    SOUTHERN TRANSPORT DEVELOPMENT PROJECT

    Highway Section from Kurundugahahetekma to Matara

    Contract No. RDA/STDP/ADB/K-G.1

    Claculation of Monthly Price Adjustment

    PC No. 2

    Month: Jul-03

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 DESIGN FEE 22,287,733.50 Base Index Oct-01 Oct-01

    Applicable Index July. 2003 July. 2003Used Index July. 2003 July. 2003

    This Month Amount Subject to Escalation 22,287,733.50

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee

    USD Portion 100%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 197.50 0.70044053 A Base "Pn"

    L3 Unskilled labour 3 215.40 240.40 0.34818942 Labour

    M4 Cement 2 202.30 225.40 0.22837370 +

    M6 Rubble 1 184.60 185.70 0.00595883 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 154.30 (0.00518135) +

    M13 Reinforcing Steel 4 135.70 186.80 1.50626382 Equipment

    M14 Structural Steel 7 146.50 187.40 1.95426621M21 Formwork Timber 2 304.10 311.60 0.04932588 B Current "Pn"

    M30 Bitumen 3 231.80 231.80 0.00000000 Labour

    M38 Electrical Fittings 0 111.80 116.60 0.00000000 + 13 87 101.9 102.2

    M44 Hume Pipes 2 166.70 178.30 0.13917217 Materials

    P2 Heavy Equipment 26 183.90 183.90 0.00000000 +

    P3 Fuel 21 268.70 293.20 1.91477484 Equipment

    6.84158405

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    - 0.966 0.00 6.84158405 677,831.04 0.03041274

    100

    Price Adjustment Amount in SLR Currency (This Period) 677,831.04

    DescriptionIndex Ref:

    Currency

    -

    F

    22,287,733.50

    F Pn

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    2/70

    PC No. From Start up to July 2005

    Month: March - July 2004

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Work done (BOQ) (Civil Works) 54,296,374.14 Base Index Oct-01 Oct-01

    Applicable Index Ave. from March - July 2004

    Used Index Ave. from March - July 2004

    This Month Amount Subject to Escalation 54,296,374.14

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 200.70 0.84140969 A Base "Pn"

    L3 Unskilled labour 3 215.40 242.40 0.37604457 Labour

    M4 Cement 2 202.30 232.06 0.29421651 +

    M6 Rubble 1 184.60 198.20 0.07367281 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 158.24 0.19896373 +

    M13 Reinforcing Steel 4 135.70 273.66 4.06661754 Equipment

    M14 Structural Steel 7 146.50 251.20 5.00273038

    M21 Formwork Timber 2 304.10 333.32 0.19217363 B Current "Pn"

    M30 Bitumen 3 231.80 231.80 0.00000000 Labour

    M38 Electrical Fittings 0 111.80 117.60 0.00000000 + 13 87 101.9 103.8

    M44 Hume Pipes 2 166.70 188.14 0.25722855 Materials

    P2 Heavy Equipment 26 183.90 183.90 0.00000000 +P3 Fuel 21 268.70 302.90 2.67286937 Equipment

    13.97592678

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    4,984,682.31 0.966 36,921,534.42 13.97592678 1,244,472.03 0.07162495

    100

    Price Adjustment Amount in SLR Currency (This Period) 6,229,154.34

    DescriptionIndex Ref:

    Currency

    Pn

    F

    36,921,534.42

    17,374,839.72

    F

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    3/70

    PC No. From Start up to July 2005

    Month: 29 July 03 to 15 Aug 03

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Work done (BOQ) (Matl Supply) 51,137,280.00 Base Index Oct-01 Oct-01

    Applicable Index Aug. 2003 Aug. 2003

    Used Index Aug. 2003 Aug. 2003

    This Month Amount Subject to Escalation 51,137,280.00

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 0%

    USD Portion 100%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 197.50 0.70044053 A Base "Pn"

    L3 Unskilled labour 3 215.40 240.40 0.34818942 Labour

    M4 Cement 2 202.30 225.40 0.22837370 +

    M6 Rubble 1 184.60 192.70 0.04387866 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 154.30 (0.00518135) +

    M13 Reinforcing Steel 4 135.70 195.70 1.76860722 Equipment

    M14 Structural Steel 7 146.50 211.80 3.12013652

    M21 Formwork Timber 2 304.10 311.60 0.04932588 B Current "Pn"

    M30 Bitumen 3 231.80 231.80 0.00000000 Labour

    M38 Electrical Fittings 0 111.80 116.70 0.00000000 + 13 87 101.9 102.3

    M44 Hume Pipes 2 166.70 178.30 0.13917217 Materials

    P2 Heavy Equipment 26 183.90 183.90 0.00000000 +P3 Fuel 21 268.70 293.20 1.91477484 Equipment

    8.30771759

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    - 0.966 0.00 8.30771759 1,647,859.98 0.03222424

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,647,859.98

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    -

    51,137,280.00

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    4/70

    PC No. From Start up to July 2005

    Month: 16 Aug 03 to 30 Oct 03

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Work done (BOQ) - Material Supply 35,821,852.08 Base Index Oct-01 Oct-01

    Work done (BOQ) - Material Supply 11,940,617.36 A licable Index Ave. from Au - Oct 2003

    Used Index Ave. from Aug - Oct 2003

    This Month Amount Subject to Escalation 47,762,469.44

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 0%

    USD Portion 100%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Pro ortion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref Input Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 197.50 0.70044053 A Base "Pn"

    L3 Unskilled labour 3 215.40 240.40 0.34818942 Labour

    M4 Cement 2 202.30 225.40 0.22837370 +

    M6 Rubble 1 184.60 192.70 0.04387866 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 154.50 0.00518135 +

    M13 Reinforcing Steel 4 135.70 195.80 1.77155490 E ui ment

    M14 Structural Steel 7 146.50 213.23 3.18846416

    M21 Formwork Timber 2 304.10 315.87 0.07740875 B Current "Pn"

