Mar 01Escape Systems
AIRCREW SYSTEMS
ILSMT
BRIEFING
NACES ADVANCED ELECTRONIC SEQUENCER PROGRAM
FUTURE ADVANCED SEQUENCER TECHNOLOGY (FAST)
Mar 01Escape Systems
FAST PROGRAM BACKGROUND
99 AFFORDABLE READINESS INITIATIVE SUBMITTED TO REDUCE COST OF CURRENT NACES SEQUENCER BY 50 PERCENT USING COMMERCIAL OFF THE SHELF COMPONENTS.
NACES P3I PHASE II PROGRAM TO DEVELOP ADVANCED CAPABILITY TECHNOLOGY SEQUENCER CONCEPT ALSO USING COMMERCIAL OFF-THE-SHELF (COTS) COMPONENTS FOR REDUCED COST.
DECEMBER 98 MERGER OF BOTH PROGRAMS TO DESIGN, MANUFACTURE AND QUALIFY AN ADVANCED ELECTRONIC SEQUENCER WITH COTS COMPONENTS FOR NACES.
Mar 01Escape Systems
FAST PROGRAM DESCRIPTION
PROGRAM – QUALIFY ADVANCED SEQUENCER AND APPROVE ECP TO MEET NACES LOT 16 PRODUCTION
INSTALLATION
– DEVELOP OBSOLESENCE PLAN TO CONTROL COTS COMPONENTS
– 10 YEAR WARRANTY FOR FAST CONCURRENT WITH PRODUCTION
– NAVICP PBL TO SUPPORT BASELINE AND FAST IN THE FLEET
TECHNICAL – EVENT TIMING NOW BASED ON AIRSPEED, ALTITUDE AND NOW ALSO RESULTANT DECELERATION. LIMITS
PARACHUTE OPENING LOADS. GOOD FOR EXPANDED AIRCREW POPULATION
– CONTINUOUS SENSING FOR IMPROVED FAULT TOLERANCE AND OPTIMIZED PERFORMANCE
– NEW REDUCED PARACHUTE DEPLOYMENT TIMING “BACK OF BOAT” MODE
– IMPROVED DATA RECORDING CAPABILITY
– TEMPERATURE COMPENSATION OF SENSORS
– SURFACE MOUNT TECHNOLOGY
– ADA95 LANGUAGE
– EXPANSION CAPABILITY TO INTERFACE WITH EMERGING TECHNOLOGIES
Mar 01Escape Systems
0 100 200 300 400 500 600 700
100 200 300 400 500 600 700
0
2000
12000
10000
8000
6000
4000
18000
16000
14000
20000
0
Altitude (ft)
Velocity (KEAS) Velocity (KEAS)
Mode 5
Mode 4
Mode 3
Mode 2
Mode 1
Mode 1 High G Recovery Mode
Low G Recovery Mode
Mode 5
Current NACES Modes FAST NACES Modes
FAST Mode Comparison
Mar 01Escape Systems
Light Crew Forward Throw -Sea Level
100 lb Crew
0
200
400
600
800
1000
1200
1400
0 100 200 300 400 500 600 700
Airspeed (KEAS)
Fo
rwar
d T
hro
w (
ft)
NACES
17G FAST
15G FAST
Mar 01Escape Systems
Mishap Data Trends
F/A-18 EJECTION SUMMARY
0
5,000
10,000
15,000
20,000
25,000
0 100 200 300 400 500 600AIRSPEED (KNOTS)
ALT
ITUD
E (F
T A
GL
or M
SL)
Mar 01Escape Systems
FASTACCOMPLISHMENTS
SYSTEMS REQUIREMENTS DOCUMENT COMPLETED BOTH PDR AND CDR COMPLETED HARDWARE DESIGN COMLETED
– HAY WIRES INCOPORATED INTO FINAL PRODUCTION UNIT
THERMAL BATTERY DELTA QUAL COMPLETED FLIGHT SOFTWARE COMPLETED TEST SOFTWARE COMPLETED HALT TESTING COMPLETED FULL SYSTEM DVT AND QUAL
– TWO INFLIGHT TESTS REMAIN
QUALIFICATION TESTING COMPLETED (FQA SCHEDULED FOR MAR 22)– DAHLGREN WORKING CURRENTLY WORKING HERO / EMI QBS
PBL WITH NAVICP FOR SUPPORT OF BASELINE AND FAST IN WORK CURRENTLY PROCESSING ECP 9304; GOAL IS LOT 16 PRODUCTION
Mar 01Escape Systems
FAST/NACES SequencerFAST/NACES SequencerReliability OverviewReliability Overview
NACESNACES FFAASSTT
Field Failure Experience
• Electronic Components
• Sensor Tolerance (Code 70)
• Connector Cracks
120
65
93
• Total Field Failures 278
Lessons Learned From NACES
• HALT Proved COTS Reliability
• Sensor Calibration / OITS ARI
• Stainless Steel Connectors
• Projected Failures
<7
<5
~132
52% Reduction in Field Failures52% Reduction in Field Failures