x,x$1 &.$5 0.&0 15.0
1x$x$ % &.$0 0.&0 &.,%
1x1%x$ $, &.10 0.&0 $.0%
1x1x$ $ &.00 0.&0 1.,0
:long L axis 1x$x$x$ , &.55 0.&0 ,.5$
1x$x$ % &.%0 0.&0 %.0,
1x1x$x$ $ 1.'0 0.&0 1.0$
1x1x$ &$ $.,0 0.&0 $.,,
1x1$x$x$ %, $.'0 0.&0 &,.,,
1x1x$ $ $.10 0.&0 1.$
1x1x$ $ &.&0 0.&0 1.,
1x&x$ .00 0.0 $1.0
S4> To%&' :C; #!."0 S
Stair toer slab beams
G+&/( To%&1' 1:A!0B.06CDS;
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
$x%x$ 1 $.'0 0.$0 ,.%
$x&x$ 1$ &.&0 0.$0 '.$
S4> To 16."6 S
-
7/26/2019 Estimate guide
26/60
M Stair cases of all t!pes excludingspiral and folded plate t!pe* includingrisers and landings
S%&+
2rom .J. to >.2. Slab Jevel
@aist slab $x1 $ %., 1.50 1%.05
$x1 $ %.&$ 1.50 1$.5
Janding $x1 $ 1.50 &.&0 .0
$x1 $ 0.,0 &.&0 5.$,
isers $x$' 5% 1.50 0.15 11.
2rom >.2. Slab Jevel to 2.2.Slab Jevel
@aist slab $x1 $ %., 1.50 1%.05
$x1 $ %.&$ 1.50 1$.5
Janding $x1 $ 1.50 &.&0 .0
$x1 $ 0.,0 &.&0 5.$,
isers $x$' 5% 1.50 0.15 11.2rom 2.2. Slab Jevel to 6.2.Slab Jevel
@aist slab $x1 $ %., 1.50 1%.05
$x1 $ %.&$ 1.50 1$.5
Janding $x1 $ 1.50 &.&0 .0
$x$' % 0.,0 &.&0 10.5
isers $x$' 5% 1.50 0.15 11.
To%&' 16#.#$ S
roviding and placing in positionreinforcement for .+.+. ork includingstraightening* cutting* bending* bindingetc. complete as per draings includingcost of binding
ire all complete
6hermo-7echanicall! treated bars
6otal .+.+.@ork 1&.$, +um
S& 1%.00 +um
-
7/26/2019 Estimate guide
27/60
.+.+.
.+.+.up to >.J.
%.,'
1%1.&
Sub6ot .&, +um
(3"Inder floor
Jecture 6heater 1x1 1 .00 11.10 0.0 5.%>ents 6oilet 1x1 1 &.&0 5.$0 0.0 15.%%
Store 1x1 1 &.&0 %.00 0.0 11.,,
Staircase # 1x1 1 &.&0 .00 0.0 1'.,$
I.>.Jab 1x1 1 10.&0 .00 0.0 55.$
.>.+lass oom 1x1 1 %.'0 &.&0 0.0 1&.
antr! 1x1 1 1.,5 &.&0 0.0 5.%
Jab 6echnician oom 1x1 1 &.&0 $.50 0.0 '.%&
.>. Jab 1x1 1 &.&0 .00 0.0 1'.,$
+hambers for :ssistant rofessor 1x1 1 .,0 .00 0.0 &.'$
:ssociate rofessor oom 1x1 1 &.&0 .00 0.0 1'.,$
-
7/26/2019 Estimate guide
28/60
1x1 1 &.&0 0.$0 0.'5 0.50
1x1 1 &.55 0.$0 0.'5 0.5&
1x1 1 &.%0 0.$0 0.'5 0.51
2or Steps to +orridor
1x$ $ $.0 1.,0 0.&0 &.1&
1x$ $ $.0 1.50 0.15 1.&1
1x$ $ $.0 1.$0 0.15 1.0%
1x$ $ $.0 0.0 0.15 0.',
1x$ $ $.0 0.0 0.15 0.5$
1x$ $ $.0 0.&0 0.15 0.$
To%&' !$.69 C4
roviding and la!ing damp proofcourse (upto 50mm thick" ith plaincement concrete 1$% (1 cement $coarse sand % graded crushed stone
:long K axis 1x$ $ $.0 0.$0 0.05 0.05
1x$ $ $.,0 0.$0 0.05 0.0
1x&% &% &.&0 0.$0 0.05 1.1$
1x1% 1% &.10 0.$0 0.05 0.%&
1x1 1 &.00 0.$0 0.05 0.0&
:long L axis 1x$x$ % &.55 0.$0 0.05 0.1%
1x$ $ &.%0 0.$0 0.05 0.0'
1x1 1 1.'0 0.$0 0.05 0.0$
1x& & $.,0 0.$0 0.05 0.0,
1x1$x$ $% $.'0 0.$0 0.05 0.5
1x1 1 $.10 0.$0 0.05 0.0$1x1 1 &.&0 0.$0 0.05 0.0&
To%&' 2.#1 C4
10 :ppl!ing a coat of hot bitumen &0/%0using ; 1.'kg/ sqm on damp proofcourse after cleaning the surface ithbrushes and finall! ith a piece ofcloth lightl! soaked in kerosene oil.
:long K axis 1x$ $ $.0 0.$0 1.0%
1x$ $ $.,0 0.$0 1.1$
1x&% &% &.&0 0.$0 $$.%%1x1% 1% &.10 0.$0 ,.,
1x1 1 &.00 0.$0 0.0
:long L axis 1x$x$ % &.55 0.$0 $.,%
1x$ $ &.%0 0.$0 1.&
1x1 1 1.'0 0.$0 0.&%
1x& & $.,0 0.$0 1.,
1x1$x$ $% $.'0 0.$0 1$.
1x1 1 $.10 0.$0 0.%$
aggregate $0mm nominal si)e"including formork.
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
29/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
D,(4%o/8
F+8% F'oo+
1x1 1 &.&0 0.$0 0.
To%&' "!.1! S
11 3rick ork ith modular ell burntcla! bricks of crushing strength notless than $5 kg/sqcm and aterabsorption not more than $09 inSuperstructure
+ement 7ortar 1 (1 +ement +oarse Sand"
G+o4/( F'oo+
:long K axis 1x$ $ $.0 0.$0 &.%0 &.5%
1x$ $ $.,0 0.$0 &.%0 &.,1
1x$$ $$ &.&0 0.$0 &.%0 %.&'
1x, , &.$5 0.$0 &.%0 1'.,
1x$ $ &.$0 0.$0 &.%0 %.&5
1x1% 1% &.10 0.$0 &.%0 $.511x1 1 &.00 0.$0 &.%0 $.0%
:long L axis 1x$x$ % &.55 0.$0 &.%0 .