    M30 Bitumen 3 231.80 231.80 0.00000000 Labour

    M38 Electrical Fittings 0 111.80 116.87 0.00000000 + 13 87 101.9 102.33

    M44 Hume Pipes 2 166.70 178.30 0.13917217 MaterialsP2 Heavy Equipment 26 183.90 183.90 0.00000000 +

    P3 Fuel 21 268.70 299.67 2.42043171 Equipment

    8.92309535

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Proportion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    - 0.966 0.00 8.92309535 1,760,998.90 0.03686993100

    Price Adjustment Amount in SLR Currency (This Period) 1,760,998.90

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    -

    47,762,469.44

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    5/70

    PC No. From Start up to July 2005

    Month: 1 Nov 03 to 21 Nov 03

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Work done (BOQ) (Matl Supply) 35,749,766.93 Base Index Oct-01 Oct-01

    Applicable Index Nov 2003 Nov 2003

    Used Index Nov 2003 Nov 2003

    This Month Amount Subject to Escalation 35,749,766.93

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 0%

    USD Portion 100%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Pro ortion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+E

    L1 Skilled labour 8 181.60 197.50 0.70044053 A Base "Pn"

    L3 Unskilled labour 3 215.40 240.40 0.34818942 Labour

    M4 Cement 2 202.30 225.40 0.22837370 +

    M6 Rubble 1 184.60 192.70 0.04387866 Materials 13 87 101.9 101

    M7 Metal 8 154.40 154.60 0.01036269 +

    M13 Reinforcing Steel 4 135.70 196.70 1.79808401 E ui ment

    M14 Structural Steel 7 146.50 215.20 3.28259386

    M21 Formwork Timber 2 304.10 327.80 0.15586978 B Current "Pn"

    M30 Bitumen 3 231.80 231.80 0.00000000 Labour

    M38 Electrical Fittings 0 111.80 117.40 0.00000000 + 13 87 101.9 102

    M44 Hume Pipes 2 166.70 178.30 0.13917217 MaterialsP2 Heavy Equipment 26 183.90 183.90 0.00000000 +

    P3 Fuel 21 268.70 302.90 2.67286937 Equipment

    9.37983419

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Proportion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,E

    (Lo+Mo+

    - 0.966 0.00 9.37983419 1,683,881.95 0.047101100

    Price Adjustment Amount in SLR Currency (This Period) 1,683,881.95

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    -

    35,749,766.93

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    6/70

    PC No. From Start up to July 2005

    Month: 1 Nov 03 to 21 Nov 03

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Work done (BOQ) (Matl Supply) 11,916,588.98 Base Index Oct-01 Oct-01

    Applicable Index Nov 2003 Nov 2003

    Used Index Nov 2003 Nov 2003

    This Month Amount Subject to Escalation 11,916,588.98

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 0%

    USD Portion 100%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 197.50 0.70044053 A Base "Pn"

    L3 Unskilled labour 3 215.40 240.40 0.34818942 Labour

    M4 Cement 2 202.30 225.40 0.22837370 +

    M6 Rubble 1 184.60 192.70 0.04387866 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 154.60 0.01036269 +

    M13 Reinforcing Steel 4 135.70 196.70 1.79808401 Equipment

    M14 Structural Steel 7 146.50 215.20 3.28259386

    M21 Formwork Timber 2 304.10 327.80 0.15586978 B Current "Pn"

    M30 Bitumen 3 231.80 231.80 0.00000000 Labour

    M38 Electrical Fittings 0 111.80 117.40 0.00000000 + 13 87 101.9 102.5

    M44 Hume Pipes 2 166.70 178.30 0.13917217 Materials

    P2 Heavy Equipment 26 183.90 183.90 0.00000000 +P3 Fuel 21 268.70 302.90 2.67286937 Equipment

    9.37983419

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    - 0.966 0.00 9.37983419 561,293.98 0.04710190

    100

    Price Adjustment Amount in SLR Currency (This Period) 561,293.98

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    -

    11,916,588.98

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    7/70

    PC No. From Start up to July 2005

    Month: 22 Nov 03 to 23 Jan 04

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Work done (BOQ) (Matl Supply) 40,350,751.05 Base Index Oct-01 Oct-01

    Applicable Index Ave. from Nov 03 - Jan 2004

    Used Index Ave. from Nov 03 - Jan 2004

    This Month Amount Subject to Escalation 40,350,751.05

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 0%

    USD Portion 100%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 197.50 0.70044053 A Base "Pn"

    L3 Unskilled labour 3 215.40 240.40 0.34818942 Labour

    M4 Cement 2 202.30 223.90 0.21354424 +

    M6 Rubble 1 184.60 192.70 0.04387866 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 154.77 0.01917098 +

    M13 Reinforcing Steel 4 135.70 198.20 1.84229919 Equipment

    M14 Structural Steel 7 146.50 215.20 3.28259386

    M21 Formwork Timber 2 304.10 329.07 0.16422230 B Current "Pn"

    M30 Bitumen 3 231.80 231.80 0.00000000 Labour

    M38 Electrical Fittings 0 111.80 117.27 0.00000000 + 13 87 101.9 102.9

    M44 Hume Pipes 2 166.70 178.30 0.13917217 Materials

    P2 Heavy Equipment 26 183.90 183.90 0.00000000 +P3 Fuel 21 268.70 302.90 2.67286937 Equipment

    9.42638072

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    - 0.966 0.00 9.42638072 2,397,427.77 0.05941470

    100

    Price Adjustment Amount in SLR Currency (This Period) 2,397,427.77

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    -

    40,350,751.05

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    8/70

    PC No. From Start u to Jul 2005

    Month: 28 May 04 to 28 Feb 05

    A Amount Sub ect to Price Ad ustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Variations 9,636,849.20 Base Index Oct-01 Oct-01

