27
Carl Van Geem Senior Researcher Monitoring and testing needs for road asset maintenance management. Carl Van Geem, Tim Massart ERPUG 2019 - Vilnius

Upload: others

Post on 28-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Carl

Van Geem

Senior Researcher

Monitoring and testing needs for road

asset maintenance management.

Carl Van Geem, Tim Massart

ERPUG 2019 - Vilnius

Page 2: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Results of a survey in Belgium in 2019.

Objective:

understand what are the (monitoring) needs for AMS purposes

and

start thinking from the start: where do we need roads for?

Page 3: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Approach of the survey

• BRRC-internal note about context and current use

• Checked with external experts (in “BRRC technical committee”)

• Questionnaire (announced to the road sector in Belgium)

• 2 Workshops (with topics related to outcome of questionnaire)

Page 4: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Warning:

• Only 30 responses on questionnaire

• Only 8 participants in the workshops

So, even with the wide variety of type of respondents,

the sample is too small for definite conclusions !

Page 5: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Questionnaire

Page 6: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Finding 1: there are 3 levels

• Project level

– Can be improved

• Optimised preservation of existing road assets

– Needs a global appreciation of current conditions

• Asset management

– Needs identification of current and future expectations

and a long term vision

Page 7: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Project level: drawing up technical specifications

Choice of adequate maintenance method, causes of distress

• determine causes by inspections, measurements, lab-tests

Quality of road works: to be foreseen during preparations

• follow-up during road works

• quality control after road works

Page 8: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Choice of adequate maintenance method

• Water management?

• Cause of distress?

From cause to maintenance, e.g. “catalogue of damage” (http://docs.wegenenverkeer.be/Publicaties/Schadecatalogus.pdf) in Dutch.

A role for monitoring and measurements!

Page 9: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Choice of adequate maintenance method

Bearing capacity:

• pavement structure?

• deflections?

• traffic loads?

• busses?

• rat-run traffic?

A role for monitoring and measurements!

Page 10: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Prepare intervention: find cables and sewer pipes

GPR utilities in factory yard

© A. Ristić, GPR applied to detection and localization of utilities in urban areas, Road Show of COST action TU1208, Osijek, 2017

A role for monitoring and measurements!

Page 11: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Quality of road works:

“Good practice”

• Follow-up of materials used

• Follow-up of conditions during execution of works

“Existing requirements”

• Longitudinal evenness

• Skid resistance

A role for monitoring and measurements!

Page 12: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Optimised preservation of existing road assets

Current feeling: too little budget for all necessary road works

Finding 2: few network management in municipalities

• Many cities and municipalities only think about how to efficiently

execute the few road works for which they have a budget.

• There is a “backlog”… usually the priorities are not set from a

global overview of the current condition of the road network.

Page 13: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Optimised preservation of existing road assets: a PMS approach

Management by regional NRA’s:

surface defects PMS bearing capacity

Fla

nd

ers

Wal

lon

iaA role for monitoring and measurements!

Page 14: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

City of Ghent: rich inventory, yearly condition evaluation© I. Devreese (City of Ghent), Wegen Informatie Systeem, on the Day “Beheer van Wegen” of CEDUBO, 3 December 2015.

Quality (score A – E)

Map and data (e.g. surface material)

A role for monitoring and measurements!

Page 15: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Optimised preservation of existing road assets: a PMS approach

BRRC method used by some cities and municipalities:

C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure, Zadar, 17-19 May 2018.

C. Van Geem, T. Massart, Quality Insurance of Visual Inspections for Pavement Management of Communal Road Networks, WCPAM 2017, Milano, 12-16 June 2017.

C. Van Geem, C. Casse, T. Adolfs, K. Diederiks, ViaBEL – A Tool for Decision Processes in Pavement Management of Secondary Road Networks in Belgium, EPAM 4, Malmö, 2012.

visual inspection

training courses

PMS

A role for monitoring and measurements!

Page 16: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Example in City of Namur:https://www.namur.be/fr/ma-ville/mobilite/voiries/entretien-des-voiries-communales

Communication: road administrator explains to the population about rational maintenance policy• Coating: 5€/m2 (2 days of road works on average)

• Replacing top layer: 20€/m2 (2 weeks of road works)

• Reconstruction: 85€/m2 (more than 6 months of road works)

• Maintenance at the right moment prevents early need for more important road works.

First plan based on a global appreciation of the current condition of the roads in the network.

Next step:

regular and systematic visual

inspections for pavement management

A role for monitoring and measurements!

Page 17: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Example elsewhere: multifunctional deviceKaiserslautern (2011, 2018):

TÜV Reinland Schniering Heller Ingenieurgeselschaft(measurements with “ARGUS”) (PMS interpretation)

cf. https://www.heller-ig.de/ar/news/newsdetails/stadt-kaiserslautern-laesst-strassennetz-bewerten-251/

A role for monitoring and measurements!

Page 18: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Asset Management

• What is the real budget needed for maintenance?

• What are the needs and expectations for the future?

• How to adapt infrastructure to future mobility needs?

– Maybe a declassification of some roads

– Pavement design according to new mobility needs

Page 19: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Expectations according to the answers to the questionnaire

1. Safety and Comfort

2. Traffic fluidity, parking, aesthetics, …

3. Maintenance efficiency: budget assignment

4. Environmental issues

Not important: economic development…

As was expected…

Page 20: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Continuous monitoring (cf. questionnaire)

• Check quality of materials used

• After interventions related to sewer or cable networks

• Monitoring during road works

• Looking for surface defects

• Budget “monitoring”

Daily routine and budget control…

Page 21: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Monitoring every 2 years (cf. questionnaire)

• Retro-reflection of markings

• Skid resistance, longitudinal evenness

• Traffic related noise, deflections, air quality, traffic density

This is not at all done (except on main roads):

probably we get this response because we asked…

• Similar results for cycle paths and sidewalks…

Page 22: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Workshops

Describe work flows of today and tomorrow

(at municipalities ≈ 90% of all roads in Belgium)

Page 23: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Processes (Workshops): TODAY

network approach

Availablebudget

network owner (municipalities)

consultancy bureau

builder

subsidies

project

complaints

priorities

budget control

externalplanning

Technical specifications control

Page 24: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

Processes (Workshops): TOMORROW

Project

Measurements, analysis

Intervention planning

Regular maintenance

builder

control

expectations

indicators

monitoring networkTechnical specifications

contractor

ORsome

database

Page 25: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

“some database”… going for BIM, example elsewhere:

Essen (2017)

Collaboration with Trimble (lidar + 3D reconstruction, GPR,huge geo-database of existing assets for asset management)

cf. https://www.essen.de/meldungen/pressemeldung_1081249.de.html

Page 26: ERPUG 2019 - Vilnius · C. Van Geem, T. Massart, Implementation and Benefits of a Low Cost PMS for Municipal Road Networks, 5th International Conference on Road and Rail Infrastructure,

(prudent) conclusions

• Project level: – need for more effort in preparations (with role for measurements)

– difficulty: current emphasis is on ”budget management”

• Asset preservation: – need for systematic approach: a role for different types of measurements

• Managing for the future:– need for global picture of expectations, then strategic choices must be made

– regular monitoring of expectations