1x$ $ &.%0 0.$0 &.%0 %.$
1x1 1 1.'0 0.$0 &.%0 1.1
1x1 1 0.%0 0.$0 &.0 0.$
1x& & $.,0 0.$0 &.%0 5.'1
1x1$x$ $% $.'0 0.$0 &.%0 %%.0
1x1 1 $.10 0.$0 &.%0 1.%&
1x1 1 &.&0 0.$0 &.%0 $.$%
G1 1x1$ 1$ 1.$0 0.$0 $.10 -.05
G$ 1x1 1 1.10 0.$0 $.10 -0.%
G& 1x1 1 1.00 0.$0 $.10 -0.%$
G% 1x$ $ 0.0 0.$0 $.10 -0.'
@1 1x1 1 1.,0 0.$0 1.$0 -,.$1
@$ 1x1 1 1.$0 0.$0 1.$0 -0.$
@& 1x$ $ 0.0 0.$0 1.$0 -0.%&
? 1x1& 1& 0.0 0.$0 0.0 -1.%0
+> 1x$ $ $.0 0.$0 $.%0 -$.',
Hpenings in +orridor 1x1$ 1$ $.'0 0.$0 1.50 -.'$
1x1 1 1.10 0.$0 1.50 -0.&&S4>To% 1!$.62 C4
:long K axis 1x$ $ $.0 0.$0 &.%0 &.5%
1x$ $ $.,0 0.$0 &.%0 &.,1
1x$$ $$ &.&0 0.$0 &.%0 %.&'
1x, , &.$5 0.$0 &.%0 1'.,
1x$ $ &.$0 0.$0 &.%0 %.&5
1x1% 1% &.10 0.$0 &.%0 $.51
1x1 1 &.00 0.$0 &.%0 $.0%
-
7/26/2019 Estimate guide
30/60
:long L axis 1x$x$
1x$
%
$
&.55
&.%0
0.$0
0.$0
&.%0
&.%0
.
%.$
1x1 1 1.'0 0.$0 &.%0 1.1
1x1 1 0.%0 0.$0 &.0 0.$
1x& & $.,0 0.$0 &.%0 5.'1
1x1$x$ $% $.'0 0.$0 &.%0 %%.0
1x1 1 $.10 0.$0 &.%0 1.%&
1x1 1 &.&0 0.$0 &.%0 $.$%
D,(4%o/8
G1 1x1$ 1$ 1.$0 0.$0 $.10 -.05
G$ 1x1 1 1.10 0.$0 $.10 -0.%
G& 1x1 1 1.00 0.$0 $.10 -0.%$
G% 1x$ $ 0.0 0.$0 $.10 -0.'
@1 1x1 1 1.,0 0.$0 1.$0 -,.$1
@$ 1x1 1 1.$0 0.$0 1.$0 -0.$
@& 1x$ $ 0.0 0.$0 1.$0 -0.%&
? 1x1& 1& 0.0 0.$0 0.0 -1.%0
+> 1x$ $ $.0 0.$0 $.%0 -$.',
Hpenings in +orridor 1x10 10 1.,0 0.$0 1.,0 -.%,
1x& & $.0 0.$0 1.,0 -&.1&
1x1 1 1.10 0.$0 1.,0 -0.%0
S4>To% 1!$.66 C4
S,o/( F'oo+ Nt!. Same as 2irst floor S4>To%&' :C;1!$.66 C4
O/ T,++&,Staircase $x$x$ , $.'0 0.$0 $.$0 .50
$x$ % &.&0 0.$0 $.$0 5.,1
$x$x$ , $.'0 0.$0 0.&0 1.&0
$x$ % &.&0 0.$0 0.&0 0.'
Geductions
G$ 1x$ $ 1.10 0.$0 $.10 -0.$
P&+&5,%
:long K axis 1x$ $ $.0 0.$0 0.0 0.%
1x$ $ $.,0 0.$0 0.0 1.01
1x11 11 &.&0 0.$0 0.0 .5&
1x% % &.$5 0.$0 0.0 $.&%1x1 1 &.$0 0.$0 0.0 0.5,
1x1% 1% &.10 0.$0 0.0 '.,1
1x1 1 &.00 0.$0 0.0 0.5%
:long L axis 1x$ $ &.55 0.$0 0.0 1.$,
1x1 1 &.%0 0.$0 0.0 0.1
1x1 1 1.'0 0.$0 0.0 0.&1
1x$ $ $.'0 0.$0 0.0 0.'
1x1 1 $.,0 0.$0 0.0 0.50
arapet for elevation 1x1 1 .%0 0.$0 0.'0 0.0
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
31/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%S4>To% !0.#9 C4
G+&/( To%&' !:A$6.B#2CDC;4
1$ ents 6oilet 1x1 1 $.10 $.10 %.%1
1x$ $ 1.%0 $.10 5.,,
Jadies 6oilet 1x1 1 $.10 $.10 %.%1
1x$ $ 1.%0 $.10 5.,,
2or 3oxes 1x1' 1' 0.0 &.'0 &'.'%
1x$1 $1 0.50 &.'0 &,.,5
1x$ $ 0.,0 &.'0 5.$1x& & $.0 $.'0 $&.%
Hver +hha==as 1x5x$ 10 $.10 0.50 10.50
1x10 10 0.50 0.50 $.50
1x1 1 $.$0 0.$0 ,.&
1x$ &, 0.50 0.$0 &.,0
1x1& 1& 1.&0 0.$0 &.&,
1&x$ $ 0.50 0.$0 $.0
Geductions
-
7/26/2019 Estimate guide
32/60
S,o/( F'oo+
G5 1x$x$ % 0.'5 $.10 -.&0
Hpening 1x& & $.0 1.,0 -15.
>ents 6oilet 1x1 1 $.10
S4>To%
$.10
1".#6
%.%1
S
1x$ $ 1.%0 $.10 5.,,
Jadies 6oilet 1x1 1 $.10 $.10 %.%1
1x$ $ 1.%0 $.10 5.,,
2or 3oxes 1x1' 1' 0.0 &.'0 &'.'%
1x$1 $1 0.50 &.'0 &,.,5
1x$ $ 0.,0 &.'0 5.$
1x& & $.0 $.'0 $&.%
Hver +hha==as 1x5x$ 10 $.10 0.50 10.50
1x10 10 0.50 0.50 $.50
1x1 1 $.$0 0.$0 ,.&1x$ &, 0.50 0.$0 &.,0
1x1& 1& 1.&0 0.$0 &.&,
Geductions
1&x$ $ 0.50 0.$0 $.0
G5 1x$x$ % 0.'5 $.10 -.&0
Hpening 1x& & $.0 1.,0
S4>To%&'
-15.