    Applicable Index Ave. from May 04 - Feb 05

    Used Index Ave. from May 04 - Feb 05

    This Month Amount Subject to Escalation 9,636,849.20

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Ru ee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Ru ee Pro ortion B.2 United States Dollar Pro ortion

    % Indices Sum all Coefficient % Indices

    Ref In ut in ut Base This Mth In uts Ref In ut Base Thi

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+

    L1 Skilled labour 8 181.60 212.56 1.36387665 A Base "Pn"

    L3 Unskilled labour 3 215.40 249.01 0.46810585 Labour

    M4 Cement 2 202.30 253.44 0.50558576 +

    M6 Rubble 1 184.60 210.21 0.13873239 Materials 13 87 101.9

    M7 Metal 8 154.40 162.04 0.39585492 +

    M13 Reinforcing Steel 4 135.70 270.72 3.97995578 Equipment

    M14 Structural Steel 7 146.50 266.80 5.74812287

    M21 Formwork Timber 2 304.10 375.17 0.46741204 B Current "Pn"

    M30 Bitumen 3 231.80 258.75 0.34879206 LabourM38 Electrical Fittin s 0 111.80 117.74 0.00000000 + 13 87 101.9

    M44 Hume Pipes 2 166.70 202.58 0.43047391 Materials

    P2 Heavy Equipment 26 183.90 185.58 0.23752039 +

    P3 Fuel 21 268.70 384.05 9.01507257 Equipment

    23.09950519

    C From Start u to Jul 2005

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Proportion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) Z

    100 Ixb Lo Z

    a (b+c+d) (Ln,M

    (Lo+

    1,462,257.24 0.966 6,553,057.46 23.09950519 270,800.49 0.08

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,733,057.73

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    6,553,057.46

    3,083,791.74

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    9/70

    PC No. From Start up to July 2005

    Month: 28 Feb 05 to 31 May 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Variations 5,629,263.78 Base Index Oct-01 Oct-01

    Applicable Index Ave. from Feb 05 - May 05

    Used Index Ave. from Feb 05 - May 05

    This Month Amount Subject to Escalation 5,629,263.78

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Pro ortion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+E

    L1 Skilled labour 8 181.60 239.93 2.56960352 A Base "Pn"

    L3 Unskilled labour 3 215.40 270.50 0.76740947 Labour

    M4 Cement 2 202.30 280.78 0.77587741 +

    M6 Rubble 1 184.60 222.90 0.20747562 Materials 13 87 101.9 101

    M7 Metal 8 154.40 166.18 0.61036269 +

    M13 Reinforcing Steel 4 135.70 273.90 4.07369197 E ui ment

    M14 Structural Steel 7 146.50 282.18 6.48300341

    M21 Formwork Timber 2 304.10 413.65 0.72048668 B Current "Pn"

    M30 Bitumen 3 231.80 314.15 1.06578947 Labour

    M38 Electrical Fittings 0 111.80 118.18 0.00000000 + 13 87 101.9 104.0

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 434.88 12.98764421 Equipment

    31.70454880

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Proportion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,E

    (Lo+Mo+

    1,172,355.20 0.966 3,827,899.37 31.70454880 158,185.25 0.087814100

    Price Adjustment Amount in SLR Currency (This Period) 1,330,540.45

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    3,827,899.37

    1,801,364.41

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    10/70

    PC No. From Start up to July 2005

    Month: 28 Feb 05 to 31 May 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Variations 1,235,519.81 Base Index Oct-01 Oct-01

    Applicable Index Ave. from Feb 05 - May 05

    Used Index Ave. from Feb 05 - May 05

    This Month Amount Subject to Escalation 1,235,519.81

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Pro ortion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+E

    L1 Skilled labour 8 181.60 239.93 2.56960352 A Base "Pn"

    L3 Unskilled labour 3 215.40 270.50 0.76740947 Labour

    M4 Cement 2 202.30 280.78 0.77587741 +

    M6 Rubble 1 184.60 222.90 0.20747562 Materials 13 87 101.9 101

    M7 Metal 8 154.40 166.18 0.61036269 +

    M13 Reinforcing Steel 4 135.70 273.90 4.07369197 E ui ment

    M14 Structural Steel 7 146.50 282.18 6.48300341

    M21 Formwork Timber 2 304.10 413.65 0.72048668 B Current "Pn"

    M30 Bitumen 3 231.80 314.15 1.06578947 Labour

    M38 Electrical Fittings 0 111.80 118.18 0.00000000 + 13 87 101.9 104

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 434.88 12.98764421 Equipment

    31.70454880

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Proportion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,E

    (Lo+Mo+

    257,310.39 0.966 840,153.47 31.70454880 41,844.18 0.105836100

    Price Adjustment Amount in SLR Currency (This Period) 299,154.57

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    840,153.47

    395,366.34

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    11/70

    PC No. From Start up to July 2005

    Month: 01 June 05 to 30 June 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Variations 5,691,204.50 Base Index Oct-01 Oct-01

    Applicable Index June 2005 June 2005

    Used Index June 2005 June 2005

    This Month Amount Subject to Escalation 5,691,204.50

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This M

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn

    L1 Skilled labour 8 181.60 241.90 2.65638767 A Base "Pn"

    L3 Unskilled labour 3 215.40 273.50 0.80919220 Labour

    M4 Cement 2 202.30 289.00 0.85714286 +

    M6 Rubble 1 184.60 259.70 0.40682557 Materials 13 87 101.9 1

    M7 Metal 8 154.40 176.90 1.16580311 +

    M13 Reinforcing Steel 4 135.70 273.90 4.07369197 E ui ment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 428.50 0.81815192 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 119.90 0.00000000 + 13 87 101.9 1

