AGC/DOT Technical Conference Brian DeWald, NYSDOT Construction Division Erosion and Sediment Control E&S Control Workshop 2002 P The Department, Contractors and Regulators (DEC, DEP, APA, etc) are faced with increasing expectations concerning water quality protection. < Water Quality for drinking water supplies < Recreational uses of stream, rivers, waterways < Habitat Preservation for flora and fauna < NPDES Phase 2 Regulations -Clean Water Act

Upload: others

Post on 16-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

AGC/DOT Technical ConferenceBrian DeWald, NYSDOT Construction Division

Erosion and Sediment Control

E&S Control Workshop 2002

PThe Department, Contractors and Regulators(DEC, DEP, APA, etc) are faced with increasingexpectations concerning water quality protection.< Water Quality for drinking water supplies< Recreational uses of stream, rivers, waterways< Habitat Preservation for flora and fauna< NPDES Phase 2 Regulations -Clean Water Act

E&S Control Workshop 2002

PMaintenance of Water Quality is a JOINT RESPONSIBILITY

PErosion & Sedimentation Control Activities:< Increased Awareness within the Dept & Public< Risks must be managed in an equitable fashion< Compensation should be equitable to work performed< Some projects have experienced problems

E&S Control Workshop 2002

P Department Responsibilities:< Design Biddable & Buildable E&SC Plan

– Identify and Protect environmental resources– Address Permit Requirements – Address Sequencing/Phasing/Schedule Constraints

< Compensate the Contractor fairly for completed work< Adjust in the field as necessary< Document connections to MS4, eliminate illict

connections

E&S Control Workshop 2002

PChanges:< More Detailed Designs< Good Plans show contours< CADD Files available upon request

E&S Control Workshop 2002

PContractor Responsibilities< KEEP THE WATER CLEAN< Read and Understand the permits

– Understand threshholds for NationWide Permits (NWP’s)< Modify E&SC Plan and Schedule in accordance with

the intended Sequence of Operations -Now it’s your Plan.< Adjust in the field as necessary< Maintain E&S Control Measures< Inspect & Document Performance

E&S Control Workshop 2002

PTechnical Requirements are found in:< Standard Specifications

– Section 203 Excavation and Embankment– Section 209 Soil Erosion and Sediment Control– Section 610 Turf and Wildflower Establishment– Section 612 Sodding

< Permits– ACOE Section 401 (Water Quality)– ACOE Section 404 (Waterways) (NWP’s)– ACOE Section 9/10 Rivers and Harbors Act (Waterways)– State Pollution Discharge Elimination System (SPDES)– Wetlands (DEC/DOS)– APA / NYCDEP / NYC / etc

E&S Control Workshop 2002

PSPDES Requirements Under NPDES Phase II< Disturbance of More Than 1.0 Ac

– Includes Staging, Plants, Borrow & Spoil Areas< GP-02-01 Construction Activities< NOI Submission 5 Days/60 Days< SWPPP Prepared by a “Qualified Professional”

– PE, RLA, CPESC, CWQS, CSS< Inspection and Documentation Requirements< Citizens may file suit

E&S Control Workshop 2002

PApplications:< Prevent Erosion

– Reduce Disturbance / Exposure– Grading (Divert clean water when possible)– Surface Treatments (Mulch, Seed & Mulch, RECP (Blankets) – Reduce Velocity in ditches (Linings, Check Dams)

< Collect Sediment– Silt Fences, Check Dams

< Provide Retention/Detention– Sediment Basins, Traps

PWe CANNOT/DO NOT FILTER WATER

E&S Control Workshop

PNew Provisions of Section 209:< No Explicit Area Limits -Open Only What You Can

Maintain– On-site mulching/seeding capability– On-site stockpile of materials

< Maintenance and Inspection Requirements< Erosion Control Supervisor

E&S Control Workshop 2002

PArea Treatment Measures< Temporary Seed/ Seed & Mulch< RECP (Erosion Control Blankets)< Soil Stabilizers< Construction Entrances

– Where dictated by the contract documents

E&S Control Workshop 2002

PVelocity Control Measures< Check Dam -Stone/Sand Bag/Gravel Bag< Check Dam -Silt Fence< Check Dam -Prefab

E&S Control Workshop 2002

PSediment Control< Haybale/Strawbale/Silt Fence< Sediment Traps< Inlet Protection< Pipe Inlet/Outlet Protection

POther < Pipe Slope Drains< Turbidity Curtain

E&S Control Workshop 2002

PNYSDOT Training and Staffing< E&S Control Training for approx 80-100 NYSDOT

personnel annually< Environmental Coordinator for each Regional

Construction & Maintenance Group (CEC/MEC)– Resource person for the EIC/Contractor

< Contractor Workshops< Regional Construction Winter Meetings< Regional AGC/DOT Meetings< Outreach/Partnering with Regulatory Agencies

Resources

P“Blue Book” -NY Guidelines for Urban E&SCPNY Contractor’s E&SC Field NotebookPNYS Stormwater Management Design ManualPStd Specifications 203/209/610/612/615PSection 209 -Metric Standard SheetsPPermits (401, ACoE 404, Wetlands, SPDES, etc.)PConstruction Inspection Manual (MURK 1B)PHDM Chapter 8

Questions????