:C;1".#6 S
T,++&, F'oo+
Hver +hha==as 1x$ $ &.'0 0.$0 1.%,
$x$ % 0.50 0.$0 0.%0S4>To% 1.$$ S
G+&/( To%&' !:A"$.B62CDS;
1& roviding ood ork in frames ofdoors* indos* clerestor! indosand other frames rought framed andfixed in position.
Sal* bi=asal* benteak* khair* haldu
G+o4/( F'oo+
F+8% F'oo+
G1 1x1$ 1$ 5.%0 0.100 0.1$5 0.,1
G$ 1x1 1 5.&0 0.100 0.1$5 0.0'
G& 1x1 1 5.$0 0.100 0.1$5 0.0'
G% 1x$ $ 5.10 0.100 0.1$5 0.1&
G5 1x% % %.5 0.100 0.1$5 0.$5
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
G1 1x1$ 1$ 5.%0 0.100 0.1$5 0.,1
G$ 1x1 1 5.&0 0.100 0.1$5 0.0'
G& 1x1 1 5.$0 0.100 0.1$5 0.0'
G% 1x$ $ 5.10 0.100 0.1$5 0.1&
-
7/26/2019 Estimate guide
33/60
S,o/( F'oo+
G5 1x% % %.5 0.100 0.1$5 0.$5
G1 1x1$ 1$ 5.%0 0.100 0.1$5 0.,1
G$ 1x1 1 5.&0 0.100 0.1$5 0.0'
G& 1x1 1 5.$0 0.100 0.1$5 0.0'G% 1x$ $ 5.10 0.100 0.1$5 0.1&
G5 1x% % %.5 0.100 0.1$5 0.$5
S%&+&8,
G$ 1x$ $ 5.&0 0.100 0.1$5 0.1&
To%&' !.0$ C4
1% roviding and fixing flush doorshutters* core of block boardconstruction ith frame of first classhard ood and ell matched firstclass #ndian teak pl! veneering on
one face and commercial pl!veneering on the other face of theshutter ith vertical grains* crossbands and face veneering excludinghinges.
&5 mm. thick (single leaf"
G+o4/( F'oo+
G1 1x1$ 1$ 1.$0 $.10 &0.$%
G$ 1x1 1 1.10 $.10 $.&1
G& 1x1 1 1.00 $.10 $.10
G% 1x$ $ 0.0 $.10 &.',
F+8% F'oo+
G1 1x1$ 1$ 1.$0 $.10 &0.$%
G$ 1x1 1 1.10 $.10 $.&1
G& 1x1 1 1.00 $.10 $.10
G% 1x$ $ 0.0 $.10 &.',
S,o/( F'oo+
G1 1x1$ 1$ 1.$0 $.10 &0.$%
G$ 1x1 1 1.10 $.10 $.&1
G& 1x1 1 1.00 $.10 $.10
G% 1x$ $ 0.0 $.10 &.',
S%&+&8,
G$ 1x$ $ 1.10 $.10 %.$
To%&' 119.91 S
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
34/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
15 roviding and fixing aluminium orkfor doors* indos* ventilators andpartitions made out of extrudedaluminium standard sections (mainsection ith minimum 1.5mm
thickness" conforming to #S '&&* #S1$,5 mitred and =ointed mechanicall!including aluminium cleats* neopreneeather stripping gasket bevelededge beading* scres dul! fixed inall/ floor ith fixing clips or holdfasteners or bolts and nuts asrequired aluminium sections shall beanodi)ed transparent or d!ed toapproved shade according to #S1,,* minimum anodic coating shallbe of grade :+-15. (>la)ing andpanelling to be paid for separatel!
2or shutter of doors* indos 4ventilators including providing andmaking provision for fixing of fittingherever required including the costof ?+/ neoprene gasket required(2ittings shall be paid for separatel!".
G+o4/( F'oo+
F+8% F'oo+
S,o/( F'oo+
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
@& 1x$ $ 0.0 0.$0 1.$0 $.1
? 1x1& 1& 0.0 0.$0 0.0 '.0$
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
@& 1x$ $ 0.0 0.$0 1.$0 $.1
? 1x1& 1& 0.0 0.$0 0.0 '.0$
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
@& 1x$ $ 0.0 0.$0 1.$0 $.1
? 1x1& 1& 0.0 0.$0 0.0 '.0$
To%&' 1"!.9$ S
; ,.00 8g/Sqm
To%&' 129.$! K
-
7/26/2019 Estimate guide
35/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
1 roviding and fixing gla)ing inaluminium door* indo* ventilatorshutters and partitions etc. ith ?+/neoprene gasket etc. complete. (+ostof aluminium snap beading shall be
paid in basic item"@ith float glass panes of % mmthickness
G+o4/( F'oo+
F+8% F'oo+
S,o/( F'oo+
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
@& 1x$ $ 0.0 0.$0 1.$0 $.1
? 1x1& 1& 0.0 0.$0 0.0 '.0$
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
@& 1x$ $ 0.0 0.$0 1.$0 $.1
? 1x1& 1& 0.0 0.$0 0.0 '.0$
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
@& 1x$ $ 0.0 0.$0 1.$0 $.1
? 1x1& 1& 0.0 0.$0 0.0 '.0$
To%&' 1"!.9$ S
-
7/26/2019 Estimate guide
36/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
1' roviding and fixing &0mm thickfactor! made panel ?+ door shutterconsisting of frame made out of 7.S.tubes of 1 gauge thickness and si)eof 1mm x 1mm for st!les and
15x15mm for top 4 bottom rails. 7.S.frame shall have a coat of steelprimers of approved make andmanufacture . 7.S. frame coveredith 5mm thick heat moulded ?+ A+Achannel of si)e &0mm thickness*'0mm idth out of hich 50mm shallbe flat and $0mm shall be tapered in%5degree angle on either side formingst!lesB and 5mm thick* 5mm ide?+ sheet out of hich '5mm shallbe flat and $0mm shall be tapered in%5 degree on the inner side to form
top and bottom rail and 115mm ide?+ sheet out of hich '5mm shallbe flat and $0mm shall be tapered onboth sides to form lock rail. 6op*bottom and lock rails shall beprovided either side of the panel.10mm (5mm x $ " thick* $0mm idecross ?+ sheet be provided as gapinsert for top rail 4 bottom rail.paneling of 5mm thick both side ?+sheet to be fitted in the 7.S. frameelded/ sealed to the st!les 4 railsith 'mm (5mmC$mm" thick x 15mm
ide ?+ sheet beading on innerside* and =oined together ith solventcement adhesive. :n additional 5mmthick ?+ strip of $0mm idth is to be
3oth side re-laminated panel ?+door shutter
>round 2loor 1x% % 0.'5 $.10 .&0
2irst 2loor 1x% % 0.'5 $.10 .&0
Second 2loor 1x% % 0.'5 $.10 .&0
To%&' 1$.90 S
1, roviding and fixing S.S. finishedbrass butt hinges ith necessar! S.S.finished 7S scres complete
1$5x,5x5.50 mm (
-
7/26/2019 Estimate guide
37/60
F+8% F'oo+
G1 1x1$x& & &.00
G$ 1x1x& & &.00
G& 1x1x& & &.00
G% 1x$x& .00G5 1x%x& 1$ 1$.00
S,o/( F'oo+
G1 1x1$x& & &.00
G$ 1x1x& & &.00
G& 1x1x& & &.00
G% 1x$x& .00
G5 1x%x& 1$ 1$.00
S%&+&8,
G$ 1x$x& .00
To%&' 1$6.00 No8
1 roviding and fixing S.S. finishedbrass sliding door bolt ith necessar!