    M44 Hume Pipes 2 166.70 221.00 0.65146971 MaterialsP2 Heavy Equipment 26 183.90 189.50 0.79173464 +

    P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.19985558

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Proportion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZL

    100 Ixb Lo ZL

    a (b+c+d) (Ln,Mn

    (Lo+M

    1,428,078.07 0.966 3,870,019.06 38.19985558 153,337.46 0.0841

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,581,415.53

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    3,870,019.06

    1,821,185.44

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    12/70

    PC No. From Start up to July 2005

    Month: 01 May 05 to 30 June 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 Dayworks 85,643.00 Base Index Oct-01 Oct-01

    Applicable Index June 2005 June 2005

    Used Index June 2005 June 2005

    This Month Amount Subject to Escalation 85,643.00

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 241.90 2.65638767 A Base "Pn"

    L3 Unskilled labour 3 215.40 273.50 0.80919220 Labour

    M4 Cement 2 202.30 289.00 0.85714286 +

    M6 Rubble 1 184.60 259.70 0.40682557 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 176.90 1.16580311 +

    M13 Reinforcing Steel 4 135.70 273.90 4.07369197 Equipment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 428.50 0.81815192 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 119.90 0.00000000 + 13 87 101.9 103.2

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.19985558

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    21,490.16 0.966 58,237.24 38.19985558 2,307.47 0.08419651

    100

    Price Adjustment Amount in SLR Currency (This Period) 23,797.63

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    58,237.24

    27,405.76

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    13/70

    PC No.

    Month: 01 July 05 to 30 July 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil Works (70/30) (3,136,892.48) Base Index Oct-01 Oct-01

    BOQ - Balance material (100 USD) 3,521,799.89 A licable Index Jul 2005 Jul 2005

    Used Index July 2005 July 2005

    This Month Amount Subject to Escalation (3,136,892.48)

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Pro ortion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 241.90 2.65638767 A Base "Pn"

    L3 Unskilled labour 3 215.40 273.50 0.80919220 Labour

    M4 Cement 2 202.30 289.00 0.85714286 +

    M6 Rubble 1 184.60 259.70 0.40682557 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 176.90 1.16580311 +

    M13 Reinforcing Steel 4 135.70 273.40 4.05895357 E ui ment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 428.50 0.81815192 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 119.90 0.00000000 + 13 87 101.9 104.3

    M44 Hume Pipes 2 166.70 221.00 0.65146971 MaterialsP2 Heavy Equipment 26 183.90 189.50 0.79173464 +

    P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.18511718

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Proportion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    (786,827.99) 0.966 -2,133,086.89 38.18511718 223,741.90 0.08885719100

    Price Adjustment Amount in SLR Currency (This Period) (563,086.09)

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    (2,133,086.89)

    2,517,994.30

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    14/70

    PC No.

    Month: 01 July 05 to 30 July 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 11,556,455.71 Base Index Oct-01 Oct-01

    Applicable Index July 2005 July 2005

    Used Index July 2005 July 2005

    This Month Amount Subject to Escalation 11,556,455.71

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 241.90 2.65638767 A Base "Pn"

    L3 Unskilled labour 3 215.40 273.50 0.80919220 Labour

    M4 Cement 2 202.30 289.00 0.85714286 +

    M6 Rubble 1 184.60 259.70 0.40682557 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 176.90 1.16580311 +

    M13 Reinforcing Steel 4 135.70 273.40 4.05895357 Equipment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 428.50 0.81815192 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 119.90 0.00000000 + 13 87 101.9 104.3

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.18511718

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    2,898,710.38 0.966 7,858,389.88 38.18511718 328,599.74 0.08885719

    100

    Price Adjustment Amount in SLR Currency (This Period) 3,227,310.12

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    7,858,389.88

    3,698,065.83

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    15/70

    PC No.

    Month: 01 August 05 to 30 August 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil Works 3,397,033.90 Base Index Oct-01 Oct-01

    BOQ - Bal Material 595,666.64 Applicable Index Aug 2005 Aug 2005

    Used Index Aug 2005 Aug 2005

    This Month Amount Subject to Escalation 3,397,033.90

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 241.90 2.65638767 A Base "Pn"

    L3 Unskilled labour 3 215.40 273.50 0.80919220 Labour

    M4 Cement 2 202.30 296.80 0.93425606 +

    M6 Rubble 1 184.60 265.80 0.43986999 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 177.80 1.21243523 +

    M13 Reinforcing Steel 4 135.70 273.50 4.06190125 Equipment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 428.50 0.81815192 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 119.90 0.00000000 + 13 87 101.9 104.8

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.34485460

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    855,643.81 0.966 2,309,983.05 38.34485460 176,420.78 0.10484278

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,032,064.59

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    2,309,983.05

    1,682,717.49

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    16/70

    PC No.

    Month: 01 August 05 to 30 August 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 1,761,943.17 Base Index Oct-01 Oct-01

    Applicable Index Aug 2005 Aug 2005

    Used Index Aug 2005 Aug 2005

    This Month Amount Subject to Escalation 1,761,943.17

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 241.90 2.65638767 A Base "Pn"

    L3 Unskilled labour 3 215.40 273.50 0.80919220 Labour

    M4 Cement 2 202.30 296.80 0.93425606 +

    M6 Rubble 1 184.60 265.80 0.43986999 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 177.80 1.21243523 +

    M13 Reinforcing Steel 4 135.70 273.50 4.06190125 Equipment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 428.50 0.81815192 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 119.90 0.00000000 + 13 87 101.9 104.8

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.34485460

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    443,797.69 0.966 1,198,121.36 38.34485460 59,112.65 0.10484278

    100

    Price Adjustment Amount in SLR Currency (This Period) 502,910.34

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    1,198,121.36

    563,821.81

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    17/70

    PC No.

