erp 101: procurement - link your vendors and purchase part via erp

19
ERP 101 Purchasing and Vendor Control David Bush Senior Manufacturing Consultant, Rootstock

Upload: rootstock-software

Post on 27-Jan-2017

82 views

Category:

Software


3 download

TRANSCRIPT

Page 1: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

ERP 101Purchasing and Vendor ControlDavid BushSenior Manufacturing Consultant,Rootstock

Page 2: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
Page 3: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

The ERP 101 Webinar SeriesDate Topic

Aug 2, 2016 An Introduction to ERP for Manufacturing

Aug 16, 2016 Engineering – Learn how to create Part Master Records and Bills of Material

Aug 30, 2016 Engineering – Learn how Change Orders and/or Revisions ensures that ERP system data is accurate and up-to-date

Oct 11, 2016 Shop Floor – Explore how ERP is used to create and maintain Work Centers, Routings and Procedures

Nov 1, 2016 Shop Floor – See how scheduling the Shop Floor through ERP controls Labor and Machines

Nov 29, 2016 Procurement – Link your Vendors and Purchased Parts via ERP

Dec 13, 2016 MRP – Step through an overview of this vital ERP subset

TBA Work Orders – The starting point of manufacturing

TBA Inventory - Maintaining Accurate and Reliable Data

TBA Sales – See how you can link your Customers and Products via ERP

TBA Manufacturing Accounting – An overview using standard cost

TBA Manufacturing Accounting – An overview using weighted cost

Page 4: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Meet Our SpeakerDavid BushSenior Manufacturing Consultant, Rootstock• 30+ years of manufacturing and MRP/ERP

systems experience• Previously at General Microcircuits,

Consona Corporation, Relevant Business Systems, Inc

Page 5: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

A Quick Recap• Last 4 Webinars focused on specific

manufacturing issues:– Part Numbers and BOMs define material side of

production– Engineering typically defines both part numbers and

BOMs– Revision and/or ECO’s make sure demands are based

on current configurations– Shop Floor Control focuses on the manufacturing side

of production– Work Centers and processes defined as used during

manufacturing steps– Part Routings provide means for ERP to do Capacity

Planning

Page 6: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Moving to Procurement• Procurement and Vendor Control support the

material side of manufacturing– “Procurement’ is the act of purchasing parts for

production or other areas of the company• Three types:

– Direct Parts used to manufacture items• Coded as ‘Purchased’ when created in Engineering• Planned by MRP

– Indirect Parts support manufacturing but not called out on BOMs• Might include lubricants, gloves, other shop-floor supplies

or office supplies– ‘Service Items’, often paid by the hour, such as copy

machine repairs

Page 7: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Managing Vendors in the ERP System• Vendor Control adds and maintains

vendor records• Item/Vendor records link specific parts

to specific vendors.• Historical Data provides means to do

vendor analysis • Links to Accounts Payable allows ERP

to handle 3-way matching to ensure the timely and accurate payment of invoices.

Page 8: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

The Bigger Picture

MRP Engine

Material Demands from Sales Orders and Work Orders

Purchased Item Master used by planning

MRP creates suggested requisitions

Manual requisitions Manual PO’s created without requisitions

POs placed with vendors

PO Receipts bring material to stores

Conversion process turns

requisitions into POs

Page 9: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Building the Procurement Database• Parts are entered into the Engineering Item Master, but,

when purchased, have unique information to be entered and maintained. This calls for a Purchased Item Master record.

• Vendors require their own individual records to hold information planners need to make good decisions.

• When parts are purchased from a vendor or vendors, unique information about the item/vendor relationship needs to be maintained.– Pricing – Units of Measure– Lead Times– Vendor Part Numbers

Let’s take a closer look at Rootstock objects to see how the ERP system maintains this information.

Page 10: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Components of the Procurement Database

The Procurement Database has three components• The Vendor Master Records• The Purchase Item Master Records• The Item/Vendor Record

Page 11: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

The Vendor Master

• Hold specific data identifying each vendor including Vendor Number, Contact info, Currency, PO template, etc.

• Addresses are used to identify where invoices are paid and where items are shipped from.

• Historical information indicates item purchased from this vendor and recent POs.

Page 12: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

The Purchase Item Master

• Holds data uniquely required for purchasing.– Direct, Indirect and Service Items.

• Generic information not tied to any specific Vendor.• Used by MRP to create accurate requisitions for direct items.

Page 13: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

The Item/Vendor Record

The Item/Vendor record includes:• Vendor’s unique part number.• Vendor’s price• Vendor’s unit of measure

Page 14: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Creating Purchase Orders

• Order Number unique to this PO, automatically generated.• When vendor selected has item/vendor record on hand, their unique data automatically copied to PO line.• Order Status lets buyer know exactly where the PO is. Has it been accepted by the vendor? Has it been received?• Line button allows new item/vendor records to be created on the fly.• Default information comes from several related records. Purchase Commodity Code, Vendor file, Item/Vendor record, etc., and can be overwritten as needed.

Once the PO has been accepted by the Vendor, the receipt transaction can take place.

Page 15: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Performing the PO Receipt

• Receipt Data defaults from PO (date, quantity, location)• May be overwritten as required (note quantity)• Receipt becomes document used by Accounts Payable for 3-way match process• Automatically updates PO line to reflect partial or full receipt.

We have taken a very high look at the procurement tools, but, hopefully, this has demonstrated how ERP both collects data and then uses it to help buyers perform this task.

Page 16: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

The Bigger Picture Revisited

MRP Engine

Material Demands from Sales Orders and Work Orders

Purchased Item Master used by planning

MRP creates suggested requisitions

Manual requisitions Manual PO’s created without requisitions

POs placed with vendors

PO Receipts bring material to stores

Conversion process turns

requisitions into POs

Page 17: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Where Do We Go From Here?We’ve covered the manufacturing (material and labor) sides of ERP, and, today, the Procurement function. Here’s what is coming:

• MRP– Gathers supply and demand information to determine quantities and timing of needed

material.– Creates suggested requisitions and work orders to satisfy demands.

• Work Orders. – Typically created by MRP, work orders are SUPPLIES of manufactured items (subassemblies

and final assemblies) needed to satisfy customer requirements.– Work Orders provide MRP and Capacity planning ‘demands’ on the system for materials and

shop floor capacity.• Order Entry

– Feeds the ‘demand’ side of ERP– Maintains customers, products, orders, etc.

• Inventory– Maintains current balances of direct material– Provides means to issue material as needed to work orders and subcontract purchase orders.

And much more…..

Page 18: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

Q&A

[email protected]

Page 19: ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP

The ERP 101 Webinar SeriesDate Topic

Aug 2, 2016 An Introduction to ERP for Manufacturing

Aug 16, 2016 Engineering – Learn how to create Part Master Records and Bills of Material

Aug 30, 2016 Engineering – Learn how Change Orders and/or Revisions ensures that ERP system data is accurate and up-to-date

Oct 11, 2016 Shop Floor – Explore how ERP is used to create and maintain Work Centers, Routings and Procedures

Nov 1, 2016 Shop Floor – See how scheduling the Shop Floor through ERP controls Labor and Machines

Nov 29, 2016 Procurement – Link your Vendors and Purchased Parts via ERP

Dec 13, 2016 MRP – Step through an overview of this vital ERP subset

TBA Work Orders – The starting point of manufacturing

TBA Inventory - Maintaining Accurate and Reliable Data

TBA Sales – See how you can link your Customers and Products via ERP

TBA Manufacturing Accounting – An overview using standard cost

TBA Manufacturing Accounting – An overview using weighted cost