bolts* nuts andscres complete
S.S. finished 7S
&00x1 mm
G+o4/( F'oo+
G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
G5 1x%x$ , ,.00
F+8% F'oo+G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
G5 1x%x$ , ,.00
S,o/( F'oo+
G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
G5 1x%x$ , ,.00S%&+&8,
G$ 1x$x$ % %.00
To%&' 12!.00 No8
$0 roviding and fixing S.S. finishedbrass door latch ith necessar! S.S.finished 7S scres complete
$50x1x5mm
G+o4/( F'oo+
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
38/60
G1
G$
1x1$x$
1x1x$
$%
$
$%.00
$.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
F+8% F'oo+G5 1x%x$ , ,.00
G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
S,o/( F'oo+
G5 1x%x$ , ,.00
G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G%1x$x$ % %.00
S%&+&8,
G5 1x%x$ , ,.00
G$ 1x$x$ % %.00
To%&' 12!.00 No8
$1 roviding and fixing S.S. finished
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
brass handle ith necessar!finished 7S scres complete
S.S.
1$5 mm
G+o4/( F'oo+
G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
G5 1x%x$ , ,.00
F+8% F'oo+
G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
G5 1x%x$ , ,.00
S,o/( F'oo+
G1 1x1$x$ $% $%.00
G$ 1x1x$ $ $.00
G& 1x1x$ $ $.00
G% 1x$x$ % %.00
G5 1x%x$ , ,.00
S%&+&8,
G$ 1x$x$ % %.00
To%&' 12!.00 No8
-
7/26/2019 Estimate guide
39/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
$$ roviding and fixing 150mm S.S.finished brass floor door stoppers ithrubber cushion ith necessar! S.S.finished 7S scres to suit thicknessof shutters.
G+o4/( F'oo+
F+8% F'oo+
S,o/( F'oo+
S%&+&8,
G1 1x1$x1 1$ 1$.00
G$ 1x1x1 1 1.00
G& 1x1x1 1 1.00
G% 1x$x1 $ $.00
G5 1x%x1 % %.00
G1 1x1$x1 1$ 1$.00
G$ 1x1x1 1 1.00
G& 1x1x1 1 1.00
G% 1x$x1 $ $.00
G5 1x%x1 % %.00
G1 1x1$x1 1$ 1$.00
G$ 1x1x1 1 1.00
G& 1x1x1 1 1.00
G% 1x$x1 $ $.00
G5 1x%x1 % %.00
G$ 1x$x1 $ $.00
To%&' 62.00 No8
$& roviding and fixing S.S. finishedbrass toer bolts (3arrel t!pe" ithnecessar! S.S. finished 7S screscomplete
$00 x10mm
G+o4/( F'oo+
G1 1x1$x1 1$ 1$.00
G$ 1x1x1 1 1.00
F+8% F'oo+
S,o/( F'oo+
S%&+&8,
150 x 10 mm
G+o4/( F'oo+
G1 1x1$x1 1$ 1$.00
G$ 1x1x1 1 1.00
G1 1x1$x1 1$ 1$.00
G$ 1x1x1 1 1.00
G$ 1x$x1 $ $.00
To%&' !1.00 No8
G& 1x1x1 1 1.00
G% 1x$x1 $ $.00
-
7/26/2019 Estimate guide
40/60
F+8% F'oo+
G5 1x%x1 % %.00
G& 1x1x1 1 1.00
G% 1x$x1 $ $.00
G5 1x%x1 % %.00S,o/( F'oo+
G& 1x1x1 1 1.00
G% 1x$x1 $ $.00
G5 1x%x1 % %.00
To%&' 21.00 No8
$% roviding and fixing both side polished&0 mm thick :E#7 S:FG S6HFshelves fixed in alls in cement mortar1& (1 cement & coarse sand"including finishing complete.
G+o4/( F'oo+
F+8% F'oo+
Shelves of antr! 1x& & &.&00 0.'0 .&
Shelves of Store 1x& & %.000 0.'0 ,.%0
1x& & 1.500 0.'0 &.15
F+8% F'oo+
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
Shelves of antr! 1x& & &.&00 0.'0 .&
Shelves of Store 1x& & %.000 0.'0 ,.%0
1x& & 1.500 0.'0 &.15
S,o/( F'oo+
Shelves of antr! 1x& & &.&00 0.'0 .&
Shelves of Store 1x& & %.000 0.'0 ,.%0
1x& & 1.500 0.'0 &.15To%&' "".!! S
$5 roviding and fixing 7.S. grill ofapproved pattern made of 7.S. flatsor square or round bars elded tosteel frame of indos etc. includingappl!ing a priming coat of red oxide)inc chromate primer..
G+o4/( F'oo+
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
@& 1x$ $ 0.0 0.$0 1.$0 $.1? 1x1& 1& 0.0 0.$0 0.0 '.0$
>rills 1x11 11 $.0 0.$0 1.50 %'.,5
1x1 1 $.'0 0.$0 1.50 %.05
1x1 1 1.10 0.$0 1.50 1.5
@1 1x1 1 1.,0 0.$0 1.$0 %1.0%
@$ 1x1 1 1.$0 0.$0 1.$0 1.%%
-
7/26/2019 Estimate guide
41/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
@& 1x$ $ 0.0 0.$0 1.$0 $.1
S,o/( F'oo+
?