    Month: 01 Sep 05 to 30 Sep 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil works 934,449.42 Base Index Oct-01 Oct-01

    BOQ - Bal Material 610,444.14 Applicable Index Sep 2005 Sep 2005

    Used Index Sep 2005 Sep 2005

    This Month Amount Subject to Escalation 934,449.42

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 297.20 0.93821058 +

    M6 Rubble 1 184.60 267.10 0.44691224 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 177.80 1.21243523 +

    M13 Reinforcing Steel 4 135.70 275.80 4.12969786 Equipment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 433.60 0.85169352 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.51678978

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    236,424.20 0.966 635,425.61 38.51678978 86,910.84 0.09556229

    100

    Price Adjustment Amount in SLR Currency (This Period) 323,335.04

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    635,425.61

    909,467.95

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    18/70

    PC No.

    Month: 01 Sep 05 to 30 Sep 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 4,827,307.06 Base Index Oct-01 Oct-01

    Applicable Index Sep 2005 Sep 2005

    Used Index Sep 2005 Sep 2005

    This Month Amount Subject to Escalation 4,827,307.06

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 297.20 0.93821058 +

    M6 Rubble 1 184.60 267.10 0.44691224 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 177.80 1.21243523 +

    M13 Reinforcing Steel 4 135.70 275.80 4.12969786 Equipment

    M14 Structural Steel 7 146.50 284.90 6.61296928

    M21 Formwork Timber 2 304.10 433.60 0.85169352 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    38.51678978

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,221,352.56 0.966 3,282,568.80 38.51678978 147,618.73 0.09556229

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,368,971.29

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    3,282,568.80

    1,544,738.26

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    19/70

    PC No.

    Month: 01 Oct 05 to 31 Oct 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil Works 6,767,381.22 Base Index Oct-01 Oct-01

    BOQ - Balance material 1,335,434.57 Applicable Index Oct 2005 Oct 2005

    Used Index Oct 2005 Oct 2005

    This Month Amount Subject to Escalation 6,767,381.22

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 297.20 0.93821058 +

    M6 Rubble 1 184.60 282.10 0.52816901 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 182.80 1.47150259 +

    M13 Reinforcing Steel 4 135.70 275.80 4.12969786 Equipment

    M14 Structural Steel 7 146.50 289.10 6.81365188

    M21 Formwork Timber 2 304.10 465.20 1.05951989 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105.4

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    39.26562288

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,745,497.26 0.966 4,601,819.23 39.26562288 327,938.38 0.09367001

    100

    Price Adjustment Amount in SLR Currency (This Period) 2,073,435.64

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    4,601,819.23

    3,500,996.56

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    20/70

    PC No.

    Month: 01 Oct 05 to 31 Oct 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 2,328,294.38 Base Index Oct-01 Oct-01

    Applicable Index Oct 2005 Oct 2005

    Used Index Oct 2005 Oct 2005

    This Month Amount Subject to Escalation 2,328,294.38

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 297.20 0.93821058 +

    M6 Rubble 1 184.60 282.10 0.52816901 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 182.80 1.47150259 +

    M13 Reinforcing Steel 4 135.70 275.80 4.12969786 Equipment

    M14 Structural Steel 7 146.50 289.10 6.81365188

    M21 Formwork Timber 2 304.10 465.20 1.05951989 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105.4

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    39.26562288

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    600,532.37 0.966 1,583,240.18 39.26562288 69,789.23 0.09367001

    100

    Price Adjustment Amount in SLR Currency (This Period) 670,321.60

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    1,583,240.18

    745,054.20

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    21/70

    PC No.

    Month: 01 Nov 05 to 31 Nov 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil Works 3,577,247.77 Base Index Oct-01 Oct-01

    BOQ - Balance material 806,935.21 Applicable Index Nov 2005 Nov 2005

    Used Index Nov 2005 Nov 2005

    This Month Amount Subject to Escalation 3,577,247.77

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 302.20 0.98764212 +

    M6 Rubble 1 184.60 332.50 0.80119177 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 185.70 1.62176166 +

    M13 Reinforcing Steel 4 135.70 277.20 4.17096536 Equipment

    M14 Structural Steel 7 146.50 289.10 6.81365188

    M21 Formwork Timber 2 304.10 510.30 1.35613285 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    40.07621671

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    941,719.96 0.966 2,432,528.48 40.07621671 173,447.28 0.08887192

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,115,167.24

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    2,432,528.48

    1,951,654.50

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    22/70

    PC No.

    Month: 01 Nov 05 to 31 Nov 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 1,705,557.22 Base Index Oct-01 Oct-01

    Applicable Index Nov 2005 Nov 2005

    Used Index Nov 2005 Nov 2005

    This Month Amount Subject to Escalation 1,705,557.22

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 302.20 0.98764212 +

    M6 Rubble 1 184.60 332.50 0.80119177 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 185.70 1.62176166 +

    M13 Reinforcing Steel 4 135.70 277.20 4.17096536 Equipment

    M14 Structural Steel 7 146.50 289.10 6.81365188

    M21 Formwork Timber 2 304.10 510.30 1.35613285 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    40.07621671

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    448,992.46 0.966 1,159,778.91 40.07621671 48,504.37 0.08887192

    100

    Price Adjustment Amount in SLR Currency (This Period) 497,496.83

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    1,159,778.91

    545,778.31

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    23/70

    PC No.

    Month: 01 Dec 05 to 31 Dec 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil Works 2,921,245.37 Base Index Oct-01 Oct-01

    BOQ - Balance Material 477,427.74 Applicable Index Dec 2005 Dec 2005

    Used Index Dec 2005 Dec 2005

    This Month Amount Subject to Escalation 2,921,245.37

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 302.20 0.98764212 +

    M6 Rubble 1 184.60 332.50 0.80119177 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 185.70 1.62176166 +

    M13 Reinforcing Steel 4 135.70 277.50 4.17980840 Equipment

    M14 Structural Steel 7 146.50 289.10 6.81365188

    M21 Formwork Timber 2 304.10 519.30 1.41532391 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    40.14425081

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    770,331.10 0.966 1,986,446.85 40.14425081 145,462.68 0.10300239

    100

    Price Adjustment Amount in SLR Currency (This Period) 915,793.78

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    1,986,446.85

    1,412,226.26

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    24/70

    PC No.

