estidama initiative
DESCRIPTION
Abu Dhabi Sustainability Group Quarterly Meeting Estidama Program: Moving Abu Dhabi Toward a Sustainable Future John Madden, Senior Planning Manager Abu Dhabi Urban Planning Council . Estidama Initiative. A mandated policy to create a new sustainable framework for Abu Dhabi Plan 2030 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/1.jpg)
Abu Dhabi Sustainability Group Quarterly Meeting
Estidama Program: Moving Abu Dhabi Toward a Sustainable Future John Madden, Senior Planning Manager Abu Dhabi Urban Planning Council
![Page 2: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/2.jpg)
A mandated policy to create a new sustainable framework for Abu Dhabi Plan 2030
Provide direction through four clear pillars: environmental, economic, social and cultural
Promotes a new sense of responsibility by going beyond other sustainable initiatives
Estidama is the symbol of an inspired vision for governance and community development
Estidama Initiative
1
2
3
4
5
![Page 3: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/3.jpg)
Philosophy of Estidama• Launched in 2008, Estidama is not a program, a rating method or
something people do, it is a vision and a desire to achieve a new sustainable way of life in the Arab world.
• Sustainability is part of the values and ideals of the UAE. The legacy of sustainable living is the guiding force behind Estidama. From it, Estidama derives a new mindset for building a forward thinking global capital.
• It acknowledges that the unique cultural, climatic and economic development needs of the region require a localized definition of sustainability.
![Page 4: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/4.jpg)
The Need for Estidama • Estidama aims to revive the ecological and cultural sensitivity
(traditions) of the people to their environment.• Estidama arose from the need to properly plan, design, construct and
operate sustainable developments with respect to the local traditions and climate.
• In order to achieve the goal of Estidama, developers, design teams and even residents need to rethink the design and planning process, the harsh climatic nature of the region.
• This touches all aspects of life in Abu Dhabi - the way we build, the way we resource, the way we live our daily lives, the choices we make as employers - all in an effort to attain a sustainable state of living.
• Ultimately, the success of Estidama will depend on everyone in the Emirate to create a better future for all
![Page 5: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/5.jpg)
Responsive Sustainable Urbanism
• Projects that achieve Estidama adhere to these characteristics: • Utilise a systems-based approach to look at communities,
developments and buildings holistically, rather than in isolation from one another.
• Commit to sustainability targets that must be achieved, along with those that are desirable – all within economically responsible long term parameters.
• Use of the Estidama Integrative Design Process (EIDP) to promote cooperation and collaboration between all stakeholders to attain synergy in the process of planning, design and construction.
![Page 6: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/6.jpg)
Promotion of Sustainable
Developments
Higher Efficiency in The
Built EnvironmentEfficient Use of Existing
Natural Resources
Vision forEnvironmental Improvement
CA
RB
ON
R
EDU
CTI
ON
Protection and Stewardship of
Existing Habitat and Bio-
Diversity
![Page 7: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/7.jpg)
Pearl Rating System (PRS)
Pearl Rating Syste
m
Community
New & Existing
BuildingsVillas
Pearls Rating System
Integrated Development Process
Natural Systems
Livable Communiti
esWaterEnergyMaterial
sInnovative Practice
2 Pearl = 60
Optional Credits
3 Pearl = 90
Optional Credits
4 Pearl = 120
Optional Credits
5 Pearl = 150
Optional Credits
Rating Systems Components
1 Pearl = 21
Required Credits
![Page 8: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/8.jpg)
Water
Comparison to construction practices today
Multi Use Residential Tower = -21%
Commercial Office Tower = -40%
Community Neighborhood = -16%
ApproximateReductions
1 Pearl
![Page 9: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/9.jpg)
What is a Pearl Rating?
2 Pearl = 60
Optional Credits
• Multi-Design options• Rating system has many credits from which to chose • Over 70 pathways = 2 Pearl
1 Pearl = 21
Required Credits
• Seven component sections• Multi-Design options
![Page 10: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/10.jpg)
Building Sector Example
12
16
36
45
45
28 2
182
Integ
rated
Dev
elopm
ent P
roces
s
Natural
Sys
tems
Livab
le Buil
dings
Water
Energy
Materia
ls
Innov
ating
Prac
tice
(Sec
tor) P
ossib
le
Total
60 Credits = 2 Pearl
10
![Page 11: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/11.jpg)
Pearl Rating Systems 1 Pearl Villa
![Page 12: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/12.jpg)
Tools for Design and Assessment
12
![Page 13: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/13.jpg)
Energy
Comparison to construction practices today
Multi Use Residential Tower = -24%
Commercial Office Tower = -32%
Community Neighborhood = -24%
ApproximateReductions
1 Pearl
![Page 14: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/14.jpg)
Waste
Construction Phase Waste Reductions
Building = -30% (weight or volume)
Community = -50% (weight or volume)
ApproximateReductions
1 Pearl
![Page 15: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/15.jpg)
• Achieve energy and water savings• Increase return on investments• Create healthier places to live, work,
study and play• Improve productivity, retail sales and
student performance• Attain greater tenant retention• Enhanced reputation and marketability• Receive recognition from the leadership of
Abu Dhabi
Estidama Benefits:
![Page 16: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/16.jpg)
Sheikh Zayed Desert Learning Centre
• Project Type:Sustainable Building
• Location:Al Ain
• Building Size (GFA):7600 m2
• Proposed Program:Interpretative, educational and learning facilities
Project Snapshot
![Page 17: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/17.jpg)
The Sheikh Zayed Desert Learning Centre project will involve the redevelopment of the 40-year old Al Ain Zoo to include a wildlife themed safari, destination resort, retail and residential communities.