1x1&
1&
0.00.$0
0.0
'.0$
>rills
1x1111
1.,00.$0
1.,0&5.%
1x&&
$.00.$01.,0
15.
1x111.100.$01.,0
1.,
@1
1x1
1
1.,0
0.$0
1.$0
%1.0%
@$1x1
1
-
7/26/2019 Estimate guide
42/60
Jecture 6heater 1x1 1 .00 11.10 .0
>ents 6oilet 1x1 1 &.&0 5.$0 1'.1
Store 1x1 1 &.&0 %.00 1&.$0
I.>.Jab 1x1 1 10.&0 .00 1.,0
.>.+lass oom 1x1 1 %.'0 &.&0 15.51antr! 1x1 1 1.,5 &.&0 .11
Jab 6echnician oom 1x1 1 &.&0 $.50 ,.$5
.>. Jab 1x1 1 &.&0 .00 1.,0
+hambers for :ssistant rofessor 1x1 1 .,0 .00 %0.,0
:ssociate rofessor oom 1x1 1 &.&0 .00 1.,0
ents 6oilet 1x1 1 &.&0 5.$0 1'.1
Store 1x1 1 &.&0 %.00 1&.$0
Seminar .+lass oom 1x1 1 %.'0 &.&0 15.51
antr! 1x1 1 1.,5 &.&0 .11
Jab 6echnician oom 1x1 1 &.&0 $.50 ,.$5
.>. Jab 1x1 1 &.&0 .00 1.,0
+hambers for :ssistant rofessor 1x1 1 .,0 .00 %0.,0
:ssociate rofessor oom 1x1 1 &.&0 .00 1.,0
-
7/26/2019 Estimate guide
43/60
+eiling of Stair 1x1
1x1
1
1
%.,
%.&$
1.50
1.50
'.0&
.%'
Janding 1x1 1 1.50 &.&0 %.5
1x1 1 0.,0 &.&0 $.%
+hha==a 1x1 1 $.$0 0.0 $5.0,1x& & 1.&0 0.0 $.&%
1x10 10 $.0 0.0 1'.%0
1x1 1 $.'0 0.0 1.$
1x& & $.0 1.$0 10.%%
S,o/( F'oo+
Jecture 6heater 1x1 1 .00 11.10 .0
>ents 6oilet 1x1 1 &.&0 5.$0 1'.1
Store 1x1 1 &.&0 %.00 1&.$0
I.>.Jab 1x1 1 10.&0 .00 1.,0
.>.+lass oom 1x1 1 %.'0 &.&0 15.51
antr! 1x1 1 1.,5 &.&0 .11
Jab 6echnician oom 1x1 1 &.&0 $.50 ,.$5
.>. Jab 1x1 1 &.&0 .00 1.,0
+hambers for :ssistant rofessor 1x1 1 .,0 .00 %0.,0
:ssociate rofessor oom 1x1 1 &.&0 .00 1.,0
-
7/26/2019 Estimate guide
44/60
>ents 6oilet 1x$
1x$
$
$
&.&0
5.$0
1.5,
1.5,
10.%&
1.%&
Store 1x$ $ &.&0 &.,, $5.1
1x$ $ %.00 &.,, &1.0%
I.>.Jab 1x$ $ 10.&0 &.,, '.&1x$ $ .00 &.,, %.5
.>.+lass oom 1x$ $ %.'0 &.,, &.%'
1x$ $ &.&0 &.,, $5.1
antr! 1x$ $ 1.,5 &.,, 1%.&
1x$ $ &.&0 &.,, $5.1
Jab 6echnician oom 1x$ $ &.&0 &.,, $5.1
1x$ $ $.50 &.,, 1.%0
.>. Jab 1x$ $ &.&0 &.,, $5.1
1x$ $ .00 &.,, %.5
+hambers for :ssistant rofessor 1x$ $ .,0 &.,, 5$.''
1x$ $ .00 &.,, %.5
:ssociate rofessor oom 1x$ $ &.&0 &.,, $5.1
1x$ $ .00 &.,, %.5
-
7/26/2019 Estimate guide
45/60
F+8% *'oo+
S4>To% 196.9" S
Jecture 6heater 1x$
1x$
$
$
.00
11.10
&.,,
&.,,
%.5
,.1%
>ents 6oilet 1x$ $ &.&0 1.5, 10.%&
1x$ $ 5.$0 1.5, 1.%&
Store 1x$ $ &.&0 &.,, $5.1
1x$ $ %.00 &.,, &1.0%
Seminar
-
7/26/2019 Estimate guide
46/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
? 1x1& 1& 0.0 0.0 -'.0$
S,o/( F'oo+
Hpenings in +orridor 1x10 10 1.,0 1.,0 -&$.%0
1x& & $.0 1.,0 -15.
S4>To% 1!1.06 S
Jecture 6heater 1x$ $ .00 &.,, %.5
1x$ $ 11.10 &.,, ,.1%
>ents 6oilet 1x$ $ &.&0 1.5, 10.%&
1x$ $ 5.$0 1.5, 1.%&
Store 1x$ $ &.&0 &.,, $5.1
1x$ $ %.00 &.,, &1.0%
I.>. Jab 1x$ $ 10.&0 &.,, '.&
1x$ $ .00 &.,, %.5
.>.+lass oom 1x$ $ %.'0 &.,, &.%'
1x$ $ &.&0 &.,, $5.1
antr! 1x$ $ 1.,5 &.,, 1%.&
1x$ $ &.&0 &.,, $5.1
Jab 6echnician oom 1x$ $ &.&0 &.,, $5.1
1x$ $ $.50 &.,, 1.%0
.>. Jab 1x$ $ &.&0 &.,, $5.1
1x$ $ .00 &.,, %.5
+hambers for :ssistant rofessor 1x$ $ .,0 &.,, 5$.''
1x$ $ .00 &.,, %.5
:ssociate rofessor oom 1x$ $ &.&0 &.,, $5.1
1x$ $ .00 &.,, %.5
-
7/26/2019 Estimate guide
47/60
@1
@$
1x1
1x1
1
1
1.,0
1.$0
1.$0
1.$0
-%1.0%
-1.%%
@& 1x$ $ 0.0 1.$0 -$.1
? 1x1& 1& 0.0 0.0 -'.0$
Hpenings in +orridor 1x10 10 1.,0 1.,0 -&$.%0
1x& & $.0 1.,0 -15.
S4>To% 1!1.06 S
S%&+ To,+
$x$ % &.&0 $.&, &1.%$
$x$ % .00 $.&, 5'.1$
Geductions
G$ 1x$ $ 1.10 $.10 -%.$
S4>To%&' :D; $.92 S
To%&' A !06.9$ S
&0 1, mm thick cement plaster ithunder la!er of 1$mm thick cementplaster 15 (1 cement 5 fine sand"finished ith a top la!er of mm thickcement plaster 1& (1 cement & finesand".