    Month: 01 Dec 05 to 31 Dec 05

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 1,083,311.19 Base Index Oct-01 Oct-01

    Applicable Index Dec 2005 Dec 2005

    Used Index Dec 2005 Dec 2005

    This Month Amount Subject to Escalation 1,083,311.19

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 243.00 2.70484581 A Base "Pn"

    L3 Unskilled labour 3 215.40 274.30 0.82033426 Labour

    M4 Cement 2 202.30 302.20 0.98764212 +

    M6 Rubble 1 184.60 332.50 0.80119177 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 185.70 1.62176166 +

    M13 Reinforcing Steel 4 135.70 277.50 4.17980840 Equipment

    M14 Structural Steel 7 146.50 289.10 6.81365188

    M21 Formwork Timber 2 304.10 519.30 1.41532391 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 120.00 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 221.00 0.65146971 Materials

    P2 Heavy Equipment 26 183.90 189.50 0.79173464 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    40.14425081

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    285,668.68 0.966 736,651.61 40.14425081 35,706.77 0.10300239

    100

    Price Adjustment Amount in SLR Currency (This Period) 321,375.45

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    736,651.61

    346,659.58

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    25/70

    PC No.

    Month: 01 Jan 06 to 31 Jan 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil works 2,479,063.16 Base Index Oct-01 Oct-01

    BOQ - Balance material 831,387.79 Applicable Index Jan 2006 Jan 2006

    Used Index Jan 2006 Jan 2006

    This Month Amount Subject to Escalation 2,479,063.16

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 302.20 0.98764212 +

    M6 Rubble 1 184.60 339.80 0.84073673 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 191.20 1.90673575 +

    M13 Reinforcing Steel 4 135.70 285.50 4.41562270 Equipment

    M14 Structural Steel 7 146.50 314.40 8.02252560

    M21 Formwork Timber 2 304.10 519.30 1.41532391 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 129.00 0.00000000 + 13 87 101.9 105.1

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    44.53627536

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    725,249.64 0.966 1,685,762.95 44.53627536 203,498.22 0.12525372

    100

    Price Adjustment Amount in SLR Currency (This Period) 928,747.86

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    1,685,762.95

    1,624,688.00

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    26/70

    PC No.

    Month: 01 Jan 06 to 31 Jan 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 3,864,210.19 Base Index Oct-01 Oct-01

    Applicable Index Jan 2006 Jan 2006

    Used Index Jan 2006 Jan 2006

    This Month Amount Subject to Escalation 3,864,210.19

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 302.20 0.98764212 +

    M6 Rubble 1 184.60 339.80 0.84073673 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 191.20 1.90673575 +

    M13 Reinforcing Steel 4 135.70 285.50 4.41562270 Equipment

    M14 Structural Steel 7 146.50 314.40 8.02252560

    M21 Formwork Timber 2 304.10 519.30 1.41532391 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 129.00 0.00000000 + 13 87 101.9 105.1

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    44.53627536

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,130,474.25 0.966 2,627,662.93 44.53627536 154,882.14 0.12525372

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,285,356.39

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    2,627,662.93

    1,236,547.26

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    27/70

    PC No.

    Month: 01 Feb 06 to 28 Feb 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - civil works 4,350,403.38 Base Index Oct-01 Oct-01

    BOQ - balance material 276,812.66 Applicable Index Feb 2006 Feb 2006

    Used Index Feb 2006 Feb 2006

    This Month Amount Subject to Escalation 4,350,403.38

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 319.10 1.15472071 +

    M6 Rubble 1 184.60 351.00 0.90140845 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 192.70 1.98445596 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 346.80 9.57064846

    M21 Formwork Timber 2 304.10 556.10 1.65734956 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 131.00 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    46.74980154

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,335,965.79 0.966 2,958,274.30 46.74980154 216,800.96 0.12990325

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,552,766.75

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    2,958,274.30

    1,668,941.74

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    28/70

    PC No.

    Month: 01 Feb 06 to 28 Feb 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 3,578,800.51 Base Index Oct-01 Oct-01

    Applicable Index Feb 2006 Feb 2006

    Used Index Feb 2006 Feb 2006

    This Month Amount Subject to Escalation 3,578,800.51

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 319.10 1.15472071 +

    M6 Rubble 1 184.60 351.00 0.90140845 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 192.70 1.98445596 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 346.80 9.57064846

    M21 Formwork Timber 2 304.10 556.10 1.65734956 B Current "Pn"

    M30 Bitumen 3 231.80 399.50 2.17040552 Labour

    M38 Electrical Fittings 0 111.80 131.00 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 488.60 17.18608113 Equipment

    46.74980154

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,099,014.19 0.966 2,433,584.35 46.74980154 148,767.30 0.12990325

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,247,781.49

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    2,433,584.35

    1,145,216.16

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    29/70

    PC No.

    Month: 01 March 06 to 30 April 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil Works 7,991,624.54 Base Index Oct-01 Oct-01

    BOQ - Balance material (2,691,501.45) Applicable Index Apr 2006 Apr 2006

    Used Index Apr 2006 Apr 2006

    This Month Amount Subject to Escalation 7,991,624.54

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 331.90 1.28126545 +

    M6 Rubble 1 184.60 367.80 0.99241603 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 199.10 2.31606218 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 350.80 9.76177474

    M21 Formwork Timber 2 304.10 570.20 1.75008221 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 132.00 0.00000000 + 13 87 101.9 105.5

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 202.10 2.57313757 +P3 Fuel 21 268.70 566.80 23.29772981 Equipment

    55.85353677

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    2,932,052.82 0.966 5,434,304.69 55.85353677 (19,999.73) 0.14904972

    100

    Price Adjustment Amount in SLR Currency (This Period) 2,912,053.09

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    5,434,304.69

    (134,181.60)

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    30/70

    PC No.

