Page 1: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Establishing Relieving Capacities

Prepared for Chief’s meeting October 9, 2019

By Joseph F. Ball, P. E.

Page 2: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Overview of Session

• Review of Section IV Pressure Relief Capacity Requirements• ASME Requirements• NBIC Installation Requirements

• Establishment of Relieving Capacity for Section IV Pressure Relief Valves

Section IV Capacity Requirements

Page 3: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics:

Overpressure protection requirements are defined by boiler manufacturer.

Nameplate shall include:(HG-530.1(a)(3)) Safety or safety relief valve capacity (minimum) as determined according to HG-400.1(d) and HG-400.2(e)

Heating area must be marked

Section IV Capacity Requirements

Page 4: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics:

Same for cast iron or aluminum (HG-530.2(c)(3)) – depends upon number of sections

Section IV Capacity Requirements

Page 5: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics:

Modular Boilers

• Each module has its own nameplate with capacity required for that module

• Aggregate capacity (and heating area) is applied to a single nameplate for the combined unit

Section IV Capacity Requirements

Page 6: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics: HG-400.1

(d) The minimum valve capacity in pounds per hourshall be determined by dividing the maximum Btu/hr(kW) output at the boiler nozzle obtained by the firingof any fuel for which the unit is installed by 1,000(0.646). In every case, the requirement of (e) shall be met.(e) The safety valve capacity for each steam boiler shallbe such that with the fuel burning equipment installed,and operated at maximum capacity, the pressure cannotrise more than 5 psi (35 kPa) above the maximum allowableworking pressure.

Section IV Capacity Requirements

Page 7: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics: HG-400.2

(e) The required steam-relieving capacity, in poundsper hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined by dividing the maximum output in Btu/hr (kW) at the boiler nozzle obtained by the firing of any fuel for which the unit is installed by 1,000 (0.646). In every case, the requirements of (g) shall be met.

Section IV Capacity Requirements

Page 8: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics: HG-400.2

(g) Safety relief valve capacity for each boiler with asingle safety relief valve shall be such that, with the fuel burning equipment installed and operated at maximum capacity, the pressure cannot rise more than 10% above the maximum allowable working pressure. When more than one safety relief valve is used, the overpressure shall be limited to 10% above the set pressure of the highest set valve allowed by (c).

Section IV Capacity Requirements

Page 9: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics:

Water Heaters and Storage Tanks

(HLW-602.1) Nameplate includes Maximum allowable input in Btu/hrElectric heaters may use kW or BTU/Hr. or both

Storage tanks are marked “Storage Only”

Section IV Capacity Requirements

Page 10: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

The Basics:

Capacity provided must be equal to or greater than unit output:

WProvided > WOutput

Section IV Capacity Requirements

Page 11: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

How do we know WOutput?

• Non-mandatory Appendix A gives a method for estimating capacity based on heating surface.

• HG-403 discusses calculation of heating surface• Boiler area outside of furnace measured

circumferentially• Waterwall and other surfaces done as projected

area

• Non-mandatory Appendix B gives a method based on fuel burned

Section IV Capacity Requirements

Page 12: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

How do we know WOutput?

NBIC Table 2.9.1.3 duplicates Sec. IV , Appendix A

• Additional data for copper finned watertubes• Additional corrections for BTU inputs above

8000 BTU/Hr for firetube boilers and 16,000 BTU/hr for watertube boilers

NBIC also mandates meeting maximum output (Table 2.9.1.3 may not supply adequate capacity)

Section IV Capacity Requirements

Page 13: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

How do we know WOutput?

Section IV Capacity Requirements

Page 14: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

How do we know WOutput?

Other than the 2 non-mandatory appendices, the method for determining Safety or safety relief valve capacity (minimum) is not specified.

Cautions:• Appendix A may under-estimate the required

capacity in some cases.• Appendix B uses 75% efficiency (output/input) -

some designs are better than this

Section IV Capacity Requirements

Page 15: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

How do we know WOutput?

How accurate are the manufacturer’s ratings?

• Effects if under-rated

• Effects if over-rated

Section IV Capacity Requirements

Page 16: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Additional Verification Methods

• Accumulation test – pressure cannot exceed specified overpressure

• Measuring maximum fuel burned and calculating capacity based on fuel heating value

• Measure feedwater flow to get maximum evaporative capacity

Section IV Capacity Requirements

Page 17: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

How do we know WProvided?

• This is the certified capacity of the pressure relief valves provided and installed.

• Capacity is certified through the National Board Capacity Certification program.

• Certified capacities listed in NB-18

Section IV Capacity Requirements

Page 18: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

NB Capacity Certification Process

Design reviewed before testing begins Original design test (with steam) determines

capacity rating for the model being tested 3, 4, or 9 valves tested for performance and flow +/-5% consistency requirement must be met

Section IV Capacity Requirements

Page 19: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

NB Capacity Certification Process

2 production valves witnessed at factory by NB rep. and tested for performance and capacity

Each design recertified every 6 years Manufacturer’s Quality system audited every 3

years

Section IV Capacity Requirements

Page 20: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Assurance of Adequate Capacity

• All valve designs include a 0.9 safety factor on capacity

• Very unlikely that capacity of the valve selected will equal the exact system output

Section IV Capacity Requirements

Page 21: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Assurance of Adequate Capacity

Hot water heater valves are rated for thermal relief (AGA rating) and pressure relief rating at overpressure.

Application based upon the AGA rating is much more conservative.

Section IV Capacity Requirements

Page 22: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Responsibility

ASME: Safety Relief Valves shall be installed by either the installer or the manufacturer (water heaters)

NBIC: The owner-user is responsible for ensuring that installations meet all the requirements of the Jurisdiction at the point of installation including licensing, registration, or certification of those performing installations.

Section IV Capacity Requirements

Page 23: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Responsibility

Jurisdictional installation inspection (and periodic re-inspection) is the vital backstop assuring that adequate capacity has been supplied, and the

pressure relief valves are properly installed.

Section IV Capacity Requirements

Page 24: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

National Board “Opportunities”

NB-131: Recommended Boiler and Pressure Vessel Safety Legislation (2004)NB-132: Recommended Administrative Boiler and Pressure vessel Safety Rules and Regulations (2004)

Both need to be updated (applicable overpressure is included in NB-132)

Impact on NBIC will need to be assessedSection IV Capacity Requirements

Page 25: Establishing Relieving Capacities Only...The required steam-relieving capacity, in pounds per hour (kg/hr), of the pressure-relieving device or devices on a boiler shall be determined

Section IV Capacity Requirements