2ront side 1x1 1 $.0 1&.5 ,'&.$'
1x1 1 $.'0 1&.5 &'.'
Hffsets 1x 0.0 1$.& %.55
1x10 10 0.0 11.'5 '0.50
1x$ $ 0.0 1$.& 15.5$
1x1 1 0.0 1&.5 ,.&'
1x 1.$0 '.'5 55.,0
1x 1.$0 $.'5 1.,0
1x 0.0 .'0 $%.1$
1x 0.0 &.'0 1&.&$
1x1 1 10.&0 1.&0 1&.&
1x 0.0 &.15 11.&%
3ack side 1x1 1 $.%0 1&.5 ,'0.%,
1x$ $ &.'0 1.,0 1&.&$
Hffsets 1x1%x$ 1, 0.$0 1&.5 50.$$
1x&x$ 0.&0 1&.5 $5.11
1x%x$ , 0.$0 1.,0 $.,,
Jeft side 1x1 1 1$.10 1&.5 1,.,0
Hffsets 1x$x$ % 0.&0 1&.5 1.'%
ight side 1x1 1 10.$0 1&.5 1%$.$
Hffsets 1x1 1 0.$0 1&.5 $.'
Huter side of Staircase above terracefloor 1x$ $ &.'0 $.'0 1.,
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
48/60
1x$x$ % .%0 $.'0 .1$
#nner 4 6op Side Hf arapet 1x1 1 1&.00 1.10 1%.&0
1x1 1 &,.&0 1.10 %$.1&
1x1 1 &.&0 1.10 &.&
1x$ $ 11.10 1.10 $%.%$
1x1 1 5$.%0 1.10 5'.%
1x1 1 10.&0 1.'0 1'.51
#nner side of +hha==as
1x1x&x$ 10% $.$0 0.0 1&'.$,
1x1x&x$ 10% 0.50 0.0 &1.$0
1x&x&x$ 1, 1.&0 0.0 1%.0%
1x&x&x$ 1, 0.50 0.0 5.%0
1x10x&x$ 0 $.0 0.0 10%.%0
1x10x&x$ 0 0.50 0.0 1,.00
1x1x&x$ $.'0 0.0 .'$
1x1x&x$ 0.50 0.0 1.,01x&x&x$ 1, $.0 0.0 &1.&$
1x&x&x$ 1, 0.50 0.0 5.%0
1x1$x&x$ '$ 1.&0 0.0 5.1
1x1$x&x$ '$ 0.50 0.0 $1.0
1x%x$ , %.,0 0.0 $&.0%
1x%x$ , 0.50 0.0 $.%0
1x,x$ 1 $.00 0.0 1.$0
1x,x$ 1 0.50 0.0 %.,0
1x$x$ % .%0 0.0 15.&
1x$x$ % 0.50 0.0 1.$0
To%&' 2.1 S.
&1 roviding and la!ing vitrified floor tilesith double charge/ multi chargeprinting ith ater absorption lessthan 0.59 and conforming to #S 15$$ of approved make in allcolours and shades and si)ementioned belo (C/- 10mm"* laid on$0mm thick cement mortar 1% (1cement % coarse sand" includinggrouting the =oints ith hite cementand matching pigments etc. complete
Si)e 00x00mm
G+o4/( F'oo+
Jecture 6heater
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
2loor 1x1 1 .00 11.10 .0
Goor Sill 1x1 1 1.$0 0.$0 0.$%
Skirting 1x$ $ .00 0.15 1.,0
1x$ $ 11.10 0.15 &.&&
1x .00 0.15 ,.10
-
7/26/2019 Estimate guide
49/60
Store
Geductions 1x1 1 1.10 0.15 -0.1'
2loor 1x1 1 &.&0 %.00 1&.$0
Goor Sill 1x1 1 1.$0 0.$0 0.$%
Skirting 1x$ $ &.&0 0.15 0.1x$ $ %.00 0.15 1.$0
Geductions 1x1 1 1.$0 0.15 -0.1,
I.>.Jab
2loor 1x1 1 10.&0 .00 1.,0
Goor Sill 1x$ $ 1.$0 0.$0 0.%,
Skirting 1x$ $ .00 0.15 1.,0
1x$ $ 11.&0 0.15 &.&
Geductions 1x$ $ 1.$0 0.15 -0.&
Jab 6echnician oom 2loor 1x1 1 &.&0 $.50 ,.$5
Goor Sill 1x1 1 1.$0 0.$0 0.$%
Skirting 1x$ $ &.&0 0.15 0.
1x$ $ $.50 0.15 0.'5
Geductions 1x1 1 1.$0 0.15 -0.1,
.>. +lass oom
antr!
.>. Jab
2loor 1x1 1 %.'0 &.&0 15.51
Goor Sill 1x1 1 1.$0 0.$0 0.$%
Skirting 1x$ $ %.'0 0.15 1.%1
1x$ $ &.&0 0.15 0.
Geductions 1x1 1 1.$0 0.15 -0.1,
2loor 1x1 1 1.,5 &.&0 .11
Goor Sill 1x1 1 1.$0 0.$0 0.$%Skirting 1x$ $ 1.,5 0.15 0.5
1x$ $ &.&0 0.15 0.
Geductions 1x1 1 1.$0 0.15 -0.1,
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
50/60
2loor 1x1 1 &.&0 .00 1.,0
Goor Sill 1x1 1 1.$0 0.$0 0.$%
Skirting 1x$ $ &.&0 0.15 0.
1x$ $ .00 0.15 1.,0
Geductions 1x1 1 1.$0 0.15 -0.1,
+hambers for :ssistant rofessor
2loor 1x1 1 .,0 .00 %0.,0
Goor Sill 1x1 1 1.$0 0.$0 0.$%
Skirting 1x$ $ .,0 0.15 $.0%
1x$ $ .00 0.15 1.,0
Geductions 1x1 1 1.$0 0.15 -0.1,
:ssociate rofessor oom
2loor 1x1 1 &.&0 .00 1.,0
Goor Sill 1x1 1 1.$0 0.$0 0.$%
Skirting 1x$ $ &.&0 0.15 0.