    Month: 01 March 06 to 30 April 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 5,549,359.31 Base Index Oct-01 Oct-01

    Applicable Index Apr 2006 Apr 2006

    Used Index Apr 2006 Apr 2006

    This Month Amount Subject to Escalation 5,549,359.31

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 331.90 1.28126545 +

    M6 Rubble 1 184.60 367.80 0.99241603 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 199.10 2.31606218 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 350.80 9.76177474

    M21 Formwork Timber 2 304.10 570.20 1.75008221 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 132.00 0.00000000 + 13 87 101.9 105.5

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 202.10 2.57313757 +P3 Fuel 21 268.70 566.80 23.29772981 Equipment

    55.85353677

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    2,036,008.39 0.966 3,773,564.33 55.85353677 264,681.74 0.14904972

    100

    Price Adjustment Amount in SLR Currency (This Period) 2,300,690.13

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    3,773,564.33

    1,775,794.98

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    31/70

    PC No.

    Month: 01 March 06 to 30 April 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 DAYWORKS 503,022.94 Base Index Oct-01 Oct-01

    Applicable Index Apr 2006 Apr 2006

    Used Index Apr 2006 Apr 2006

    This Month Amount Subject to Escalation 503,022.94

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 331.90 1.28126545 +

    M6 Rubble 1 184.60 367.80 0.99241603 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 199.10 2.31606218 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 350.80 9.76177474

    M21 Formwork Timber 2 304.10 570.20 1.75008221 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 132.00 0.00000000 + 13 87 101.9 105.5

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 202.10 2.57313757 +P3 Fuel 21 268.70 566.80 23.29772981 Equipment

    55.85353677

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    184,554.45 0.966 342,055.60 55.85353677 23,992.14 0.14904972

    100

    Price Adjustment Amount in SLR Currency (This Period) 208,546.59

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    342,055.60

    160,967.34

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    32/70

    PC No.

    Month: 01 May 06 to 31 May 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil works 4,667,615.46 Base Index Oct-01 Oct-01

    BOQ - balance material 3,393,108.55 Applicable Index May 2006 May 2006

    Used Index May 2006 May 2006

    This Month Amount Subject to Escalation 4,667,615.46

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 334.10 1.30301532 +

    M6 Rubble 1 184.60 368.10 0.99404117 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 195.50 2.12953368 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 351.50 9.79522184

    M21 Formwork Timber 2 304.10 570.20 1.75008221 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 132.30 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 566.80 23.29772981 Equipment

    54.46553783

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,669,947.83 0.966 3,173,978.51 54.46553783 797,782.22 0.16325430

    100

    Price Adjustment Amount in SLR Currency (This Period) 2,467,730.05

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    3,173,978.51

    4,886,745.50

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    33/70

    PC No.

    Month: 01 May 06 to 31 May 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 3,406,725.93 Base Index Oct-01 Oct-01

    Applicable Index May 2006 May 2006

    Used Index May 2006 May 2006

    This Month Amount Subject to Escalation 3,406,725.93

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 334.10 1.30301532 +

    M6 Rubble 1 184.60 368.10 0.99404117 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 195.50 2.12953368 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 351.50 9.79522184

    M21 Formwork Timber 2 304.10 570.20 1.75008221 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 132.30 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 566.80 23.29772981 Equipment

    54.46553783

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,218,835.32 0.966 2,316,573.63 54.46553783 177,972.05 0.16325430

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,396,807.37

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    2,316,573.63

    1,090,152.30

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    34/70

    PC No.

    Month: 01 May 06 to 31 May 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 DAYWORKS 432,575.65 Base Index Oct-01 Oct-01

    Applicable Index May 2006 May 2006

    Used Index May 2006 May 2006

    This Month Amount Subject to Escalation 432,575.65

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 262.90 3.58149780 A Base "Pn"

    L3 Unskilled labour 3 215.40 290.10 1.04038997 Labour

    M4 Cement 2 202.30 334.10 1.30301532 +

    M6 Rubble 1 184.60 368.10 0.99404117 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 195.50 2.12953368 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 351.50 9.79522184

    M21 Formwork Timber 2 304.10 570.20 1.75008221 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 132.30 0.00000000 + 13 87 101.9 105.3

    M44 Hume Pipes 2 166.70 304.60 1.65446911 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 566.80 23.29772981 Equipment

    54.46553783

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    154,763.98 0.966 294,151.44 54.46553783 22,598.35 0.16325430

    100

    Price Adjustment Amount in SLR Currency (This Period) 177,362.33

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    294,151.44

    138,424.21

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    35/70

    PC No.

    Month: 01 June 06 to 31 July 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ - Civil works 5,997,238.62 Base Index Oct-01 Oct-01

    BOQ - Balance material 564,336.99 Applicable Index July 2006 July 2006

    Used Index July 2006 July 2006

    This Month Amount Subject to Escalation 5,997,238.62

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 266.70 3.74889868 A Base "Pn"

    L3 Unskilled labour 3 215.40 295.30 1.11281337 Labour

    M4 Cement 2 202.30 338.50 1.34651508 +

    M6 Rubble 1 184.60 376.20 1.03791983 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 203.40 2.53886010 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 351.50 9.79522184

    M21 Formwork Timber 2 304.10 587.50 1.86386057 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 136.50 0.00000000 + 13 87 101.9 105.5

    M44 Hume Pipes 2 166.70 327.60 1.93041392 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 596.10 25.58764421 Equipment

    57.88170452

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    2,280,230.13 0.966 4,078,122.26 57.88170452 397,580.69 0.16009187

    100

    Price Adjustment Amount in SLR Currency (This Period) 2,677,810.82

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    4,078,122.26

    2,483,453.35

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    36/70

    PC No.

