標準電機standard electric works co., ltd. - led ......standard electric works co., ltd. 5f.,...

2
STANDARD ELECTRIC WORKS CO., LTD. www.sew.com.tw 5F., NO.105, JHONGCHENG RD., TUCHENG DIST., NEW TAIPEI CITY 23674, TAIWAN (R.O.C.) TEL: 886-2-22681528 FAX: 886-2-22681529 e-mail: [email protected] OPERATION PRINCIPLE Initially, SYNC, BUS and GEN LED's are lit Red and the outer ring will show a single Red traveling LED. When voltage and phase angle are unmatched the outer ring LED rotates according to the system phase difference. When the BUS voltage is at ±10% of nominal system voltage, the BUS LED will change from Red to Green signifying proper BUS voltage has been established. When the GEN voltage is at ±10% of nominal system voltage the GEN LED will change from Red to Green signifying proper GEN voltage has been established. Finally, once all system voltages match and the systems are synchronized, the SYNC LED will change from Red to Green. All LED's are now Green when the systems are synchronized. ● Input voltage: 110V AC, 120V AC or 240V AC ● Square shape panel 96 x 96mm ● 3 bi-colored LED indicators for "SYNC", "GEN" and "BUS" ● 24 LEDs in a circle display the phase angle and the frequency differences between 2 networks ● 360° indication ● 12 o'clock position LED is bi-colored ● PC window, ABS resin frame, PC case V 01 LS-96 SYNC Model LED SYNCHROSCOPE

Upload: others

Post on 26-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 標準電機Standard Electric Works Co., Ltd. - LED ......STANDARD ELECTRIC WORKS CO., LTD. 5F., NO.105, JHONGCHENG RD., TUCHENG DIST., NEW TAIPEI CITY 23674, TAIWAN (R.O.C.) TEL:

STANDARD ELECTRIC WORKS CO., LTD.www.sew.com.tw

5F., NO.105, JHONGCHENG RD., TUCHENG DIST., NEW TAIPEI CITY 23674, TAIWAN (R.O.C.)

TEL: 886-2-22681528FAX: 886-2-22681529

e-mail: [email protected]

OPERATION PRINCIPLE

● Initially, SYNC, BUS and GEN LED's are lit Red and the outer ring will show a single Red traveling LED. When voltage and phase angle are unmatched the outer ring LED rotates according to the system phase difference.

● When the BUS voltage is at ±10% of nominal system voltage, the BUS LED will change from Red to Green signifying proper BUS voltage has been established. When the GEN voltage is at ±10% of nominal system voltage the GEN LED will change from Red to Green signifying proper GEN voltage has been established.

● Finally, once all system voltages match and the systems are synchronized, the SYNC LED will change from Red to Green. All LED's are now Green when the systems are synchronized.

●Inputvoltage:110VAC,120VACor240VAC

●Squareshapepanel96x96mm●3bi-coloredLEDindicatorsfor

"SYNC", "GEN" and "BUS"●24LEDsinacircledisplaythephaseangleandthefrequencydifferencesbetween2networks

●360°indication●12o'clockpositionLEDisbi-colored●PCwindow,ABSresinframe,PC

case

V 01

LS-96 SYNCModel

LED SYNCHROSCOPE

Page 2: 標準電機Standard Electric Works Co., Ltd. - LED ......STANDARD ELECTRIC WORKS CO., LTD. 5F., NO.105, JHONGCHENG RD., TUCHENG DIST., NEW TAIPEI CITY 23674, TAIWAN (R.O.C.) TEL:

STANDARD ELECTRIC WORKS CO., LTD.www.sew.com.tw

5F., NO.105, JHONGCHENG RD., TUCHENG DIST., NEW TAIPEI CITY 23674, TAIWAN (R.O.C.)

TEL: 886-2-22681528FAX: 886-2-22681529

e-mail: [email protected]

83.1098.10

88.10

88.1

0

96.0

96.0

96.0

DIMENSIONS

P1B P2B P2G P1G

U

V

u

v

BUS1 2

LOAD

U

V

u

v

GEN1 2

LOAD

CAT III 300V

WIRING DIAGRAM

LS-96 SYNCModel

SPECIFICATIONSLS-96 SYNC

(110V)LS-96 SYNC

(120V)LS-96 SYNC

(240V)NominalInputVoltage 110VAC 120VAC 240VAC

Overload 1.25×NominalvoltageFrequencyRange 40~70Hz

Scale SLOW / FASTPointerLED 15degrees/LED

BUS LED(Bi-colored)

Green:100V-121VAC Green:108V-132VAC Green:216V-264VACRed:<100Vor>121VAC

Red:<108Vor>132VAC

Red:<216Vor>264VAC

GEN LED(Bi-colored)

Green:100V-121VAC Green:108V-132VAC Green:216V-264VACRed:<100Vor>121VAC

Red:<108Vor>132VAC

Red:<216Vor>264VAC

SYNC LED(Bi-colored)

Green:"GEN"and"BUS"aresynchronizedRed:"GEN"and"BUS"arenotsynchronized