-
7/26/2019 Estimate guide
51/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
To% !6.#1 S
-
7/26/2019 Estimate guide
52/60
1x$ $ $.0 0.$0 1.1
Staircase oom # 1x1 1 &.&0 .00 1.,0
Staircase oom ## 1x1 1 &.&0 .00 1.,0
F+8% F'oo+
+orridor 1x1 1 &.&0 5.'0 1,.,11x1 1 %,.,0 $.,0 1&.%
1x1 1 &.&0 $.00 .0
1x1 1 &.&0 $.'0 ,.1
1x1 1 &.&0 1.'0 5.1
1x$ $ $.0 0.$0 1.1
1x& & $.0 0.0 5.$$
S,o/( F'oo+
+orridor 1x1 1 &.&0 5.'0 1,.,1
1x1 1 %,.,0 $.,0 1&.%
1x1 1 &.&0 $.00 .0
1x1 1 &.&0 $.'0 ,.1
1x1 1 &.&0 1.'0 5.11x$ $ $.0 0.$0 1.1
To%&' "#$.01 S.
&& 8H6: stone slab $5mm thick in risersand treads of steps* skirting dado andpillar laid in 1$mm (average" thickcement mortar 1& (1 cement &coarse sand" and =ointed ith gre!cement slurr! mixed ith pigment tomatch the shade of the slab including
rubbing and polishing complete.
(single stone is to be used for riser andtreads of steps and the idth of stone forskirting and dado shall be equal to the heightof skirting/ dado ith a minimum length of 1.07."
S%&+
2rom .J. to >.2. Slab Jevel
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
iser $x$' 5% 1.50 0.15 11.
6read $x$5 50 1.50 0.&0 $$.50
Janding $x1 $ 1.50 &.&0 .0
$x1 $ 1.00 &.&0 .0
2rom >.2. Slab Jevel to 2.2.Slab Jevel
iser $x$' 5% 1.50 0.15 11.
6read $x$5 50 1.50 0.&0 $$.50
Janding $x1 $ 1.50 &.&0 .0
$x1 $ 1.00 &.&0 .0
2rom 2.2. Slab Jevel to S.2.Slab Jevel
iser $x$' 5% 1.50 0.15 11.
-
7/26/2019 Estimate guide
53/60
6read
Janding
$x$5
$x1
50
$
1.50
1.50
0.&0
&.&0
$$.50
.0
$x1 $ 1.00 &.&0 .0
Steps to +orridor
$x% , $.0 0.&0 .$x5 10 $.0 0.15 %.&5
Skirting of +orridor
>.2. 1x$ $ 5$.&0 0.15 15.
1x$ $ 5.'0 0.15 1.'1
1x$ $ $.00 0.15 0.0
1x$ $ $.'0 0.15 0.,1
1x$ $ 1.'0 0.15 0.51
1x$x$ $ .$0 0.15 1.,
2.2. 1x$ $ 5$.&0 0.15 15.
1x$ $ 5.'0 0.15 1.'1
1x$ $ $.00 0.15 0.0
1x$ $ $.'0 0.15 0.,11x$ $ 1.'0 0.15 0.51
1x&x$ 0.0 0.15 0.5%
S.2. 1x$ $ 5$.&0 0.15 15.
1x$ $ 5.'0 0.15 1.'1
1x$ $ $.00 0.15 0.0
1x$ $ $.'0 0.15 0.,1
1x$ $ 1.'0 0.15 0.51
To%&' 22!.6 S
&% roviding and fixing ceramic gla)edall tiles conforming to #S 15$$ ofapproved make* colours* shades andsi)e on all and dados over 1$ mmthick bed of cement 7ortar 1& (1cement & coarse sand" and =ointingith gre! cement slurr! ; &.&kg persqm including pointing in hitecement mixed ith matching pigmentcomplete
G+o4/( F'oo+
>ents 6oilet
1x$ $ &.&0 $.&0 15.1,
1x$ $ 5.$0 $.&0 $&.$
@.+. $x$ % 1.%0 $.&0 1$.,,
$x$ % 1.10 $.&0 10.1$
Geductions
G% 1x1 1 1.00 $.10 -$.10
G5 1x$ $ 0.'5 $.10 -&.15
@ 1x1 1 0.0 1.$0 -1.0,
I.>. Jab latform Gado 1x$ $ .00 0.0 '.$0
1x1 1 10.&0 0.0 .1,
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
54/60
1x$ $ 0.0 0.0 0.'$
antr! latform Gado 1x1 1 &.&0 0.0 1.,
1x$ $ 0.0 0.0 0.'$
Jadies 6oilet 1x$ $ &.&0 $.&0 15.1,
1x$ $ %.10 $.&0 1,.,
@.+. $x$ % 1.%0 $.&0 1$.,,
$x$ % 1.10 $.&0 10.1$
Geductions
G% 1x1 1 1.00 $.10 -$.10
G5 1x$ $ 0.'5 $.10 -&.15
2or @ater +ooler :rea 1x1 1 &.&0 $.10 .&
1x$ $ 1.$0 $.10 5.0%
S4> To 16. S
F+8% F'oo+
>ents 6oilet
1x$ $ &.&0 $.&0 15.1,
1x$ $ 5.$0 $.&0 $&.$
@.+. $x$ % 1.%0 $.&0 1$.,,
$x$ % 1.10 $.&0 10.1$
Geductions
G% 1x1 1 1.00 $.10 -$.10
G5 1x$ $ 0.'5 $.10 -&.15
@ 1x1 1 0.0 1.$0 -1.0,
antr! latform Gado 1x1 1 &.&0 0.0 1.,
1x$ $ 0.0 0.0 0.'$Jadies 6oilet
1x$ $ &.&0 $.&0 15.1,
1x$ $ %.10 $.&0 1,.,
@.+. $x$ % 1.%0 $.&0 1$.,,
$x$ % 1.10 $.&0 10.1$
Geductions
G% 1x1 1 1.00 $.10 -$.10
G5 1x$ $ 0.'5 $.10 -&.15
2or @ater +ooler :rea 1x1 1 &.&0 $.10 .&
1x$ $ 1.$0 $.10 5.0%
S4>To%&' :B;122.2 Sqm
S,o/( F'oo+
>ents 6oilet
1x$ $ &.&0 $.&0 15.1,
1x$ $ 5.$0 $.&0 $&.$
@.+. $x$ % 1.%0 $.&0 1$.,,
$x$ % 1.10 $.&0 10.1$
Geductions
G% 1x1 1 1.00 $.10 -$.10
G5 1x$ $ 0.'5 $.10 -&.15
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
55/60
@
I.>. Jab latform Gado
1x1
1x$
1
$
0.0
.00
1.$0
0.0
-1.0,
'.$0
1x1 1 10.&0 0.0 .1,
1x$ $ 0.0 0.0 0.'$
antr! latform Gado 1x1 1 &.&0 0.0 1.,
1x$ $ 0.0 0.0 0.'$
Jadies 6oilet
1x$ $ &.&0 $.&0 15.1,
1x$ $ %.10 $.&0 1,.,
@.+. $x$ % 1.%0 $.&0 1$.,,
$x$ % 1.10 $.&0 10.1$
Geductions
G% 1x1 1 1.00 $.10 -$.10
G5 1x$ $ 0.'5 $.10 -&.15
2or @ater +ooler :rea 1x1 1 &.&0 $.10 .&
1x$ $ 1.$0 $.10 5.0%
S4>To% 16. Sqm
To%&' :ABC;9!.$9 S
&5 roviding and la!ing rectified ceramicgla)ed floor tiles &00x&00mmconforming to #S 15$$ of approvedmake* colour* shade laid on $0 mmthick +ement 7ortar 1% (1 cement %coarse sand" including pointing the
=oints ith hite cement mixed ithmatching pigment etc.* complete.