    Month: 01 June 06 to 31 July 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 2,249,643.21 Base Index Oct-01 Oct-01

    Applicable Index July 2006 July 2006

    Used Index July 2006 July 2006

    This Month Amount Subject to Escalation 2,249,643.21

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 266.70 3.74889868 A Base "Pn"

    L3 Unskilled labour 3 215.40 295.30 1.11281337 Labour

    M4 Cement 2 202.30 338.50 1.34651508 +

    M6 Rubble 1 184.60 376.20 1.03791983 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 203.40 2.53886010 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 351.50 9.79522184

    M21 Formwork Timber 2 304.10 587.50 1.86386057 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 136.50 0.00000000 + 13 87 101.9 105.5

    M44 Hume Pipes 2 166.70 327.60 1.93041392 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 596.10 25.58764421 Equipment

    57.88170452

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    855,344.36 0.966 1,529,757.38 57.88170452 115,247.87 0.16009187

    100

    Price Adjustment Amount in SLR Currency (This Period) 970,592.23

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    1,529,757.38

    719,885.83

    x

    xx=

    = xx

    xx=

    = x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    37/70

    PC No.

    Month: 01 June 06 to 31 July 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 DAYWORKS 2,665,026.11 Base Index Oct-01 Oct-01

    Applicable Index July 2006 July 2006

    Used Index July 2006 July 2006

    This Month Amount Subject to Escalation 2,665,026.11

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 266.70 3.74889868 A Base "Pn"

    L3 Unskilled labour 3 215.40 295.30 1.11281337 Labour

    M4 Cement 2 202.30 338.50 1.34651508 +

    M6 Rubble 1 184.60 376.20 1.03791983 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 203.40 2.53886010 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 351.50 9.79522184

    M21 Formwork Timber 2 304.10 587.50 1.86386057 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 136.50 0.00000000 + 13 87 101.9 105.5

    M44 Hume Pipes 2 166.70 327.60 1.93041392 Materials

    P2 Heavy Equipment 26 183.90 193.20 1.31484502 +P3 Fuel 21 268.70 596.10 25.58764421 Equipment

    57.88170452

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    1,013,278.48 0.966 1,812,217.75 57.88170452 136,527.69 0.16009187

    100

    Price Adjustment Amount in SLR Currency (This Period) 1,149,806.17

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    1,812,217.75

    852,808.36

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    38/70

    PC No.

    Month: 01 Aug 06 to 31 Aug 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 BOQ 667,636.30 Base Index Oct-01 Oct-01

    Applicable Index Aug 2006 Aug 2006

    Used Index Aug 2006 Aug 2006

    This Month Amount Subject to Escalation 667,636.30

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 266.70 3.74889868 A Base "Pn"

    L3 Unskilled labour 3 215.40 295.30 1.11281337 Labour

    M4 Cement 2 202.30 339.60 1.35739001 +

    M6 Rubble 1 184.60 382.10 1.06988082 Materials 13 87 101.9 101.9

    M7 Metal 8 154.40 206.00 2.67357513 +

    M13 Reinforcing Steel 4 135.70 289.50 4.53352985 Equipment

    M14 Structural Steel 7 146.50 351.50 9.79522184

    M21 Formwork Timber 2 304.10 589.10 1.87438343 B Current "Pn"

    M30 Bitumen 3 231.80 469.10 3.07118205 Labour

    M38 Electrical Fittings 0 111.80 136.90 0.00000000 + 13 87 101.9 105.5

    M44 Hume Pipes 2 166.70 327.60 1.93041392 Materials

    P2 Heavy Equipment 26 183.90 222.40 5.44317564 +P3 Fuel 21 268.70 625.40 27.87755862 Equipment

    64.48802336

    C Price Adjustment Amount in SLR Currency

    C.1 Sri Lanka Rupee (SLR) Proportion C.3 United States Dollar US$ Pro ortion

    0.966 (V-Vna) Px(Ixc-Ixb) a b (Ln) ZLo

    100 Ixb Lo ZLn

    a (b+c+d) (Ln,Mn,En)

    (Lo+Mo+E

    282,816.69 0.966 453,992.68 64.48802336 35,349.46 0.16545992

    100

    Price Adjustment Amount in SLR Currency (This Period) 318,166.15

    DescriptionIndex Ref:

    F Pn

    F

    Currency

    453,992.68

    213,643.62

    x

    xx=

    =xx

    xx=

    =x

    =

    =

    =

    =

    =

    = x

    +

    +

    +

    +

    x=

    =

    = x

    +

    +

    +

    +

    x

  • 7/27/2019 Escalation Revised

    39/70

    PC No.

    Month: 01 Aug 06 to 31 Aug 06

    A Amount Subject to Price Adjustment for this Month

    No. Amount

    (SLR) SLR US$

    1 VARIATIONS 1,589,495.09 Base Index Oct-01 Oct-01

    Applicable Index Aug 2006 Aug 2006

    Used Index Aug 2006 Aug 2006

    This Month Amount Subject to Escalation 1,589,495.09

    Amount Due for Each Currency Proportion Amount

    (SLR)

    Sri Lanka Rupee 68%

    USD Portion 32%

    B Price Adjustment Factor

    B.1 Sri Lanka Rupee Proportion B.2 United States Dollar Proportion

    % Indices Sum all Coefficient (%) Indices

    Ref Input input Base This Mth Inputs Ref In ut Base This Mth

    Px Ixb Ixc Px(Ixb-Ixc)/Ixb a (b+c+d) (Lo+Mo+Eo) (Ln+Mn+En)

    L1 Skilled labour 8 181.60 266.70 3.74889868 A Base "Pn"

    L3