The building is an accessible sculpture that affords multiple spatial experiences.
The idea of geographic strata has been expressed through the building’s system of ramps and multiple levels. Nestled into the land and plantings, the building further emulates the natural world.
Sheikh Zayed Desert Learning CentreProject Snapshot
![Page 18: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/18.jpg)
Desert Learning Centre – Designed savings
By using an integrative design process, the Design Team helped to shape a seamless site and building solution.
The tangible benefits of this approach include:• Targeting 50% reduction in annual energy consumption compared to
ASHRAE reference building.• Anticipating 15% of energy balance to be provided by renewable
sources.• High performance envelope, reducing peak external heat gain by 70%
compared to ASHRAE reference.• Water use reduction by over 75% from a comparable building.• Construction waste diversion from landfill expected to exceed 50%.• Creating a building that by its very design will tell a compelling story of
Estidama, without requiring extensive exhibits or narrative.
![Page 19: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/19.jpg)
Executive Council Mandate
![Page 20: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/20.jpg)
• All New Communities to be 1 Pearl
• All New Buildings and Villas to be 1 Pearl• All Government led Buildings etc. 2 Pearl
Estidama Mandate
![Page 21: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/21.jpg)
Implementation Process
![Page 22: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/22.jpg)
Community Rating: All new community developments with a permanent residential population over 1000Applicable from June 2010
Building Rating: All new buildingsApplicable from September 2010
Villa Rating: All new private and governmentApplicable from September 2010
Estidama - Timeline
![Page 23: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/23.jpg)
Design
Stage
Construction Stage
Operational Stage
Planning ApprovalAchieved
DesignRating
Achieved
ConstructionRating
Achieved
OperationalRating
Achieved
Planning for Estidama
The Pearl Rating System (PRS)
Development Review
Estidama - Stages
![Page 24: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/24.jpg)
Master Developments
UPC PCRSApproval
UPC Development Review (Planning for Estidama)
Design Rating
UPC PBRS or PVRSApproval 2 Pearl +
Design Rating
Municipality PBRS or PVRS Approval 1 Pearl
Design Rating
Government Buildings or Voluntary Pathway
Communities1 Pearl Mandate
New Buildings and Villas
Building Permit NOC
PRS & Building Permit
Estidama – Integrated Approval Process
![Page 25: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/25.jpg)
Information & Training
![Page 26: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/26.jpg)
Estidama Training Programme:
Target Audience Government Professionals
Municipalities, Utility providers Industry Professionals
Architects, Developers, Engineers, Planners ….
Public Villa Owners Students Business Groups…
Developers
Utilities
ADTA
EAD UPC
The Estidama
Team
Municipalites
![Page 27: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/27.jpg)
Understanding and Awareness Course:This course provides an overview of Estidama and the Pearl Rating Systems requirements and process, as well as the context and benefits of sustainable development in Abu Dhabi
Applying the Pearl Building Rating System:This 1.5-day course will provide development and consulting industry professionals with the ability to understand and apply the Pearl Building Rating System to new building projects.
Applying the Pearl Community Rating System:This 1.5-day course will provide development and consulting industry professionals with the ability to understand and apply the Pearl Community Rating System to new projects.
Applying the Pearl Villa Rating System:This 1-day course will provide development and consulting industry professionals with the ability to understand and apply the Pearl Villa Rating System to new villa projects
Estidama Training Programme:
![Page 28: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/28.jpg)
Private Sector
Government
Pearl Assessor
Line of
Communication
Pearl Qualified
Professional
Engineer
Contractor
Owner
Architect
Registration online:
http://www.prometric.com/UPC/default.htm
Estidama PQP Examination
![Page 29: Estidama Initiative](https://reader033.vdocuments.mx/reader033/viewer/2022061506/5681649c550346895dd67cd3/html5/thumbnails/29.jpg)
Our website provides detailed information on the Pearl Rating Systems. http://www.estidama.org/
Estidama Information