#n colours such as @hite* #vor!* >re!*2ume ed 3ron*
G+o4/( F'oo+
>ents 6oilet
2loor 1x1 1 &.&0 5.$0 1'.1
Jadies 6oilet
2loor 1x1 1 &.&0 %.10 1&.5&
2or @ater +ooler :rea 1x1 1 &.&0 1.$0 &.
S4> To !.6" S
F+8% F'oo+ Nt!. Same as >round floor S4>To%&' :B; !.6" Sqm
S,o/( F'oo+ Nt!. Same as 2irst floor S4>To% !.6" Sqm
To%&' :ABC1;0.9" S
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
-
7/26/2019 Estimate guide
56/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
& 15 mm thick 7arble ork (machinecut* table rubbed 4 polished" forkitchen platform* vanit! counters*indo sills and similar locations ofrequired si)e laid over $0mm thick
base cement mortar 1% (1 cement %coarse sand" including =oints treatedith hite cement mixed ithmatching pigment including rubbingand polishing to edge moulding togive high gloss finish.
Idaipur green marble
F+8% F'oo+
I.>. Jab latform Gado 1x$ $ .00 0.0 '.$0
1x1 1 .10 0.0 5.%
F+8% F'oo+
S,o/( F'oo+
antr! latform 1x1 1 &.&0 0.0 1.,
antr! latform 1x1 1 &.&0 0.0 1.,
I.>. Jab latform Gado 1x$ $ .00 0.0 '.$0
1x1 1 .10 0.0 5.%
antr! latform 1x1 1 &.&0 0.0 1.,
To%&' 1.26 S
&' xtra for fixing marble /granite stonein facia and drops of idth upto 150mm ith epox! resin based adhesiveinstead of cement mortar includingcleaning etc. complete.
G+o4/( F'oo+
F+8% F'oo+
S,o/( F'oo+
I.>. Jab latform 1x$ $ .00 1$.00
1x1 1 .10 .10
antr! latform 1x1 1 &.&0 &.&0
antr! latform 1x1 1 &.&0 &.&0
I.>. Jab latform 1x$ $ .00 1$.00
1x1 1 .10 .10
antr! latform 1x1 1 &.&0 &.&0
To%&' "2.10 M,%+,
-
7/26/2019 Estimate guide
57/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
&, xtra for making opening of requiredsi)e 4 shape for ash basins/ kitchensink in kitchen platform* vanit!counters and similar location inmarble/>ranite/stone ork including
making necessar! holes for pillar tapsetc. including rubbing and polishing ofcut edges etc. complete
G+o4/( F'oo+
I.>. Jab latform 1x$ $ $.00
antr! latform 1x1 1 1.00
F+8% F'oo+
S,o/( F'oo+
antr! latform 1x1 1 1.00
I.>. Jab latform 1x$ $ $.00
antr! latform 1x1 1 1.00
To%&' #.00 E&
& +ement concrete flooring ith cementconcrete 1$% (1 cement $ coarsesand % graded stone aggregate$0mm" finished ith a floating coat ofneat cement..
%0 mm thick
6errace 1x1 1 .50 11.10 105.%5
1x1 1 &.50 .00 &1.50
1x$ $ &.'0 $.,0 $0.'$
1x1 1 &,.&0 .00 &%%.'01x1 1 &.&0 .00 $.'0
Hn plinth protection 1x1 1 1''.1% 1.00 1''.1%
To%&' #09.21 S.
%0 roviding and appl!ing plaster ofparis putt! over plastered all surfaceincluding scaffolding complete
Ipto $ mm thickness to make surfaceeven and smooth in line and level.
Nuantit! same as 1$ mm thickcement plaster %&0.,
To%&' !06.9$ S.
%1 roviding and appl!ing plaster ofparis putt! over plastered ceilingsurface including scaffoldingcomplete.
-
7/26/2019 Estimate guide
58/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
Ipto $ mm thickness to make surfaceeven and smooth in line and level.
Nuantit! same as mm thick cementplaster
%$ roviding and appl!ing $mm thickread! mix exterior grade putt! (3irlaall care* :lltek Superfine @/ of(F+J"* E.8. all putt!" on alls tomake the surface smooth and even.
Nuantit! same as 1, mm thickcement plaster
%& @all painting ith acr!lic premium
emulsion (plastic" paint ($
nd
top mostapproved branded qualit!" to give aneven shade.
Hn ne ork (6o or more coats"
Nuantit! same as mm thick cement
plaster
Nuantit! same as 1$ mm thickcement plaster
%% ainting ne exterior surface (to ormore coats" ith 7#I7
6K6IG paint as permanufacturerAs specifications to giveprotective and decorative finishincluding cleaning ashing of surfaceetc. complete ith
Hn ne ork (6o or more coats "
Nuantit! same as 1, mm thick
cement plaster
1,05.0$
To%&' 1$0".02 S.
&$&&.&1
To%&' 2.1 S.
1,05.0$
%&0.,
To%&' 6112.00 S.
To%&' 2.1 S.
-
7/26/2019 Estimate guide
59/60
S.No P&+%4'&+8 D,%&' No L B D@H Q% U/%
%5 7aking 50mm thick plinth protectionof plain cement concrete 1& (1cement & coarse sand gradedcrushed stone aggregate $0mmnominal si)e" over '5mm bed of dr!
brick ballast %0mm nominal si)e ellrammed and consolidated andgrouted ith sand including finishingthe top smooth.
1x1 1 1''.1% 1.00 1''.1%
To%&' 1##.1! S.
-
7/26/2019 Estimate guide
60/60
S4> E//,,+ A88%%. E//,,+ E?,4%7, E//,,+ C.G.S%&%, A+'. M&+%. Bo&+( C.G.S%&%, A+'. M&+%. Bo&+( C.G.S%&%, A+'. M&+%. Bo&+(